Expiring UK Public Contracts: Retender Radar

Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,221–1,230

  1. Ends · in 150 days

    Contract for the provision of interim voids works

    RYKNELD HOMES LIMITED · Other public body · East Midlands

    Incumbent: GAP Property Services (Leicester) Ltd

    This contract is for the provision of work to support the delivery of refurbishment works to empty properties to meet Rykneld Homes lettable standards

    Published value
    £1.2minc. VAT as published
    Annual run-rate
    £1.2mpublished value ÷ term, inc. VAT
    Term
    30 Mar 2026 → 29 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-0673c3
  2. Ends · in 150 days

    The Provision of Roofs at Corby & Mereway Fire Stations and steel works project

    The Police, Fire and Crime Commissioner for Northamptonshire · Police & fire

    Incumbent: Rosbo Limited

    Remedial works to four roofs and improvement to external steel works for Corby and Mereway Wholetime Fire Stations (main building and ancillary bay for each property).

    Published value
    £285k
    Annual run-rate
    £286kpublished value ÷ term, exc. VAT
    Term
    30 Mar 2026 → 29 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-067ac9
  3. Ends · in 150 days

    QQ26052 - Oval Drive Improvement Works

    Wolverhampton City Council · Local authority · West Midlands

    Incumbent: J P LANDSCAPES & CONSTRUCTION LIMITED

    The works comprise site clearance, stump removal, scrub clearance, the supply and installation of play equipment, construction of safety surfaces, tree and shrub planting

    Published value
    £43k
    Annual run-rate
    —not computed
    Term
    29 Sept 2026 → 29 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-078609
  4. Ends · in 150 days

    Power Supply for J2 Server Room Move

    CENTRE FOR PROCESS INNOVATION LIMITED · Other public body · North East England

    Incumbent: JBA Engineering ltd

    To facilitate CPI server room to be moved locations, CPI requires first ranked supplier on it's Electrical Works Framework to provide and install a 63A single-phase dual-feed changeover switch, fed via T-block tap-in box and H-tap-in box co…

    Published value
    £36kinc. VAT as published
    Annual run-rate
    £36kpublished value ÷ term, inc. VAT
    Term
    30 Mar 2026 → 29 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-069a43
  5. Estimated end · in 151 daysFramework recordPanel · 3 suppliers

    TC041 - Proprietary Treatments to Carriageways and Footways Framework

    Manchester City Council · Local authority · North West England

    Panel: JPCS Limited, KIELY BROS LTD, Rosgal Limited

    • Construction, foundation and surface works for highways, roads

    Re-procurement plannedProprietary Treatments to Carriageways and Footways

    Published value
    £24mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 30 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-04bcdd
  6. Estimated end · in 151 days

    WH22007 - Painting & Decorating Services

    Wolverhampton City Council · Local authority · West Midlands

    Incumbent: Tony Davies & Partner LLP · Last contest: 4 bids (3 SME)

    To provide a comprehensive redecoration resource that can be utilised for the delivery of maintenance to external elements of properties, communal areas of multi occupancy dwellings and internal rooms of properties following major works, vo…

    • Painting work
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 30 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-039604
  7. Ends · in 151 days

    Stage 1 - PCSA

    Maidstone Borough Council · Local authority · South East England

    Incumbent: Hill Partnerships Ltd · Last contest: awarded 10% under the estimate

    Maidstone Borough Council (MBC) will appoint a contractor to provide high-quality design and construction works to deliver a residential dwellings development.

    Published value
    £2.2m
    Annual run-rate
    £2.2mpublished value ÷ term, exc. VAT
    Term
    25 Mar 2026 → 30 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-056986
  8. Ends · in 151 days

    16 Church Street (Shades) enabling works

    Hartlepool Borough Council · Local authority · North East England

    Incumbent: Historic Property Restoration Ltd

    16 Church Street (Shades) enabling works, including temporary propping works, faience works and bressummer replacement.

    Published value
    £613k
    Annual run-rate
    —not computed
    Term
    10 Oct 2026 → 30 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-06ec8d
  9. Ends · in 151 daysExtension option · up to 30 Mar 2029

    DESIGN AND BUILD OF PARKLETS

    London Borough of Wandsworth · Local authority · Greater London

    Incumbent: Meristem Design Limited

    Design, Build and delivery of Parklets in Wandsworth Borough Council

    Published value
    £375k
    Annual run-rate
    £287kpublished value ÷ term, exc. VAT
    Term
    9 Dec 2025 → 30 Mar 2027 · 1.3 yrs · up to 30 Mar 2029 with extensions
    Reference
    ocds-h6vhtk-0544d5
  10. Ends · in 151 days

    Carriageway Resurfacing 2026/27

    St Helens Council · Local authority · North West England

    Incumbent: J. HOPKINS (CONTRACTORS) LIMITED

    Carriageway Resurfacing Works 2026/27. It is anticipated there will be around around 30 schemes during the contract term.

    Published value
    £125k
    Annual run-rate
    £125kpublished value ÷ term, exc. VAT
    Term
    31 Mar 2026 → 30 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-05fef5

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,867 contracts and agreements end within 24 months, 4,773 in total · £6.0bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months941
  2. 3–6 months578
  3. 6–12 months609
  4. 12–24 months739

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.