Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 211–225
- Ends · in 5 days
Installation of Lamp Columns along Southend Pier
Southend-on-Sea City Council · Local authority · East of England
Incumbent: UKI MECHANICAL LTD
Installation of lamp columns and associated iron works to facilitate the posts along Southend Pier £58,708.00
- Published value
- £59k
- Annual run-rate
- —term under 6 months
- Term
- 1 Aug 2026 → 1 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-06d534
- Ends · in 5 days
Property Refurbishment Works
OXFORD DIRECT SERVICES LIMITED · Other public body · South East England
Incumbent: Chase UK Group
ODS intends to appoint the supplier to carry out property refurbishment and repair works.
- Published value
- £50kinc. VAT as published
- Annual run-rate
- £50kpublished value ÷ term, inc. VAT
- Term
- 1 Nov 2025 → 1 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-05d590
- Ends · in 5 days
Whitehall Athletics Track Repair and Clean
Bristol City Council · Local authority · South West England
Incumbent: BERNHARDS SPORTS SURFACES LIMITED
Repair a section of the track and then clean the whole track at Whitehall athletics track
- Published value
- £43k
- Annual run-rate
- —term under 6 months
- Term
- 21 Sept 2026 → 1 Nov 2026 · 42 days
- Reference
ocds-h6vhtk-06d7e0
- Ends · in 5 days
Block Communal Flooring Replacement Works 2025-2026
Dover District Council · Local authority · South East England
Incumbent: Crown Flooring Ltd · Last contest: awarded 42% under the estimate
Dover District Council wishes to select and appoint a suitable contractor to carry out replacement floor covering works to various occupied blocks of flats contained within the Dover District area. The works is anticipated to commence Augus…
- Published value
- £29k
- Annual run-rate
- —term under 6 months
- Term
- 21 Sept 2026 → 1 Nov 2026 · 42 days
- Reference
ocds-h6vhtk-0698b4
- Ends · in 6 days
103 Denmark Hill Main Contractor
South London and Maudsley NHS Foundation Trust · Central government · Nationwide (UK), Greater London
Incumbent: T&B Contractors Limited · Last contest: awarded 30% under the estimate
The project includes building works throughout 103 Denmark Hill, a building comprising of basement, ground, first and second floor, that requires refurbishment to bring it back into a condition that is fit for use as meeting rooms and offic…
- Published value
- £1.1m
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 2 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-06a6b2
- Ends · in 6 days
AM 311 Externals – Trehwfa & Gernant, Bangor
Adra (Tai) Cyf · Other public body · Wales (Cymru)
Incumbent: G H James cyf
Adra (the Client) is seeking the works of suitably qualified and experienced contractors who can provide Re-Roofing, EWI & associated external refurbishment works to 21 occupied properties.
- Published value
- £970k
- Annual run-rate
- £1.5mpublished value ÷ term, exc. VAT
- Term
- 9 Mar 2026 → 2 Nov 2026 · 8 months
- Reference
ocds-h6vhtk-06671b
- Ends · in 6 days
Erection and Subsequent Dismantling of Temporary Crash Deck
Police and Crime Commissioner for South Wales · Police & fire · Wales (Cymru)
Incumbent: Nautilus Roofing & Exteriors
The erection and subsequent dismantling of a temporary crash deck protection to the underside of the building roof structure, to facilitate to safe execution of the roof replacement.
- Published value
- £696kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 16 Jun 2026 → 2 Nov 2026 · 5 months
- Reference
ocds-h6vhtk-06b6a9
- Ends · in 6 days
Darlington BC, Autumn Schemes 2026
Darlington Borough Council · Local authority · North East England
Incumbent: Tarmac Trading Limited
Darlington BC, Autumn Schemes 2026 - A68 Bondgate, A68 St Augustines Way and C180 Parkside - Carriageway Patching and Resurfacing Works.
- Published value
- £318k
- Annual run-rate
- —term under 6 months
- Term
- 12 Oct 2026 → 2 Nov 2026 · 22 days
- Reference
ocds-h6vhtk-07879b
- Ends · in 6 days
Porth Community School - Re-roofing Phase One
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: ALPHA BUILDING GROUP LTD
Porth Community School - Re-roofing Phase One 2026
- Published value
- £285k
- Annual run-rate
- —term under 6 months
- Term
- 17 Jul 2026 → 2 Nov 2026 · 4 months
- Reference
ocds-h6vhtk-06d4ed
- Ends · in 6 days
PLACE1142H A57 Snake Pass Safer Roads Fund Project Road Restraint System Upgrade Contract 2
Derbyshire County Council · Local authority · East Midlands
Incumbent: H W Martin Safety Fencing Ltd · Last contest: awarded 52% under the estimate
This tender is for the upgrade of existing road restraint systems (RRS) along the A57 Snake Pass. This is Contract 2 of 2 for the A57. Contract 1 has been procured separately and is aimed at installing RRS upgrades within the extents of a p…
- Published value
- £144kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 21 Sept 2026 → 2 Nov 2026 · 43 days
- Reference
ocds-h6vhtk-06959d
- Ends · in 6 days
Kendal Police Station Roof Repairs
The Police, Fire and Crime Commissioner for Cumbria · Police & fire
Incumbent: FREDERICK POTTS & SON LIMITED
A scheme of work has been produced to undertake essential roof repair works at Kendal Police Station. The current condition of the roof presents an increasing risk of water penetration, damage to the building fabric, disruption to operation…
- Published value
- £142k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 2 Nov 2026 · 29 days
- Reference
ocds-h6vhtk-07866e
- Ends · in 6 days
North Harrow Station Bridge Cleaning and Refurbishment Works
London Borough of Harrow · Local authority · Greater London
Incumbent: CC Infrastructure Services
The appointed contractor will undertake deep cleaning, painting, and stencilled lettering works to North Harrow Station bridge, aimed at significantly improving its visual appearance.
- Published value
- £96k
- Annual run-rate
- £96kpublished value ÷ term, exc. VAT
- Term
- 4 Nov 2025 → 2 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-05e6b8
- Ends · in 6 days
300 Harrow Road Circular Economy Hub - Partitions, Joinery and associated works
Westminster City Council · Local authority
Incumbent: Artek Build Ltd
Provision of demountable fit out to the ground floor commercial space at 300 Harrow Road. Partitioning and sound proofing the space to create a mix of studios, workshop and exhibition areas.
- Published value
- £94kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 7 Sept 2026 → 2 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-06f33e
- Ends · in 6 days
Supply and Install of Positive Input Ventilation for various properties at Fforesthall, Penlan and Sketty
City & County of Swansea · Local authority · Wales (Cymru)
Incumbent: Mouldex Limited · Last contest: awarded 23% under the estimate
Supply and Install of Positive Input Ventilation for various properties at Fforesthall, Penlan and Sketty,Swansea
- Published value
- £68k
- Annual run-rate
- £68kpublished value ÷ term, exc. VAT
- Term
- 3 Nov 2025 → 2 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-0546c6
- Ends · in 6 days
CAS-01392-B8F4B2 - Hillier Road - Further External Decoration Work
Aster Group Limited · Other public body
Incumbent: Gaiger Brothers Limited
Aster Group is a Housing Association that provides homes to thousands of people across the South of England and London. As an organisation, it maintains approx. 37,000 homes and as a social landlord, is responsible for ensuring its stock is…
- Published value
- £30k
- Annual run-rate
- —term under 6 months
- Term
- 13 Jul 2026 → 2 Nov 2026 · 4 months
- Reference
ocds-h6vhtk-06ca6f
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.