  1. Estimated end · in 310 daysFramework recordPanel · 5 suppliers

    FW096 Permanent Way Works Delivery Framework

    Translink · Northern Ireland

    Panel: ADMAN CIVIL PROJECTS LIMITED, BABCOCK RAIL LIMITED, FP McCann Ltd +2 more

    • Railway construction works
    Published value
    £1largest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 2 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-03b0f6
  2. Ends · in 310 daysExtension option · up to 2 Sept 2028

    Planned Investment Works Windows and Doors FY27

    Your Housing Group · Housing · North West England

    Incumbent: Seddon Construction Limited

    YHG has a programme of planned investment works to replace windows and doors in its properties in FY27. This contract is to carry out these works at addresses in YHG's portfolio in the North West. Contingency for asbestos risk and other con…

    Published value
    £2.0minc. VAT as published
    Annual run-rate
    £2.0mpublished value ÷ term, inc. VAT
    Term
    3 Sept 2026 → 2 Sept 2027 · 1 yr · up to 2 Sept 2028 with extensions
    Reference
    ocds-h6vhtk-06fab5
  3. Estimated end · in 311 days

    Bathrooms

    Accent Group Ltd · North East England

    Incumbent: CLC Contractors Ltd · Last contest: 6 bids (2 SME)

    Accent Housing Ltd is seeking a contractor / contractors to deliver their Kitchen and Bathroom Replacement Planned Works in the North East Region of its portfolio.The Kitchens and Bathrooms will be procured as two separate Lots and Contract…

    • Installation of fitted kitchens
    Published value
    £2.0m
    Annual run-rate
    —start date not published
    Term
    Estimated end 3 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-046fb2
  4. Estimated end · in 311 days

    The Provision of Loughborough University Student Accommodation (LUSA) Development

    Loughborough University · Education · East Midlands

    Incumbent: John Graham Construction Ltd · Last contest: 9 bids · awarded 2% over the estimate

    Student accommodation consisting of circa 550 bedrooms on the Loughborough University campus.

    • Building construction work
    Published value
    £59m
    Annual run-rate
    —start date not published
    Term
    Estimated end 3 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-04db23
  5. Ends · in 311 days

    Bute Dock Caisson Repairs

    Llywodraeth Cymru / Welsh Government · Central government · Nationwide (UK)

    Incumbent: EDWARDS DIVING SERVICES LIMITED

    Welsh Government requires a specialist contractor with proven relevant experience of working in an historic dock, to design and construct repairs to the upper sections of the caisson sufficient located within the historic Cardiff Bay area w…

    Published value
    £135k
    Annual run-rate
    £105kpublished value ÷ term, exc. VAT
    Term
    22 May 2026 → 3 Sept 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-0688eb
  6. Estimated end · in 312 days

    NA

    Ministry of Justice · Central government · Nationwide (UK)

    Incumbent: Galliford Try Construction Limited

    • Boiler installation work
    Published value
    £74m
    Annual run-rate
    —start date not published
    Term
    Estimated end 4 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-078df4
  7. Estimated end · in 312 days

    Voids Works and Reactive Property Maintenance Services

    B3Living · East of England

    Incumbent: Topcoat Construction Ltd · Last contest: 13 bids (4 SME) · awarded at the estimate

    B3Living is seeking to award a Framework Agreement for a maximum of two Suppliers for the provision of Lot 01: Voids Works and Lot 02: Reactive Property Maintenance Services as described within this Invitation to Tender (ITT): the scope wil…

    • Residential homes construction work
    Published value
    £6.0m
    Annual run-rate
    —start date not published
    Term
    Estimated end 4 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-03d2d2
  8. Estimated end · in 312 daysFramework recordPanel · 5 suppliers

    Fabrication and Machining Framework

    NATIONAL NUCLEAR LABORATORY LIMITED · Nationwide (UK)

    Panel: Bendall's Engineering Limited, Graham Engineering Limited, NT Precision Limited C/O Saint and Co. +2 more

    • Fabrication work

    Re-procurement plannedFabrication and Machining Framework

    Published value
    £4.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 4 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-031f61
  9. Ends · in 312 days

    QQ26030 - Weddell Wynd Fencing

    Wolverhampton City Council · Local authority · West Midlands

    Incumbent: J P LANDSCAPES & CONSTRUCTION LIMITED

    Installation of steel boundary fencing and a single heavy duty steel vehicle barrier.

    Published value
    £36k
    Annual run-rate
    £32kpublished value ÷ term, exc. VAT
    Term
    27 Jul 2026 → 4 Sept 2027 · 1.1 yrs
    Reference
    ocds-h6vhtk-06b4c2
  10. Estimated end · in 314 days

    Homes Improvement and Energy Retrofit programme 2023-2028

    City of York Council · Local authority · Nationwide (UK)

    Incumbent: BM Services · Last contest: 8 bids

    The Works comprise home improvement works and energy efficiency retrofit work including but not limited to: • Surveying for works including relevant Asbestos and EPC surveys • Bathroom Upgrade/Modifications • Kitchen Upgrade/Modifications •…

    • Construction work
    Published value
    £15m
    Annual run-rate
    —start date not published
    Term
    Estimated end 6 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-039381
  11. Estimated end · in 314 days

    Homes Improvement and Energy Retrofit programme 2023-2028

    City of York Council · Local authority · Nationwide (UK)

    Incumbent: Urban Construction Interiors Ltd · Last contest: 8 bids

    The Works comprise home improvement works and energy efficiency retrofit work including but not limited to: • Surveying for works including relevant Asbestos and EPC surveys • Bathroom Upgrade/Modifications • Kitchen Upgrade/Modifications •…

    • Construction work
    Published value
    £15m
    Annual run-rate
    —start date not published
    Term
    Estimated end 6 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-039381
  12. Estimated end · in 314 days

    Contract

    Choice Housing · Northern Ireland

    Incumbent: MCCUSKER CONTRACTS · Last contest: 7 bids (1 SME) · awarded 3% under the estimate

    Choice Housing wishes to appoint an experienced and qualified contractor to carry out Multi Element Improvement (MEI) works to Fitzroy Court, Belfast. The full details of the works are outlined in the tender documents.

    • Installation of fitted kitchens
    Published value
    £2.1m
    Annual run-rate
    —start date not published
    Term
    Estimated end 6 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-047bce
  13. Ends · in 314 days

    COV - Baginton Fields Expansion - Main contractor

    Coventry City Council · Local authority · West Midlands

    Incumbent: Jeakins Weir Limited · Last contest: awarded 15% over the estimate

    Expansion project to include new build, demolition and reprovision of hydrotherapy pool, and refurbishment elements to existing school building

    Published value
    £8.5m
    Annual run-rate
    £5.1mpublished value ÷ term, exc. VAT
    Term
    5 Jan 2026 → 6 Sept 2027 · 1.7 yrs
    Reference
    ocds-h6vhtk-0513f7
  14. Ends · in 314 days

    COV - Baginton Fields Expansion - Main contractor

    Coventry City Council · Local authority · West Midlands

    Incumbent: Jeakins Weir Limited

    Expansion project to include new build, demolition and reprovision of hydrotherapy pool, and refurbishment elements to existing school building

    Published value
    £8.5m
    Annual run-rate
    £5.1mpublished value ÷ term, exc. VAT
    Term
    5 Jan 2026 → 6 Sept 2027 · 1.7 yrs
    Reference
    ocds-h6vhtk-06636d
  15. Ends · in 314 days

    Major Roads-Carriageway Resurfacing Works Contract 2026-2027

    Reading Borough Council · Local authority · South East England

    Incumbent: O'HARA BROS. SURFACING LIMITED

    Major Roads - Carriageway Resurfacing Worksincluding: i) Traffic Management ii) Removal and Disposal iii) Existing Utility and Drainage Covers iv) Surfacing v) Road Markings vi) Existing Drainage

    Published value
    £1.8m
    Annual run-rate
    £1.8mpublished value ÷ term, exc. VAT
    Term
    7 Sept 2026 → 6 Sept 2027 · 1 yr
    Reference
    ocds-h6vhtk-06a733

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.