Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,781–1,790

  1. Estimated end · in 251 daysFramework recordPanel · 2 suppliers

    DH21021 - Extensions Framework

    Derby Homes Ltd · East Midlands

    Panel: NRA Construct Ltd, SPK BUILDING SERVICES LIMITED

    • Building construction work
    Published value
    £3.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 6 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-03c5b9
  2. Ends · in 251 days

    Estates Work

    University of Plymouth · Education · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: SANCTUARY MANAGEMENT SERVICES

    Installation of new DHW Heater.

    Published value
    £31kinc. VAT as published
    Annual run-rate
    £16kpublished value ÷ term, inc. VAT
    Term
    7 Jul 2025 → 6 Jul 2027 · 2 yrs
    Reference
    ocds-h6vhtk-058727
  3. Ends · in 252 days

    A27 Falmer Footbridge Headroom for BAPA - Network Rail

    National Highways Limited · Central government

    Incumbent: Network Rail Infrastructure

    614752 A27 Falmer Footbridge Headroom for BAPA to carrying out cores for the full length of the slip road on carriageway of which section of it is on top of Network Rail tunnel below the carriageway surface followed by resurfacing and reins…

    Published value
    £12k
    Annual run-rate
    £12kpublished value ÷ term, exc. VAT
    Term
    8 Jul 2026 → 7 Jul 2027 · 1 yr
    Reference
    ocds-h6vhtk-06c52c
  4. Estimated end · in 253 daysDynamic purchasing system record

    CAL21012 Broadford Primary School - New School

    The Highland Council · Local authority · Scotland

    Incumbent: Morgan Sindall Construction and Infrastructure Ltd

    • Construction work
    Published value
    £19mlargest agreement; total ceiling not published
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 8 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-04b1d5
  5. Ends · in 253 days

    Park Avenue Mental Health Hub - Access Control

    London Borough of Enfield · Local authority · Greater London

    Incumbent: ATEC fire and security

    Enfield Council are undertaking a project to renovate the Park Avenue & create a Mental Health Hub. As part of the project, electronic access control will need to be installed to secure the external main entrance doors, and some of the inte…

    Published value
    £488kinc. VAT as published
    Annual run-rate
    £244kpublished value ÷ term, inc. VAT
    Term
    8 Jul 2025 → 8 Jul 2027 · 2 yrs
    Reference
    ocds-h6vhtk-06e51b
  6. Ends · in 253 days

    Community House - Access System

    London Borough of Enfield · Local authority · Greater London

    Incumbent: ATEC fire and security

    Access control fit out to ensure a secure building for the service needs at community house

    Published value
    £49kinc. VAT as published
    Annual run-rate
    £24kpublished value ÷ term, inc. VAT
    Term
    8 Jul 2025 → 8 Jul 2027 · 2 yrs
    Reference
    ocds-h6vhtk-06e51d
  7. Ends · in 254 days

    UNDERTAKE CAR PARK RESURFACING WORK AS PER ATTACHED QUOTE OUTSIDE UTC

    Derbyshire Community Health Services NHS Foundation Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Johnson Surfacing Limited

    ILKESTON HOSPITAL - UNDERTAKE CAR PARK RESURFACING WORK AS PER ATTACHED QUOTE OUTSIDE UTC

    Published value
    £20k
    Annual run-rate
    £20kpublished value ÷ term, exc. VAT
    Term
    10 Jul 2026 → 9 Jul 2027 · 1 yr
    Reference
    ocds-h6vhtk-06e6cb
  8. Estimated end · in 255 daysFramework recordPanel · 3 suppliers

    EPDC22 - External and Internal Decorating

    EASTERN PROCUREMENT LIMITED · Nationwide (UK), Yorkshire and the Humber, East Midlands, East of England, South East England

    Panel: Alfred Bagnall & Sons (East Midlands) Ltd, BELL GROUP LTD, Mitie Property Services (UK) Ltd

    • Painting work
    Published value
    £21mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 10 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-037c70
  9. Estimated end · in 255 days

    Design, Operate and Maintain a Solar Farm with Private Wire Connection at Coed Ely

    Rhondda Cynon Taf CBC · Local authority · Wales (Cymru)

    Incumbent: Vital Energi Utilities Limited · Last contest: 2 bids (1 SME)

    Design, Operate and Maintain a Solar Farm and Private Wire Scheme at Coed Ely.

    • Installation of cable infrastructure
    Published value
    £8.6m
    Annual run-rate
    —start date not published
    Term
    Estimated end 10 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-043d21
  10. Estimated end · in 255 days

    BSH/HRA/ SEND Capital Throgmorton

    Bristol City Council · Local authority · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: E.W. Beard Limited · Last contest: 87 bids (74 SME)

    The project is part of the Bristol City Council SEND Wave 2 Capital programme to create additional SEND pupil places. The capital programme received Cabinet Authority in September 2022. The proposals at Throgmorton will provide circa 46 add…

    • Construction work
    Published value
    £785k
    Annual run-rate
    —start date not published
    Term
    Estimated end 10 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-038454

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,836 contracts and agreements end within 24 months, 4,734 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months927
  2. 3–6 months580
  3. 6–12 months597
  4. 12–24 months732

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.