Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 2,071–2,085

  1. Estimated end · in 355 daysFramework recordPanel · 7 suppliers

    Gentoo - Framework for Mechanical & Electrical Services

    Gentoo Group Limited · North East England

    Panel: Capital UK Electrics Ltd, DFP Services Ltd, Equans Regeneration Ltd +4 more

    • Overhaul and refurbishment work
    Published value
    £5.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 17 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-03e490
  2. Estimated end · in 356 days

    DH21052 - Cyclical Repairs Programme

    Derby Homes Ltd · East Midlands

    Incumbent: BELL GROUP LTD · Last contest: 5 bids · awarded 28% over the estimate

    The Cyclical Repairs Programme (also known as "Repairs Before Painting" involves the repair or renewal of external items to all properties managed by Derby Homes Ltd (The Employer) including gates, fencing, concrete paths, tarmac hard stand…

    • Building construction work
    Published value
    £5.1m
    Annual run-rate
    —start date not published
    Term
    Estimated end 18 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-030f8b
  3. Ends · in 356 days

    Refurbishment of Falklands Garden Fountain

    Gosport Borough Council (GBC) · Local authority · Nationwide (UK)

    Incumbent: Fountains Direct Ltd

    The proposed works to update the fountain's design, water treatment system and maintenance regime to ensure the feature remains operational, safe, compliant with modern health and safety standards, and complementary to the wider People's Pa…

    Published value
    £81k
    Annual run-rate
    £81kpublished value ÷ term, exc. VAT
    Term
    19 Oct 2026 → 18 Oct 2027 · 1 yr
    Reference
    ocds-h6vhtk-0785f0
  4. Ends · in 356 days

    Leeds Jewish Housing Association Fire Door Repairs and Replacement

    Leeds Jewish Housing Association · Housing · Nationwide (UK)

    Incumbent: Keystone Fire Safety Limited · Last contest: 15 bids (15 SME)

    Repairs and Replacements to Fire Doors

    • Construction work
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Ends 18 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-03d5d6
  5. Ends · in 357 days

    Home Group Regeneration - Major Investment Works - Chichester Foyer

    Home Group · Other public body · South East England

    Incumbent: D M HABENS (THE BUILDER) LTD

    Refurbishment and remodelling works to the existing building at Chichester Foyer to reconfigure the internal layout to 23 self-contained modern flats (14 one-bedroom flats and 9 two-bedroom flats). The works include the replacement of windo…

    Published value
    £2.9m
    Annual run-rate
    £2.8mpublished value ÷ term, exc. VAT
    Term
    1 Oct 2026 → 19 Oct 2027 · 1.1 yrs
    Reference
    ocds-h6vhtk-06d52a
  6. Ends · in 357 daysExtension option · up to 19 Oct 2029Buyer plans to re-tender 1 Mar 2029

    Highway Verges & Visibility Cutting Services

    Braintree District Council · Local authority · East of England

    Incumbent: Skippers Ground Maintenance · Last contest: awarded 11% under the estimate

    Essex County Council, through the Essex Procurement Partnership, is procuring Highway Verges & Visibility Cutting Services on behalf of Braintree District Council. 1 Introduction 1.1 Braintree District Council ("the Council") maintains high…

    Published value
    £532k
    Annual run-rate
    £266kpublished value ÷ term, exc. VAT
    Term
    20 Oct 2025 → 19 Oct 2027 · 2 yrs · up to 19 Oct 2029 with extensions
    Reference
    ocds-h6vhtk-050e59
  7. Estimated end · in 359 daysFramework recordPanel · 29 suppliers

    South West Wales Regional Contractors Framework 2024

    Carmarthenshire County Council · Local authority · Wales (Cymru)

    Panel: Andrew Scott Limited, BAM CONSTRUCTION LIMITED, Bouygues UK +26 more

    • Construction work

    Re-procurement openSouth West Wales Regional Civil Engineering Contractors Framework 2027 · bids close

    Published value
    £800mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-043ceb
  8. Ends · in 359 days

    Fire Safety Works

    Phoenix Community Housing · Housing · Greater London, South East England

    Incumbent: CLM Fireproofing Ltd

    Fire Safety Works Across the PCH stock

    Published value
    £300kinc. VAT as published
    Annual run-rate
    £150kpublished value ÷ term, inc. VAT
    Term
    21 Oct 2025 → 21 Oct 2027 · 2 yrs
    Reference
    ocds-h6vhtk-067540
  9. Estimated end · in 360 days

    Electrical Contractor Works

    Golding Homes · South East England

    Incumbent: Niblock Building Contractors · Last contest: 39 bids (39 SME)

    Electrical Inspection and Condition Report in communal and domestic properties, as well as any other Golding Homes owned address including commercial units and office. Installation of LD2 system with domestic addresses, which include Aico E…

    • Electrical installation work
    Published value
    £5.0m
    Annual run-rate
    —start date not published
    Term
    Estimated end 22 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-044f91
  10. Ends · in 360 days

    Contract for Labour Only Plastering Works

    City & County of Swansea · Local authority · Wales (Cymru)

    Incumbent: SAM DRYLINING LIMITED · Last contest: awarded 2% over the estimate

    Contract for Labour Only Plastering Works at West Cross, Swansea

    Published value
    £136k
    Annual run-rate
    £127kpublished value ÷ term, exc. VAT
    Term
    28 Sept 2026 → 22 Oct 2027 · 1.1 yrs
    Reference
    ocds-h6vhtk-06bcfb
  11. Ends · in 360 days

    Contract for Removal, Disposal & Renewal of Steel Roof Finishes & Flat Roof Finishes

    City & County of Swansea · Local authority · Wales (Cymru)

    Incumbent: M.A. HARTLEY ROOFING CONTRACTORS LTD

    Contract for Removal, Disposal & Renewal of Steel Roof Finishes & Flat Roof Finishes at West Cross, Swansea

    Published value
    £111k
    Annual run-rate
    £108kpublished value ÷ term, exc. VAT
    Term
    12 Oct 2026 → 22 Oct 2027 · 1 yr
    Reference
    ocds-h6vhtk-06a890
  12. Estimated end · in 362 daysCall-offPanel · 8 suppliers

    Managed Services

    NHS Commercial Solutions · NHS & health · Nationwide (UK)

    Panel: ALTHEA UK AND IRELAND LIMITED, Darwin Group, Genmed.Me Ltd +5 more · Last contest: 8 bids (2 SME)

    • Construction work
    Published value
    £300mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 24 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-04ca23
  13. Estimated end · in 362 daysCall-offPanel · 11 suppliers

    Consultancy Services

    NHS Commercial Solutions · NHS & health · Nationwide (UK)

    Panel: AKERLOF LTD, AVISON YOUNG (UK) LIMITED, Exi Group Holdings Limited +8 more · Last contest: 11 bids (7 SME)

    • Construction work
    Published value
    £150mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 24 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-04ca23
  14. Estimated end · in 362 days

    Aurs Road Upgrade and Realignment and Balgray Reservoir Promenade and Permanent Lowering Works

    East Renfrewshire Council · Local authority · Scotland

    Incumbent: John Graham Construction Ltd · Last contest: 5 bids (2 SME) · awarded 5% under the estimate

    East Renfrewshire Council has now awarded to a suitably qualified company for the Aurs Road Upgrade and Realignment and Balgray Reservoir Promenade and Permanent Lowering Works. The project is part of East Renfrewshire Council's City Deal p…

    • Works for complete or part construction and civil engineering work
    Published value
    £17m
    Annual run-rate
    —start date not published
    Term
    Estimated end 24 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-03c671
  15. Estimated end · in 364 days

    HO MR 24 066 / NLC-SLP-25-124: Revised December 2025 Issue Lanark County Council - Swedish Timbers Full Project Works Package

    North Lanarkshire Council · Local authority · Scotland

    Incumbent: GMG Contractors Ltd · Last contest: 9 bids (8 SME) · awarded 19% under the estimate

    The proposed works will comprise removal of existing timber external wall cladding, new external wall insulated render system, removal of concrete tiles and membrane, extending roof structure at eaves and verges as required, internal insula…

    • Construction work
    Published value
    £6.5m
    Annual run-rate
    —start date not published
    Term
    Estimated end 26 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-05f362

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.