Expiring UK Public Contracts: Retender Radar

Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,731–1,740

  1. Ends · in 236 days

    Herne Bya Bandstand - Structural Repair Works

    Canterbury City Council · Local authority · South East England

    Incumbent: VPRO INFRASTRUCTURE SOLUTIONS LTD · Last contest: awarded 4% under the estimate

    Canterbury City Council wishes to select and appoint a suitable supplier for the provision of Herne Bay Bandstand – Structural Repair Works and invites tenderers to submit a tender to meet the Council’s requirements. It is a condition of th…

    Published value
    £671k
    Annual run-rate
    £671kpublished value ÷ term, exc. VAT
    Term
    22 Jun 2026 → 21 Jun 2027 · 1 yr
    Reference
    ocds-h6vhtk-0670e9
  2. Ends · in 236 daysExtension option · up to 30 Sept 2027

    Thicket Crescent & Thicket Road Energy Efficient Retrofit Works - Fire Safety Works

    London Borough of Sutton · Local authority · Greater London

    Incumbent: A P C BUILDING SERVICES (LONDON) LIMITED

    This energy efficient retrofit project will deliver significant improvements to LBS housing stock, specifically, 45 Thicket Crescent, and 22 Thicket Road, Sutton, SM1. The purpose of this procurement was to select and appoint a Contractor t…

    Published value
    £188k
    Annual run-rate
    £188kpublished value ÷ term, exc. VAT
    Term
    22 Jun 2026 → 21 Jun 2027 · 1 yr · up to 30 Sept 2027 with extensions
    Reference
    ocds-h6vhtk-05ab78
  3. Ends · in 236 daysExtension option · up to 30 Sept 2027

    Thicket Crescent & Thicket Road Energy Efficient Retrofit Works - External Fabric Repairs

    London Borough of Sutton · Local authority · Greater London

    Incumbent: A P C BUILDING SERVICES (LONDON) LIMITED

    This energy efficient retrofit project will deliver significant improvements to LBS housing stock, specifically, 45 Thicket Crescent, and 22 Thicket Road, Sutton, SM1. The purpose of this procurement was to facilitate the selection, and app…

    Published value
    £104k
    Annual run-rate
    £104kpublished value ÷ term, exc. VAT
    Term
    22 Jun 2026 → 21 Jun 2027 · 1 yr · up to 30 Sept 2027 with extensions
    Reference
    ocds-h6vhtk-05ab79
  4. Ends · in 236 days

    UOECS0570262026

    University of Exeter · Central government

    Incumbent: MERCURY CONSTRUCTION (SOUTH WEST) LIMITED

    Undertake the priced schedule of works in accordance with the quotation entitled RofE Roborough Enabling Works, dated 8th May 2026 and works plan entitled Summer 2026 Thornlea Site Mitigation dated 20th April 2026, (excluding new acoustic d…

    Published value
    £27k
    Annual run-rate
    £27kpublished value ÷ term, exc. VAT
    Term
    22 Jun 2026 → 21 Jun 2027 · 1 yr
    Reference
    ocds-h6vhtk-06edac
  5. Ends · in 237 days

    Specialist Ironwork Repairs/replacements

    Newcastle City Council · Local authority · North East England

    Incumbent: Rhino Asphalt Solutions

    Specialist works are required at a number of gullies (31 number) and manhole (3 number) sites throughout the city

    Published value
    £36k
    Annual run-rate
    £36kpublished value ÷ term, exc. VAT
    Term
    23 Jun 2026 → 22 Jun 2027 · 1 yr
    Reference
    ocds-h6vhtk-06baa7
  6. Estimated end · in 238 daysFramework recordPanel · 5 suppliers

    EPAIS22 - Asset Improvement and Sustainability Framework

    EASTERN PROCUREMENT LIMITED · Nationwide (UK), Yorkshire and the Humber, East Midlands, East of England, South East England

    Panel: Aspect Group Services Ltd, BELL GROUP LTD, Foster Property Maintenance +2 more

    • Construction work
    Published value
    £156mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 23 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-0383ee
  7. Ends · in 238 days

    Drill/Training Tower Construction at West Denton Fire Station

    Tyne and Wear Fire and Rescue Authority · Police & fire · Nationwide (UK)

    Incumbent: Crofton Engineering Limited

    Provision and Construction of a Drill/Training Tower at West Denton Fire Station

    Published value
    £178k
    Annual run-rate
    £178kpublished value ÷ term, exc. VAT
    Term
    24 Jun 2026 → 23 Jun 2027 · 1 yr
    Reference
    ocds-h6vhtk-060739
  8. Ends · in 239 days

    PLACE 122 Markham Vale Site Maintenance

    Derbyshire County Council · Local authority · East Midlands

    Incumbent: T & I Landscapes · Last contest: 19 bids (19 SME)

    Markham Vale Site Maintenance

    • Construction work
    Published value
    £118k
    Annual run-rate
    —start date not published
    Term
    Ends 24 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-033fa4
  9. Estimated end · in 240 days

    SCC - Design and Build of Affordable Dwellings at Lundy Close, Eastwood, Southend-on-Sea

    Southend-on-Sea City Council · Local authority · East of England

    Incumbent: Auburn Group Limited · Last contest: 7 bids (7 SME) · awarded 19% under the estimate

    Southend on Sea City Council are seeking a suitably qualified main contractor to carry out the Design and Build of affordable dwellings in line with proposed 2025 Future Homes Standard. This work will be undertaken in conjunction with the J…

    • Construction work for multi-dwelling buildings and individual houses
    Published value
    £2.1m
    Annual run-rate
    —start date not published
    Term
    Estimated end 25 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-04e678
  10. Ends · in 240 days

    CN260791 Ifield School Modular Expansion

    Kent County Council · Local authority · South East England

    Incumbent: WW MARTIN LTD

    Procure the design and build of a double storey modular SEN classroom block (8no. classrooms), together with staff rooms and associated ancillary accommodation, and associated infrastructure, including additional car parking, reprovision of…

    Published value
    £4.4m
    Annual run-rate
    £6.1mpublished value ÷ term, exc. VAT
    Term
    5 Oct 2026 → 25 Jun 2027 · 9 months
    Reference
    ocds-h6vhtk-078e88

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,848 contracts and agreements end within 24 months, 4,753 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months928
  2. 3–6 months583
  3. 6–12 months597
  4. 12–24 months740

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.