Expiring UK Public Contracts: Retender Radar

Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,701–1,710

  1. Ends · in 224 days

    Notting Dale Heat Network - Contract for Design and Build - Primary Network

    The Royal Borough of Kensington & Chelsea · Local authority · Nationwide (UK), Greater London

    Incumbent: Vital Energi Utilities Limited · Last contest: 3 bids (1 SME)

    The Authority is conducting a procurement for a design, build, operation and maintenance contract relating to the Notting Dale heat network (the “Procurement”). *This Contract Award relates to the Primary Network Construction Works and the …

    • Works for complete or part construction and civil engineering work
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Ends 9 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-031719
  2. Estimated end · in 226 daysFramework recordPanel · 7 suppliers

    G&R/HRA/ External Maintenance Framework

    Bristol City Council · Local authority · Nationwide (UK)

    Panel: Ashcroft Services Ltd, BELL GROUP LTD, D R Jones Yeovil Ltd +4 more

    • Construction work

    Re-procurement plannedExternal Maintenance, Communal Works, Major Refurbishment and Repairs Framework · tender expected

    Published value
    £40mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 11 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-04060b
  3. Ends · in 226 days

    WO1862 Bartlett House - groundworks

    Wiltshire Council · Local authority · South West England

    Incumbent: Rigg Construction

    Groundworks for Affordable Homes, Bartlett House, Ludgershall, Wiltshire

    Published value
    £1.5m
    Annual run-rate
    £1.2mpublished value ÷ term, exc. VAT
    Term
    16 Mar 2026 → 11 Jun 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-0583f6
  4. Ends · in 226 days

    Contract title Contract for replacement of existing roofing to 20 no. flats (5 no. two storey blocks) at Beili Glas, Loughor Replacement roofing

    City & County of Swansea · Local authority · Wales (Cymru)

    Incumbent: Glamorgan Services Limited

    Replace existing tiled roofs and install new tiled roofs to porches to 5 no. blocks of flats at Beili Glas, Loughor

    Published value
    £105k
    Annual run-rate
    £123kpublished value ÷ term, exc. VAT
    Term
    3 Aug 2026 → 11 Jun 2027 · 10 months
    Reference
    ocds-h6vhtk-06a797
  5. Ends · in 226 days

    Contract for replacement of existing windows and doors to 20 no. flats (5 no. two storey blocks) at Beili Glas, Loughor

    City & County of Swansea · Local authority · Wales (Cymru)

    Incumbent: Anglian Windows Limited

    Contract for replacement of existing windows and doors to 20 no. flats (5 no. two storey blocks) at Beili Glas, Loughor

    Published value
    £100k
    Annual run-rate
    £116kpublished value ÷ term, exc. VAT
    Term
    3 Aug 2026 → 11 Jun 2027 · 10 months
    Reference
    ocds-h6vhtk-06b0d2
  6. Ends · in 226 days

    Grange Park - SARC - Refurb Works

    Police, Fire and Crime Commissioner for Staffordshire · Police & fire · Nationwide (UK)

    Incumbent: Mountain Healthcare Limited

    Feasibility for works to Grange Park to adhere to Forensic Regulations - note PFI building

    Published value
    £89k
    Annual run-rate
    £89kpublished value ÷ term, exc. VAT
    Term
    12 Jun 2026 → 11 Jun 2027 · 1 yr
    Reference
    ocds-h6vhtk-06dea4
  7. Estimated end · in 227 days

    CTO139 - CONTRACT FOR RESPONSE MAINTENANCE AND IMPROVEMENT – NORTH REGION WEST AND CAUSEWAY AREA

    Northern Ireland Housing Executive · Northern Ireland

    Incumbent: COMBINED FACILITIES MANAGEMENT LTD · Last contest: 1 bid (1 SME) · awarded 17% over the estimate

    In accordance with the Procurement Policy Note 01/21 – Scoring Social Value, this Contract will deliver measurable social value outcomes. Under this Procurement the Economic Operators will be required to support the Contracting Authority's …

    • Construction work
    Published value
    £86m
    Annual run-rate
    —start date not published
    Term
    Estimated end 12 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-044686
  8. Estimated end · in 227 days

    2024/25 043 Alness, Dalmore Phase 7

    Albyn Housing Society Limited · Scotland

    Incumbent: Capstone Construction Scotland Ltd · Last contest: 7 bids (7 SME) · awarded 11% over the estimate

    Construction of a new 36 unit Housing Development with associated roads, footpaths, drainage and external services.

    • Construction work for multi-dwelling buildings and individual houses
    Published value
    £8.0m
    Annual run-rate
    —start date not published
    Term
    Estimated end 12 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-04ed46
  9. Estimated end · in 228 daysFramework recordPanel · 20 suppliers

    Minor Works & River Asset Maintenance Framework

    Natural Resources Wales · Wales (Cymru)

    Panel: A J BUTLER CONTRACTING LIMITED, DT & DJ Peacock, E W JONES (PLANT HIRE) LTD +17 more

    • Flood-defences maintenance works
    Published value
    £13mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 13 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-03a64e
  10. Ends · in 228 days

    Kitchens East

    Accent Group Ltd · Yorkshire and the Humber, East of England, South East England

    Incumbent: Foster Property Maintenance · Last contest: 15 bids (10 SME)

    Accent Housing Ltd is seeking contractor / contractors to deliver Replacement Kitchen planned works in the East, South and Yorkshire Regions of its portfolio.The opportunity will be procured as three seperate Lots with no limit being placed…

    • Installation of fitted kitchens
    Published value
    £1.5mlist or panel total repeated on every provider; not this contract's value
    Annual run-rate
    —list or panel total, not a run-rate
    Term
    Ends 13 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-0448e8

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,848 contracts and agreements end within 24 months, 4,753 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months928
  2. 3–6 months583
  3. 6–12 months597
  4. 12–24 months740

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.