Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,861–1,870

  1. Ends · in 276 days

    Lift Replacement Works

    Delta Housing Limited · Other public body · Nationwide (UK)

    Incumbent: Apex Lift & Escalator Engineers Limited

    Replacement of three existing hydraulic passenger lifts with electric traction MRL lifts

    Published value
    £421k
    Annual run-rate
    £391kpublished value ÷ term, exc. VAT
    Term
    3 Jul 2026 → 31 Jul 2027 · 1.1 yrs
    Reference
    ocds-h6vhtk-06c308
  2. Ends · in 276 daysPanel · 2 suppliers

    Proposed Car Park and Culvert Construction, George Street, Teignmouth

    Teignbridge District Council · Local authority · South West England

    Panel: PRIME BUILD SOUTH WEST LTD, Weaver Demolition Ltd

    • Replacement of existing stone culvert with new piped culvert. • Construction of new car park. • Construction of new junction / footway. • Construction and installation of landscaping and fencing. • Remedial works to existing stone boundar…

    Published value
    £369k
    Annual run-rate
    —panel, not one supplier
    Term
    23 Feb 2026 → 31 Jul 2027 · 1.4 yrs
    Reference
    ocds-h6vhtk-05a9b8
  3. Ends · in 276 daysCall-off

    survey, design, supply, install, remove, recondition re-siting and/ or store of External Platform Lifts and associated works in the Community

    Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Sirius Demolition · Last contest: 2 bids

    This Framework is for the survey, design, supply, install, remove, recondition re-siting and/ or store of External Platform Lifts and associated works in the Community. The scope of lifts currently delivered encompasses External Platform Li…

    • Construction work
    Published value
    £350kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 31 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-04d47b
  4. Ends · in 276 daysCall-off

    survey, design, supply, install, remove, recondition re-siting and/ or store of External Platform Lifts and associated works in the Community

    Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: GLC PROJECTS LTD · Last contest: 2 bids

    This Framework is for the survey, design, supply, install, remove, recondition re-siting and/ or store of External Platform Lifts and associated works in the Community. The scope of lifts currently delivered encompasses External Platform Li…

    • Construction work
    Published value
    £350kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 31 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-04d47b
  5. Ends · in 276 days

    Asphalt Preservation

    Via East Midlands LTD · Other public body · East Midlands

    Incumbent: Velocity UK Ltd

    Preparational patching and asphalt preservation works. Asphalt preservation works (2026), all in accordance with the 'Via East Midlands Lot 6 Asphalt Preservation 2025/26 Project Brief' and 'Dynamic Purchasing Information Pack' (2023). Spec…

    Published value
    £340k
    Annual run-rate
    £340kpublished value ÷ term, exc. VAT
    Term
    1 Aug 2026 → 31 Jul 2027 · 1 yr
    Reference
    ocds-h6vhtk-06d05b
  6. Ends · in 276 days

    CALM PEACEPLUS River Restoration Works on Scotstown River – Phase 1

    Armagh City Banbridge and Craigavon Borough Council · Local authority

    Incumbent: CivCo Limited · Last contest: awarded 19% over the estimate

    Armagh City, Banbridge, and Craigavon Borough Council is a partner on the CALM Project with Lead Partner- East Border Region (EBR), Agri-Food and Biosciences Institute, Inland Fisheries Ireland, the Loughs Agency and Ulster University. The …

    Published value
    £298k
    Annual run-rate
    £298kpublished value ÷ term, exc. VAT
    Term
    1 Aug 2026 → 31 Jul 2027 · 1 yr
    Reference
    ocds-h6vhtk-06b6bb
  7. Ends · in 276 days

    Secure Room Alterations

    Financial Conduct Authority · Other public body · Greater London

    Incumbent: OPEC Construction Ltd

    Minor construction project to internal walls and doors.

    Published value
    £250k
    Annual run-rate
    £250kpublished value ÷ term, exc. VAT
    Term
    1 Aug 2026 → 31 Jul 2027 · 1 yr
    Reference
    ocds-h6vhtk-06e3ec
  8. Ends · in 276 days

    Burley Recreation Ground – Pump Track

    City of Bradford Metropolitan District Council · Local authority · Yorkshire and the Humber

    Incumbent: Architrail Velosolutions UK Ltd

    The City of Bradford Metropolitan District Council (The Council) required a suitably qualified and experienced Contractor to provide new pump track at Burley / Iron Row Recreation Ground, York Road, Burley In Wharfedale, LS29 7DH. This will…

    Published value
    £183k
    Annual run-rate
    £123kpublished value ÷ term, exc. VAT
    Term
    2 Feb 2026 → 31 Jul 2027 · 1.5 yrs
    Reference
    ocds-h6vhtk-060a6f
  9. Ends · in 276 daysExtension option · up to 31 Jul 2028

    Diseworth Property Flood Resilience

    Leicestershire County Council · Local authority · East Midlands

    Incumbent: Whitehouse Construction Co. Limited · Last contest: awarded 18% under the estimate

    Property Flood Resilience (PFR) measures to be designed and installed to up to nineteen residential properties in Diseworth, Leicestershire.

    Published value
    £123k
    Annual run-rate
    £119kpublished value ÷ term, exc. VAT
    Term
    20 Jul 2026 → 31 Jul 2027 · 1 yr · up to 31 Jul 2028 with extensions
    Reference
    ocds-h6vhtk-069fe0
  10. Ends · in 276 days

    Barton Footbridge Strengthening

    The North Yorkshire Council · Central government

    Incumbent: PBS Construction (North East) Limited

    Barton Footbridge Strengthening Works

    Published value
    £118k
    Annual run-rate
    £128kpublished value ÷ term, exc. VAT
    Term
    31 Aug 2026 → 31 Jul 2027 · 11 months
    Reference
    ocds-h6vhtk-078287

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,836 contracts and agreements end within 24 months, 4,734 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months927
  2. 3–6 months580
  3. 6–12 months597
  4. 12–24 months732

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.