Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 12 months
Showing 1,311–1,320
- Ends · in 152 days
M42 J6 Bickenhill Structure Scheme – Ground Investigation Works
National Highways Limited · Central government
Incumbent: Tetra Tech
Ground Investigation works for the M42 Junction 6 Bickenhill Structure Scheme. The scope includes intrusive and non-intrusive site investigations, drilling, trial pits, laboratory testing, factual reporting and associated geotechnical servi…
- Published value
- £406k
- Annual run-rate
- £511kpublished value ÷ term, exc. VAT
- Term
- 15 Jun 2026 → 31 Mar 2027 · 10 months
- Reference
ocds-h6vhtk-06b64d
- Ends · in 152 daysExtension option · up to 31 Mar 2028
M&Y Electrical Works Subcontractor Appointment - New Ferry Site A - Cheshire
Regenda Limited · Other public body · North West England
Incumbent: CP Hood Electrical Ltd
M&Y completed a request for quotation exercise to award this below threshold contract to deliver electrical works at construction site New Ferry (site A), in New Ferry, Cheshire
- Published value
- £405k
- Annual run-rate
- £405kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 31 Mar 2027 · 1 yr · up to 31 Mar 2028 with extensions
- Reference
ocds-h6vhtk-068cae
- Ends · in 152 days
Unmetered Street Lighting Connections
City of Bradford Metropolitan District Council · Local authority · Yorkshire and the Humber
Incumbent: Northern Powergrid (Yorkshire) PLC
The provision of new electrical connections, disconnections and transfers of electrical street furniture to the underground electricity network which is the responsibility of Northern Powergrid the Distribution Network Operator (DNO).
- Published value
- £400k
- Annual run-rate
- £452kpublished value ÷ term, exc. VAT
- Term
- 13 May 2026 → 31 Mar 2027 · 11 months
- Reference
ocds-h6vhtk-069794
- Ends · in 152 days
BAS - SP2 & Logistics Boiler Replacement
UK Research and Innovation · Central government · East of England
Incumbent: CPS Building Services Ltd
UKRI has appointed a supplier for the SP2 & Logistics Boiler Replacement at BAS.
- Published value
- £389k
- Annual run-rate
- —not computed
- Term
- 12 Oct 2026 → 31 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-078549
- Ends · in 152 days
US_25229
University of Sussex · Education · South East England
Incumbent: i4 Projects Ltd
Remedial compliance building works in relation to the Chemical Stores on campus
- Published value
- £378k
- Annual run-rate
- £353kpublished value ÷ term, exc. VAT
- Term
- 6 Mar 2026 → 31 Mar 2027 · 1.1 yrs
- Reference
ocds-h6vhtk-066895
- Ends · in 152 days
BAPA costs for Structures Inspections Network Rail
National Highways Limited · Central government
Incumbent: Network Rail
BAPA costs for Structures Inspections Network Rail year 2
- Published value
- £371k
- Annual run-rate
- £402kpublished value ÷ term, exc. VAT
- Term
- 29 Apr 2026 → 31 Mar 2027 · 11 months
- Reference
ocds-h6vhtk-068e1c
- Ends · in 152 days
Windows and Doors Replacement Programme
Wokingham Borough Council · Local authority · Nationwide (UK)
Incumbent: George Jones and Son Limited
FY 26-27 Windows and doors replacement programme for social housing properties owned by WBC.
- Published value
- £370k
- Annual run-rate
- £637kpublished value ÷ term, exc. VAT
- Term
- 1 Sept 2026 → 31 Mar 2027 · 7 months
- Reference
ocds-h6vhtk-06d602
- Ends · in 152 daysExtension option · up to 31 Mar 2028
Brickwork subcontractor appointment for New Ferry Site A
Regenda Limited · Other public body · North West England
Incumbent: MBG Brickwork Ltd
The organisation undertook a Request for Quotation (RFQ) exercise in accordance with its internal procurement procedures and the applicable requirements for below‐threshold works contracts in the UK. The purpose of this exercise was to sour…
- Published value
- £367k
- Annual run-rate
- £367kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 31 Mar 2027 · 1 yr · up to 31 Mar 2028 with extensions
- Reference
ocds-h6vhtk-068c9a
- Ends · in 152 days
WAS-ITT-63475 - Llandrindod Wells
Welsh Ambulance Services NHS Trust · Central government · Wales (Cymru)
Incumbent: SWG Construction (Build and Renovate) Ltd · Last contest: awarded 23% under the estimate
Welsh Ambulance Service University NHS Trust is seeking to appoint a suitably qualified contractor to undertake Internal refurbishment to two industrial units including the installation of jumbo stud walls, suspended ceilings, installation …
- Published value
- £319k
- Annual run-rate
- —term under 6 months
- Term
- 3 Nov 2026 → 31 Mar 2027 · 5 months
- Reference
ocds-h6vhtk-06ce11
- Ends · in 152 days
Seacombe Ferry Terminal Suspended Deck Phase 6 - Guiderail / Handrail Overhaul
Merseytravel · Other public body · North West England
Incumbent: WARBRECK INTERGRATED SERVICES LIMITED
The purpose of this procurement is to appoint a specialist marine engineering contractor to remove and replace all handrails from the specified walkways.
- Published value
- £293k
- Annual run-rate
- £582kpublished value ÷ term, exc. VAT
- Term
- 29 Sept 2026 → 31 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-078b67
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,867 contracts and agreements end within 24 months, 4,773 in total · £6.0bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,62579Business services: law, marketing, consulting2,69445Construction work2,12872IT services: consulting, software, internet1,64060Transport services (except waste transport)1,56671Architectural, construction, engineering1,43450Repair and maintenance services1,40780Education and training services1,273
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.