Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,831–1,845

  1. Ends · in 276 days

    Hope School Relocation Main Works

    Wigan Council · Local authority · North West England

    Incumbent: Conlon Construction Limited · Last contest: awarded at the estimate

    Wigan Council are seeking to procure the main construction works for the relocation of Hope School and College to the Central Park Site, Montrose Avenue, Wigan. The school is a SEND school for severe learning difficulties and profound and c…

    Published value
    £18m
    Annual run-rate
    £20mpublished value ÷ term, exc. VAT
    Term
    7 Sept 2026 → 30 Jul 2027 · 11 months
    Reference
    ocds-h6vhtk-056700
  2. Ends · in 276 days

    Milford Haven Public Transport Interchange

    Pembrokeshire County Council · Local authority · Wales (Cymru)

    Incumbent: Balfour Beatty Rail Ltd (a1 a4 a5 a6 a7 a9 a10 a11 a12 b1 b2 b3 b4 b5 b6 b7 c1 c2 c3 c4 c5 c6 c7 d1 d2 d3 d4) · Last contest: awarded 42% under the estimate

    The scheme involves improvement works to the existing Milford Haven train station to create a new public transport interchange. This involves the relocation of the existing rail platform to allow for the provision of a new bus interchange, …

    Published value
    £7.8m
    Annual run-rate
    £6.6mpublished value ÷ term, exc. VAT
    Term
    27 May 2026 → 30 Jul 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-052147
  3. Ends · in 276 days

    Gassiot House 1st Floor Refurbishment

    Guy's and St Thomas' NHS Foundation Trust · Central government · Nationwide (UK), Greater London

    Incumbent: T&B Contractors Limited

    Gassiot House 1st Floor Refurbishment works (D&B).

    Published value
    £3.0m
    Annual run-rate
    £2.8mpublished value ÷ term, exc. VAT
    Term
    10 Jul 2026 → 30 Jul 2027 · 1.1 yrs
    Reference
    ocds-h6vhtk-06e8e4
  4. Ends · in 276 days

    Stepaside

    COASTLINE DESIGN AND BUILD LIMITED · Other public body · South West England

    Incumbent: Restormel Building Contractors Ltd

    Construction of 9 Affordable homes and associated infrastructure.

    Published value
    £1.9minc. VAT as published
    Annual run-rate
    £1.5mpublished value ÷ term, inc. VAT
    Term
    23 Apr 2026 → 30 Jul 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-05f02b
  5. Ends · in 276 days

    NKDC 25B Southgate

    North Kesteven District Council · Local authority · East Midlands

    Incumbent: BuildManager Construction

    Building and landscaping renovations to 25B Southgate, Sleaford

    Published value
    £385k
    Annual run-rate
    £386kpublished value ÷ term, exc. VAT
    Term
    1 Aug 2026 → 30 Jul 2027 · 1 yr
    Reference
    ocds-h6vhtk-06bf7c
  6. Estimated end · in 277 daysFramework recordPanel · 5 suppliers

    Scape Regional Construction Framework

    Scape Procure Limited (trading as SCAPE) · Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Panel: G F Tomlinson Building Limited, Jeakins Weir Limited, LINDUM GROUP LIMITED +2 more

    • Construction work
    Published value
    £750mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 31 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-02b929
  7. Estimated end · in 277 daysCall-off

    Lot 6 - South West £0 - £10m

    Scape Procure Limited (trading as SCAPE) · Nationwide (UK), East of England

    Incumbent: Conamar Building Services Limited

    • Construction work
    Published value
    £38mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 31 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-02ea2a
  8. Estimated end · in 277 daysCall-off

    Lot 7 - South East £0 - £10m

    Scape Procure Limited (trading as SCAPE) · Nationwide (UK), East of England

    Incumbent: Clegg Construction Limited

    • Construction work
    Published value
    £38mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 31 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-02ea2a
  9. Estimated end · in 277 daysCall-off

    South East; Projects from 0 Up to a value of £10,000,000.

    Scape Procure Limited (trading as SCAPE) · Nationwide (UK), East of England

    Incumbent: R.G. Carter Cambridge Limited

    • Construction work
    Published value
    £38mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 31 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-02ea2a
  10. Estimated end · in 277 daysCall-off

    South West; Projects from 0 Up to a value of £10,000,000.

    Scape Procure Limited (trading as SCAPE) · Nationwide (UK), East of England

    Incumbent: Ashe Construction Limited

    The BBC uses social publishing to help inform, educate and entertain our audiences across BBC News, Sport, iPlayer, Sounds and a range of other areas. In total, the BBC has hundreds of social media accounts to promote services, engage and e…

    • Construction work
    Published value
    £38mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 31 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-02ea2a
  11. Ends · in 277 days

    Housing Maintenance - Project 1

    Welwyn Hatfield Borough Council · Local authority · East of England

    Incumbent: Gracelands Complete Maintenance Services Limited · Last contest: 19 bids (19 SME)

    Welwyn Hatfield Borough Council is seeking tenders for planned works on the inside of council properties. Including Kitchens, Bathroom and Electrics

    • Installation of fitted kitchens
    Published value
    £28m
    Annual run-rate
    —start date not published
    Term
    Ends 31 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-0486d5
  12. Ends · in 277 daysFramework record

    Framework for the Survey, Design, Supply, Install, Remove, Recondition and/ or Store of Stairlifts and Associated Works in the Community.

    Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Active Solutions - Sports Physio Limited

    • Construction work
    Published value
    £3.2mlargest agreement; total ceiling not published
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 31 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-04d083
  13. Ends · in 277 days

    PRN25043 (PF23-044) Killynure Green

    Choice Housing Ireland Limited · Other public body · Northern Ireland

    Incumbent: Michael Donaghy (Painting & Decorating Contractor) Limited · Last contest: awarded at the estimate

    Choice wish to appoint a suitably experienced contractor to complete works to stop water ingress and condensation along with extensive redecoration works. Please read tender documents for full description of the works.

    Published value
    £1.1minc. VAT as published
    Annual run-rate
    £1.3mpublished value ÷ term, inc. VAT
    Term
    21 Sept 2026 → 31 Jul 2027 · 10 months
    Reference
    ocds-h6vhtk-05d342
  14. Ends · in 277 days

    Shaft Headworks Concrete Cutting & Removal

    Nuclear Restoration Services Limited · Other public body

    Incumbent: Core Cut Ltd

    The scope of the Shaft Headworks, also referred to as the ‘Works’ is to cut and remove all sections of the cover and capping slabs that overhang and thereby reduce the clear opening of the Shaft, including the overhanging permanent formwork…

    Published value
    £853k
    Annual run-rate
    £1.0mpublished value ÷ term, exc. VAT
    Term
    1 Oct 2026 → 31 Jul 2027 · 10 months
    Reference
    ocds-h6vhtk-0774c4
  15. Ends · in 277 daysFramework recordPanel · 2 suppliers

    Framework for Vertical Through-Floor Lifts

    Durham County Council · Local authority · North East England

    Panel: GLC PROJECTS LTD, Sirius Demolition

    • Construction work
    Published value
    £800klargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-04d3f1

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.