Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,911–1,920

  1. Ends · in 292 days

    Office Works

    North East London NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: James Roofing & Construction Ltd

    Capital Expenditure Goodmayes Relocate Estates 1. Strip Out & Enabling Works Provide all labour, plant, supervision, access equipment and waste disposal required to complete the initial strip out and preparation works. 2. Acoustic, Fire-Rat…

    Published value
    £156k
    Annual run-rate
    £156kpublished value ÷ term, exc. VAT
    Term
    17 Aug 2026 → 16 Aug 2027 · 1 yr
    Reference
    ocds-h6vhtk-06e929
  2. Ends · in 293 days

    Replacement air conditioning unit Cavendish Road.

    Stevenage Borough Council · Local authority · East of England

    Incumbent: Pitkin and Ruddock

    Cavendish Road. Replacement air conditioning units to serve the Server Room.

    Published value
    £29k
    Annual run-rate
    £29kpublished value ÷ term, exc. VAT
    Term
    17 Aug 2026 → 17 Aug 2027 · 1 yr
    Reference
    ocds-h6vhtk-0773c1
  3. Estimated end · in 295 days

    Hawkwood Road Redevelopment - Main Build

    Bournemouth, Christchurch and Poole Council · Local authority · South West England

    Incumbent: AJC Developments (South) Ltd · Last contest: 4 bids (4 SME)

    The construction of 68 residential flats and a medical centre over three buildings, creation of a new park, bike stores, refuse bin stores, associated parking, any highway works required and all associated hard and soft landscaping at the m…

    • Construction work
    Published value
    £18m
    Annual run-rate
    —start date not published
    Term
    Estimated end 19 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-04b0da
  4. Ends · in 295 days

    Harrington Hill Primary School - Appointment of a multi disciplinary consultant to design, manage and provide contract administration

    London Borough of Hackney · Local authority · Greater London

    Incumbent: Daniel Connal LLP

    Appointment of a multi disciplinary consultant to design, manage and provide contract administration for the project to provide a safe and suitable play area to support the Council’s school reorganisation strategy.

    Published value
    £33k
    Annual run-rate
    £22kpublished value ÷ term, exc. VAT
    Term
    9 Feb 2026 → 19 Aug 2027 · 1.5 yrs
    Reference
    ocds-h6vhtk-064a1b
  5. Ends · in 296 days

    Kitchen Refurb

    North East London NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: James Roofing & Construction Ltd

    Capital Expenditure Brookside Kitchen Refurbishment Strip Out Works Preparation and Temporary Facilities Wall Cladding Installation Works Fixtures, Fabrication, Mechanical Installations and Completion Works Mechanical Ventilation Works Addi…

    Published value
    £19k
    Annual run-rate
    £19kpublished value ÷ term, exc. VAT
    Term
    19 Aug 2026 → 20 Aug 2027 · 1 yr
    Reference
    ocds-h6vhtk-06e92a
  6. Estimated end · in 297 daysCall-off

    Abri- Design Supply and Installation of CAT2 MMC system at Sherecroft Farm Botley

    Abri Group Limited · Nationwide (UK), South East England

    Incumbent: SAINT-GOBAIN PAM UK · Last contest: 2 bids (0 SME)

    • Construction work
    Published value
    £2.0mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 21 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-0329e1
  7. Ends · in 299 days

    CAPRO120 Lift Autodialler GSM Upgrade and SIM Service Provision

    Somerset NHS Foundation Trust · Central government · South West England

    Incumbent: JACKSON LIFT SERVICES LIMITED

    Supply & Fit GSM Compatible Unit to Existing Auto Dialler (SIM Excluded) Supply & Fit GSM Aerial Extension for Improved Signal. Annual Rental & Call Charges For Auto Dialler SIM Card.

    Published value
    £13k
    Annual run-rate
    £13kpublished value ÷ term, exc. VAT
    Term
    24 Aug 2026 → 23 Aug 2027 · 1 yr
    Reference
    ocds-h6vhtk-07768f
  8. Ends · in 300 daysExtension option · up to 24 Aug 2028Panel · 2 suppliers

    External Cyclical Painting

    Aspire Housing · Other public body · West Midlands

    Panel: Hankinson Whittle Programs Limited, IAN WILLIAMS

    Aspire are looking to appoint 2 contractors to deliver the external cyclical painting programme for FY26/27 - Commencing June 2026. With the option to extend and allow for FY27/28 Programme to be issued as well. The budget is £350,000 per y…

    Published value
    £700kinc. VAT as published
    Annual run-rate
    —panel, not one supplier
    Term
    24 Aug 2026 → 24 Aug 2027 · 1 yr · up to 24 Aug 2028 with extensions
    Reference
    ocds-h6vhtk-06eafe
  9. Ends · in 301 days

    INVITATION TO TENDER (ITT) for the provision of Trinity Primary School - Roofing Replacement Works

    Herefordshire Council · Local authority · West Midlands

    Incumbent: Ice Roofing and Cladding Ltd · Last contest: awarded 37% under the estimate

    Herefordshire Council has appointed a contractor to carry out the roofing replacement works at Trinity Primary School. The project will involve replacing the current failed roofing system to three areas, replacing existing rooflights and ce…

    Published value
    £308k
    Annual run-rate
    £245kpublished value ÷ term, exc. VAT
    Term
    25 May 2026 → 25 Aug 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-064a78
  10. Ends · in 302 daysExtension option · up to 26 Aug 2028

    Lateral Mains Replacements and Remediations

    The Guinness Partnership · Other public body · Greater London, South East England

    Incumbent: Ashley and McDonough

    Replacement and remediation works for lateral mains installations across multiple sites in London and the South East.

    Published value
    £583k
    Annual run-rate
    £584kpublished value ÷ term, exc. VAT
    Term
    27 Aug 2026 → 26 Aug 2027 · 1 yr · up to 26 Aug 2028 with extensions
    Reference
    ocds-h6vhtk-06f24c

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,836 contracts and agreements end within 24 months, 4,734 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months927
  2. 3–6 months580
  3. 6–12 months597
  4. 12–24 months732

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.