Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1,891–1,905
- Ends · in 290 daysExtension option · up to 15 Aug 2030
Refurbishment of utility blocks 1 and 2 Middle Ground
Oxfordshire County Council · Local authority · Nationwide (UK)
Incumbent: CURTIS BUILDING SERVICES LIMITED
Refurbishment of utility blocks 7 and 8, to include new bathrooms and kitchens, new heating, rewiring, redecoration, new flooring and associated works.
- Published value
- £107k
- Annual run-rate
- £99kpublished value ÷ term, exc. VAT
- Term
- 15 Jul 2026 → 13 Aug 2027 · 1.1 yrs · up to 15 Aug 2030 with extensions
- Reference
ocds-h6vhtk-077557
- Ends · in 290 days
Works
NOTTING HILL GENESIS · Other public body · Greater London
Incumbent: POSH MAINTENANCE (SOUTH-EAST) LIMITED
Building Works
- Published value
- £35k
- Annual run-rate
- £19kpublished value ÷ term, exc. VAT
- Term
- 24 Sept 2025 → 13 Aug 2027 · 1.9 yrs
- Reference
ocds-h6vhtk-078b40
- Estimated end · in 292 days
Damp & Mould Remedials Contract
Babergh District Council · Local authority · East of England
Incumbent: Principle Construction And Maintenance Ltd · Last contest: 4 bids (4 SME)
Babergh District Council and Mid Suffolk District Council are looking to jointly procure one Contractor for the delivery of their Damp andMould Remedial Works Contract.The estimated annual combined contract values are circa GBP250000.00 to …
- Published value
- £1.8m
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0495f2
- Estimated end · in 292 days
Damp & Mould Remedial Consultancy Contract
Babergh District Council · Local authority · East of England
Incumbent: Compliance 100 Ltd · Last contest: 4 bids (4 SME)
- Published value
- £1.3m
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0495f2
- Estimated end · in 292 days
DMNV 028 - Biochar Pyrolysis Production Plant - Ludlow
Shropshire Council · Local authority · West Midlands
Incumbent: Biodynamic Carbon Limited · Last contest: 2 bids (2 SME) · awarded 43% over the estimate
This is an award notice for the design, procurement, construction, commissioning and operation and maintenance of a biomass Pyrolysis Plant. This includes the provision of instrumentation, control and automation of the equipment, civils and…
- Published value
- £1.6m
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Aug 2027 · start not published
- Reference
ocds-h6vhtk-046fb4
- Ends · in 293 daysExtension option · up to 16 Aug 2028
Solar PV supply and installations works
East Midlands Housing Group · Housing · East Midlands
Incumbent: Phoenix Gas Services Ltd
To supply and install Solar PV to social housing.
- Published value
- £2.0m
- Annual run-rate
- £2.0mpublished value ÷ term, exc. VAT
- Term
- 17 Aug 2026 → 16 Aug 2027 · 1 yr · up to 16 Aug 2028 with extensions
- Reference
ocds-h6vhtk-06e57f
- Ends · in 293 days
Office Works
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: James Roofing & Construction Ltd
Capital Expenditure Goodmayes Relocate Estates 1. Strip Out & Enabling Works Provide all labour, plant, supervision, access equipment and waste disposal required to complete the initial strip out and preparation works. 2. Acoustic, Fire-Rat…
- Published value
- £156k
- Annual run-rate
- £156kpublished value ÷ term, exc. VAT
- Term
- 17 Aug 2026 → 16 Aug 2027 · 1 yr
- Reference
ocds-h6vhtk-06e929
- Ends · in 294 days
Replacement air conditioning unit Cavendish Road.
Stevenage Borough Council · Local authority · East of England
Incumbent: Pitkin and Ruddock
Cavendish Road. Replacement air conditioning units to serve the Server Room.
- Published value
- £29k
- Annual run-rate
- £29kpublished value ÷ term, exc. VAT
- Term
- 17 Aug 2026 → 17 Aug 2027 · 1 yr
- Reference
ocds-h6vhtk-0773c1
- Estimated end · in 296 days
Hawkwood Road Redevelopment - Main Build
Bournemouth, Christchurch and Poole Council · Local authority · South West England
Incumbent: AJC Developments (South) Ltd · Last contest: 4 bids (4 SME)
The construction of 68 residential flats and a medical centre over three buildings, creation of a new park, bike stores, refuse bin stores, associated parking, any highway works required and all associated hard and soft landscaping at the m…
- Published value
- £18m
- Annual run-rate
- —start date not published
- Term
- Estimated end 19 Aug 2027 · start not published
- Reference
ocds-h6vhtk-04b0da
- Ends · in 296 days
Harrington Hill Primary School - Appointment of a multi disciplinary consultant to design, manage and provide contract administration
London Borough of Hackney · Local authority · Greater London
Incumbent: Daniel Connal LLP
Appointment of a multi disciplinary consultant to design, manage and provide contract administration for the project to provide a safe and suitable play area to support the Council’s school reorganisation strategy.
- Published value
- £33k
- Annual run-rate
- £22kpublished value ÷ term, exc. VAT
- Term
- 9 Feb 2026 → 19 Aug 2027 · 1.5 yrs
- Reference
ocds-h6vhtk-064a1b
- Ends · in 297 days
Kitchen Refurb
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: James Roofing & Construction Ltd
Capital Expenditure Brookside Kitchen Refurbishment Strip Out Works Preparation and Temporary Facilities Wall Cladding Installation Works Fixtures, Fabrication, Mechanical Installations and Completion Works Mechanical Ventilation Works Addi…
- Published value
- £19k
- Annual run-rate
- £19kpublished value ÷ term, exc. VAT
- Term
- 19 Aug 2026 → 20 Aug 2027 · 1 yr
- Reference
ocds-h6vhtk-06e92a
- Estimated end · in 298 daysCall-off
Abri- Design Supply and Installation of CAT2 MMC system at Sherecroft Farm Botley
Abri Group Limited · Nationwide (UK), South East England
Incumbent: SAINT-GOBAIN PAM UK · Last contest: 2 bids (0 SME)
- Published value
- £2.0mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 21 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0329e1
- Ends · in 300 days
CAPRO120 Lift Autodialler GSM Upgrade and SIM Service Provision
Somerset NHS Foundation Trust · Central government · South West England
Incumbent: JACKSON LIFT SERVICES LIMITED
Supply & Fit GSM Compatible Unit to Existing Auto Dialler (SIM Excluded) Supply & Fit GSM Aerial Extension for Improved Signal. Annual Rental & Call Charges For Auto Dialler SIM Card.
- Published value
- £13k
- Annual run-rate
- £13kpublished value ÷ term, exc. VAT
- Term
- 24 Aug 2026 → 23 Aug 2027 · 1 yr
- Reference
ocds-h6vhtk-07768f
- Ends · in 301 daysExtension option · up to 24 Aug 2028Panel · 2 suppliers
External Cyclical Painting
Aspire Housing · Other public body · West Midlands
Panel: Hankinson Whittle Programs Limited, IAN WILLIAMS
Aspire are looking to appoint 2 contractors to deliver the external cyclical painting programme for FY26/27 - Commencing June 2026. With the option to extend and allow for FY27/28 Programme to be issued as well. The budget is £350,000 per y…
- Published value
- £700kinc. VAT as published
- Annual run-rate
- —panel, not one supplier
- Term
- 24 Aug 2026 → 24 Aug 2027 · 1 yr · up to 24 Aug 2028 with extensions
- Reference
ocds-h6vhtk-06eafe
- Ends · in 302 days
INVITATION TO TENDER (ITT) for the provision of Trinity Primary School - Roofing Replacement Works
Herefordshire Council · Local authority · West Midlands
Incumbent: Ice Roofing and Cladding Ltd · Last contest: awarded 37% under the estimate
Herefordshire Council has appointed a contractor to carry out the roofing replacement works at Trinity Primary School. The project will involve replacing the current failed roofing system to three areas, replacing existing rooflights and ce…
- Published value
- £308k
- Annual run-rate
- £245kpublished value ÷ term, exc. VAT
- Term
- 25 May 2026 → 25 Aug 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-064a78
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.