Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 211–225

  1. Ends · in 5 days

    Installation of Lamp Columns along Southend Pier

    Southend-on-Sea City Council · Local authority · East of England

    Incumbent: UKI MECHANICAL LTD

    Installation of lamp columns and associated iron works to facilitate the posts along Southend Pier £58,708.00

    Published value
    £59k
    Annual run-rate
    —term under 6 months
    Term
    1 Aug 2026 → 1 Nov 2026 · 3 months
    Reference
    ocds-h6vhtk-06d534
  2. Ends · in 5 days

    Property Refurbishment Works

    OXFORD DIRECT SERVICES LIMITED · Other public body · South East England

    Incumbent: Chase UK Group

    ODS intends to appoint the supplier to carry out property refurbishment and repair works.

    Published value
    £50kinc. VAT as published
    Annual run-rate
    £50kpublished value ÷ term, inc. VAT
    Term
    1 Nov 2025 → 1 Nov 2026 · 1 yr
    Reference
    ocds-h6vhtk-05d590
  3. Ends · in 5 days

    Whitehall Athletics Track Repair and Clean

    Bristol City Council · Local authority · South West England

    Incumbent: BERNHARDS SPORTS SURFACES LIMITED

    Repair a section of the track and then clean the whole track at Whitehall athletics track

    Published value
    £43k
    Annual run-rate
    —term under 6 months
    Term
    21 Sept 2026 → 1 Nov 2026 · 42 days
    Reference
    ocds-h6vhtk-06d7e0
  4. Ends · in 5 days

    Block Communal Flooring Replacement Works 2025-2026

    Dover District Council · Local authority · South East England

    Incumbent: Crown Flooring Ltd · Last contest: awarded 42% under the estimate

    Dover District Council wishes to select and appoint a suitable contractor to carry out replacement floor covering works to various occupied blocks of flats contained within the Dover District area. The works is anticipated to commence Augus…

    Published value
    £29k
    Annual run-rate
    —term under 6 months
    Term
    21 Sept 2026 → 1 Nov 2026 · 42 days
    Reference
    ocds-h6vhtk-0698b4
  5. Ends · in 6 days

    103 Denmark Hill Main Contractor

    South London and Maudsley NHS Foundation Trust · Central government · Nationwide (UK), Greater London

    Incumbent: T&B Contractors Limited · Last contest: awarded 30% under the estimate

    The project includes building works throughout 103 Denmark Hill, a building comprising of basement, ground, first and second floor, that requires refurbishment to bring it back into a condition that is fit for use as meeting rooms and offic…

    Published value
    £1.1m
    Annual run-rate
    —term under 6 months
    Term
    3 Aug 2026 → 2 Nov 2026 · 3 months
    Reference
    ocds-h6vhtk-06a6b2
  6. Ends · in 6 days

    AM 311 Externals – Trehwfa & Gernant, Bangor

    Adra (Tai) Cyf · Other public body · Wales (Cymru)

    Incumbent: G H James cyf

    Adra (the Client) is seeking the works of suitably qualified and experienced contractors who can provide Re-Roofing, EWI & associated external refurbishment works to 21 occupied properties.

    Published value
    £970k
    Annual run-rate
    £1.5mpublished value ÷ term, exc. VAT
    Term
    9 Mar 2026 → 2 Nov 2026 · 8 months
    Reference
    ocds-h6vhtk-06671b
  7. Ends · in 6 days

    Erection and Subsequent Dismantling of Temporary Crash Deck

    Police and Crime Commissioner for South Wales · Police & fire · Wales (Cymru)

    Incumbent: Nautilus Roofing & Exteriors

    The erection and subsequent dismantling of a temporary crash deck protection to the underside of the building roof structure, to facilitate to safe execution of the roof replacement.

    Published value
    £696kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    16 Jun 2026 → 2 Nov 2026 · 5 months
    Reference
    ocds-h6vhtk-06b6a9
  8. Ends · in 6 days

    Darlington BC, Autumn Schemes 2026

    Darlington Borough Council · Local authority · North East England

    Incumbent: Tarmac Trading Limited

    Darlington BC, Autumn Schemes 2026 - A68 Bondgate, A68 St Augustines Way and C180 Parkside - Carriageway Patching and Resurfacing Works.

    Published value
    £318k
    Annual run-rate
    —term under 6 months
    Term
    12 Oct 2026 → 2 Nov 2026 · 22 days
    Reference
    ocds-h6vhtk-07879b
  9. Ends · in 6 days

    Porth Community School - Re-roofing Phase One

    Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)

    Incumbent: ALPHA BUILDING GROUP LTD

    Porth Community School - Re-roofing Phase One 2026

    Published value
    £285k
    Annual run-rate
    —term under 6 months
    Term
    17 Jul 2026 → 2 Nov 2026 · 4 months
    Reference
    ocds-h6vhtk-06d4ed
  10. Ends · in 6 days

    PLACE1142H A57 Snake Pass Safer Roads Fund Project Road Restraint System Upgrade Contract 2

    Derbyshire County Council · Local authority · East Midlands

    Incumbent: H W Martin Safety Fencing Ltd · Last contest: awarded 52% under the estimate

    This tender is for the upgrade of existing road restraint systems (RRS) along the A57 Snake Pass. This is Contract 2 of 2 for the A57. Contract 1 has been procured separately and is aimed at installing RRS upgrades within the extents of a p…

    Published value
    £144kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    21 Sept 2026 → 2 Nov 2026 · 43 days
    Reference
    ocds-h6vhtk-06959d
  11. Ends · in 6 days

    Kendal Police Station Roof Repairs

    The Police, Fire and Crime Commissioner for Cumbria · Police & fire

    Incumbent: FREDERICK POTTS & SON LIMITED

    A scheme of work has been produced to undertake essential roof repair works at Kendal Police Station. The current condition of the roof presents an increasing risk of water penetration, damage to the building fabric, disruption to operation…

    Published value
    £142k
    Annual run-rate
    —term under 6 months
    Term
    5 Oct 2026 → 2 Nov 2026 · 29 days
    Reference
    ocds-h6vhtk-07866e
  12. Ends · in 6 days

    North Harrow Station Bridge Cleaning and Refurbishment Works

    London Borough of Harrow · Local authority · Greater London

    Incumbent: CC Infrastructure Services

    The appointed contractor will undertake deep cleaning, painting, and stencilled lettering works to North Harrow Station bridge, aimed at significantly improving its visual appearance.

    Published value
    £96k
    Annual run-rate
    £96kpublished value ÷ term, exc. VAT
    Term
    4 Nov 2025 → 2 Nov 2026 · 1 yr
    Reference
    ocds-h6vhtk-05e6b8
  13. Ends · in 6 days

    300 Harrow Road Circular Economy Hub - Partitions, Joinery and associated works

    Westminster City Council · Local authority

    Incumbent: Artek Build Ltd

    Provision of demountable fit out to the ground floor commercial space at 300 Harrow Road. Partitioning and sound proofing the space to create a mix of studios, workshop and exhibition areas.

    Published value
    £94kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    7 Sept 2026 → 2 Nov 2026 · 2 months
    Reference
    ocds-h6vhtk-06f33e
  14. Ends · in 6 days

    Supply and Install of Positive Input Ventilation for various properties at Fforesthall, Penlan and Sketty

    City & County of Swansea · Local authority · Wales (Cymru)

    Incumbent: Mouldex Limited · Last contest: awarded 23% under the estimate

    Supply and Install of Positive Input Ventilation for various properties at Fforesthall, Penlan and Sketty,Swansea

    Published value
    £68k
    Annual run-rate
    £68kpublished value ÷ term, exc. VAT
    Term
    3 Nov 2025 → 2 Nov 2026 · 1 yr
    Reference
    ocds-h6vhtk-0546c6
  15. Ends · in 6 days

    CAS-01392-B8F4B2 - Hillier Road - Further External Decoration Work

    Aster Group Limited · Other public body

    Incumbent: Gaiger Brothers Limited

    Aster Group is a Housing Association that provides homes to thousands of people across the South of England and London. As an organisation, it maintains approx. 37,000 homes and as a social landlord, is responsible for ensuring its stock is…

    Published value
    £30k
    Annual run-rate
    —term under 6 months
    Term
    13 Jul 2026 → 2 Nov 2026 · 4 months
    Reference
    ocds-h6vhtk-06ca6f

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.