Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1,786–1,800
- Estimated end · in 258 days
Design & Build - Waterbeach Railway Station
Cambridgeshire County Council · Local authority · Nationwide (UK), East of England
Incumbent: C Spencer Limited · Last contest: 2 bids · awarded 18% under the estimate
This scheme delivers the relocation of Waterbeach Railway Station. Procurement activity includes for the detailed design and construction of the scheme via appointment of a main contractor under NEC Option A/C. The scheme itself constitutes…
- Published value
- £29m
- Annual run-rate
- —start date not published
- Term
- Estimated end 12 Jul 2027 · start not published
- Reference
ocds-h6vhtk-044eb5
- Ends · in 258 days
Interim Clearance and Cleaning
mhs homes group · Other public body · South East England
Incumbent: Clutter-B-Gone
Provisions of Interim Clearance and Cleaning Services
- Published value
- £50k
- Annual run-rate
- £46kpublished value ÷ term, exc. VAT
- Term
- 15 Jun 2026 → 12 Jul 2027 · 1.1 yrs
- Reference
ocds-h6vhtk-06b519
- Estimated end · in 259 days
Mechanical & Electrical
Warwickshire County Council · Local authority · West Midlands
Incumbent: Dodd Group (Midlands) Ltd · Last contest: 7 bids
Warwickshire County Council (WCC) invite bids for the provision of Building, Mechanical and Electrical Property Maintenance (the contract) as part of a suite of services provided to WCC's department of Property Services, Maintenance and Com…
- Published value
- £76m
- Annual run-rate
- —start date not published
- Term
- Estimated end 13 Jul 2027 · start not published
- Reference
ocds-h6vhtk-039987
- Estimated end · in 259 days
Building Maintenance
Warwickshire County Council · Local authority · West Midlands
Incumbent: Arden Construction Ltd · Last contest: 4 bids
Warwickshire County Council (WCC) invite bids for the provision of Building, Mechanical and Electrical Property Maintenance (the contract) as part of a suite of services provided to WCC's department of Property Services, Maintenance and Com…
- Published value
- £66m
- Annual run-rate
- —start date not published
- Term
- Estimated end 13 Jul 2027 · start not published
- Reference
ocds-h6vhtk-039987
- Ends · in 259 days
Floor Coverings
Nuclear Restoration Services Limited · Other public body
Incumbent: Plowmans Carpets
To supply/fit and repair various floor coverings on an ad hoc basis on the NRS Dounreay site.
- Published value
- £175k
- Annual run-rate
- £88kpublished value ÷ term, exc. VAT
- Term
- 15 Jul 2025 → 13 Jul 2027 · 2 yrs
- Reference
ocds-h6vhtk-0562c8
- Ends · in 259 daysExtension option · up to 13 Jul 2031
Provision of Flooring Works at Student Accommodation (Bangor University)
Codi Group Ltd · Other public body · Wales (Cymru)
Incumbent: Idris Contract Flooring Ltd · Last contest: awarded 23% over the estimate
Codi Group (formerly Pobl Group) conducted to an Open Tender process to appoint a contractor for the Provision of Flooring Works at Student Accommodation.
- Published value
- £154k
- Annual run-rate
- £153kpublished value ÷ term, exc. VAT
- Term
- 13 Jul 2026 → 13 Jul 2027 · 1 yr · up to 13 Jul 2031 with extensions
- Reference
ocds-h6vhtk-064cef
- Estimated end · in 260 daysFramework recordPanel · 12 suppliers
Measured Term Framework for Minor Works Projects
NHS Grampian · NHS & health · Scotland
Panel: Burns Construction (Aberdeen) Ltd, Cairn Construction Ltd, Darroch and Allan (Joiners & Builders) Ltd +9 more
- Published value
- £25mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 14 Jul 2027 · start not published
- Reference
ocds-h6vhtk-0429ec
- Estimated end · in 260 daysFramework record
CPF1933-20 Contract for the Maintenance and Improvement to Road Restraint Systems 2023-27
Devon County Council · Local authority · South West England
Incumbent: HW Martin Safety Fencing Limited
- Published value
- £6.0mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 14 Jul 2027 · start not published
- Reference
ocds-h6vhtk-03ace3
- Ends · in 260 daysExtension option
Mampitts Community Hub Construction Contract
Shaftesbury Town Council · Local authority · South West England
Incumbent: A HAMMOND& SONS LTD · Last contest: awarded 3% over the estimate
Appointment of a main supplier for the construction of a new one and a half storey Community Hub at Mampitts Green, Shaftesbury (SP7 8PG). Works include building construction, utilities, external areas, and landscape enhancements that impro…
- Published value
- £1.4m
- Annual run-rate
- £1.7mpublished value ÷ term, exc. VAT
- Term
- 14 Sept 2026 → 14 Jul 2027 · 10 months
- Reference
ocds-h6vhtk-061521
- Estimated end · in 261 days
Hoads Wood Waste Clearance
ENVIRONMENT AGENCY · Other public body · Nationwide (UK)
Incumbent: Acumen Waste Services Limited · Last contest: 5 bids (2 SME) · awarded at the estimate
To undertake the removal and disposal of approximately 30,000T of illegally deposited waste from Hoad’s Wood, Ashford, Kent.
- Published value
- £15m
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Jul 2027 · start not published
- Reference
ocds-h6vhtk-049b24
- Ends · in 261 days
PEABODY LEASEHOLD DECORATIONS CYCLICAL WORKS PROGRAMME NORTH EAST BLOCKS
Peabody Trust Ltd · Other public body
Incumbent: Coldrum Group Ltd
Window replacement, external decorations, Internal decorations, overhaul and decorate windows and doors, repairs to roof, brickwork, rainwater goods, with replace and repairs to communal flooring and bike store and all associated works iden…
- Published value
- £990kinc. VAT as published
- Annual run-rate
- £853kpublished value ÷ term, inc. VAT
- Term
- 18 May 2026 → 15 Jul 2027 · 1.2 yrs
- Reference
ocds-h6vhtk-06d2ed
- Ends · in 261 days
Bleddfa Deer Larder - National Grid upgrade
Natural Resources Wales · Other public body · Wales (Cymru)
Incumbent: National Grid
Contracts Details notice for Bleddfa Deer Larder – National Grid upgrade
- Published value
- £116k
- Annual run-rate
- £118kpublished value ÷ term, exc. VAT
- Term
- 22 Jul 2026 → 15 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06eb40
- Estimated end · in 262 days
Communal Area Health & Safety Check / Service
Nottinghamshire County Council · Local authority · East Midlands
Incumbent: Aaron Services Ltd · Last contest: 2 bids (1 SME)
The Contractor will undertake the servicing, maintenance, repairs, and periodic electrical checks required within ADC’s managed communal housing schemes. The contractor will be tasked with the responsibility to ensure that the services deli…
- Published value
- £253k
- Annual run-rate
- —start date not published
- Term
- Estimated end 16 Jul 2027 · start not published
- Reference
ocds-h6vhtk-046c28
- Estimated end · in 262 days
Contract
the Education Authority · Education · Northern Ireland
Incumbent: Woodvale Construction Company · Last contest: 19 bids (1 SME) · awarded 18% over the estimate
Appointment of Integrated Supply Team for the provision of a new single storey eleven-classroom primary school, with an LIA of 2,083m2, on the site of St Malachy’s Parochial Hall located at the junction of Coalisland Road and Killymeal Road…
Re-procurement plannedAppointment of Integrated Supply Team for Integrated College Dungannon
- Published value
- £7.9m
- Annual run-rate
- —start date not published
- Term
- Estimated end 16 Jul 2027 · start not published
- Reference
ocds-h6vhtk-049c91
- Ends · in 262 days
Refurbishment and re-modelling work to Custom House, King's Lynn
Borough Council of King's Lynn & West Norfolk · Local authority
Incumbent: King and Company Norfolk Ltd · Last contest: awarded 12% over the estimate
The Borough Council of Kings Lynn and West Norfolk is looking for a suitable contractor to undertake re-modelling and refurbishment works to the Grade I listed Custom House property located in Kings Lynn. The Custom House is a stunning 17th…
- Published value
- £1.3m
- Annual run-rate
- £1.5mpublished value ÷ term, exc. VAT
- Term
- 1 Sept 2026 → 16 Jul 2027 · 10 months
- Reference
ocds-h6vhtk-0655a4
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.