Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1,841–1,850
- Estimated end · in 275 daysLinked to a framework or DPS
Lot 1 - Lower 0 - 10m GBP
Scape Procure Scotland Ltd · Scotland
Incumbent: Morgan Sindall Construction and Infrastructure Ltd
- Published value
- £500mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 30 Jul 2027 · start not published
- Reference
ocds-h6vhtk-0444fe
- Estimated end · in 275 daysLinked to a framework or DPS
Lot 2 - Lower 0 - 10m GBP
Scape Procure Scotland Ltd · Scotland
Incumbent: Kier Construction Ltd
- Published value
- £500mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 30 Jul 2027 · start not published
- Reference
ocds-h6vhtk-0444ff
- Estimated end · in 275 daysLinked to a framework or DPS
Lot 3 - Upper 7.5m GBP plus
Scape Procure Scotland Ltd · Scotland
Incumbent: Morgan Sindall Construction and Infrastructure Ltd
- Published value
- £500mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 30 Jul 2027 · start not published
- Reference
ocds-h6vhtk-044500
- Estimated end · in 275 daysLinked to a framework or DPS
Lot 4 - Upper 7.5m GBP plus
Scape Procure Scotland Ltd · Scotland
Incumbent: McLaughlin & Harvey Construction Limited
- Published value
- £500mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 30 Jul 2027 · start not published
- Reference
ocds-h6vhtk-044501
- Ends · in 275 days
Hope School Relocation Main Works
Wigan Council · Local authority · North West England
Incumbent: Conlon Construction Limited · Last contest: awarded at the estimate
Wigan Council are seeking to procure the main construction works for the relocation of Hope School and College to the Central Park Site, Montrose Avenue, Wigan. The school is a SEND school for severe learning difficulties and profound and c…
- Published value
- £18m
- Annual run-rate
- £20mpublished value ÷ term, exc. VAT
- Term
- 7 Sept 2026 → 30 Jul 2027 · 11 months
- Reference
ocds-h6vhtk-056700
- Ends · in 275 days
Milford Haven Public Transport Interchange
Pembrokeshire County Council · Local authority · Wales (Cymru)
Incumbent: Balfour Beatty Rail Ltd (a1 a4 a5 a6 a7 a9 a10 a11 a12 b1 b2 b3 b4 b5 b6 b7 c1 c2 c3 c4 c5 c6 c7 d1 d2 d3 d4) · Last contest: awarded 42% under the estimate
The scheme involves improvement works to the existing Milford Haven train station to create a new public transport interchange. This involves the relocation of the existing rail platform to allow for the provision of a new bus interchange, …
- Published value
- £7.8m
- Annual run-rate
- £6.6mpublished value ÷ term, exc. VAT
- Term
- 27 May 2026 → 30 Jul 2027 · 1.2 yrs
- Reference
ocds-h6vhtk-052147
- Ends · in 275 days
Gassiot House 1st Floor Refurbishment
Guy's and St Thomas' NHS Foundation Trust · Central government · Nationwide (UK), Greater London
Incumbent: T&B Contractors Limited
Gassiot House 1st Floor Refurbishment works (D&B).
- Published value
- £3.0m
- Annual run-rate
- £2.8mpublished value ÷ term, exc. VAT
- Term
- 10 Jul 2026 → 30 Jul 2027 · 1.1 yrs
- Reference
ocds-h6vhtk-06e8e4
- Ends · in 275 days
Stepaside
COASTLINE DESIGN AND BUILD LIMITED · Other public body · South West England
Incumbent: Restormel Building Contractors Ltd
Construction of 9 Affordable homes and associated infrastructure.
- Published value
- £1.9minc. VAT as published
- Annual run-rate
- £1.5mpublished value ÷ term, inc. VAT
- Term
- 23 Apr 2026 → 30 Jul 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-05f02b
- Ends · in 275 days
NKDC 25B Southgate
North Kesteven District Council · Local authority · East Midlands
Incumbent: BuildManager Construction
Building and landscaping renovations to 25B Southgate, Sleaford
- Published value
- £385k
- Annual run-rate
- £386kpublished value ÷ term, exc. VAT
- Term
- 1 Aug 2026 → 30 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06bf7c
- Estimated end · in 276 daysFramework recordPanel · 5 suppliers
Scape Regional Construction Framework
Scape Procure Limited (trading as SCAPE) · Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: G F Tomlinson Building Limited, Jeakins Weir Limited, LINDUM GROUP LIMITED +2 more
- Published value
- £750mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 31 Jul 2027 · start not published
- Reference
ocds-h6vhtk-02b929
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,836 contracts and agreements end within 24 months, 4,734 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,60979Business services: law, marketing, consulting2,66545Construction work2,10472IT services: consulting, software, internet1,62560Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.