Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 16–19
- Ends · in 344 daysCall-off
Groundcare Equipment
Lancaster City Council · Local authority · Nationwide (UK), North West England
Incumbent: F.R. Sharrock Ltd · Last contest: 19 bids
Supply of Groundcare equipment (mowers)
- Published value
- £53kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 5 Oct 2027 · start not published
- Reference
ocds-h6vhtk-03ecb0
- Ends · in 344 daysCall-off
Groundcare Equipment
Lancaster City Council · Local authority · Nationwide (UK), North West England
Incumbent: GGM Group Ltd · Last contest: 16 bids
Supply of Groundcare equipment (mowers)
- Published value
- £43kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 5 Oct 2027 · start not published
- Reference
ocds-h6vhtk-03ecb0
- Ends · in 344 daysCall-off
Groundcare Equipment
Lancaster City Council · Local authority · Nationwide (UK), North West England
Incumbent: F.R. Sharrocks Ltd · Last contest: 17 bids (2 SME)
Supply of Groundcare equipment (mowers)
- Published value
- £39kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 5 Oct 2027 · start not published
- Reference
ocds-h6vhtk-03ecb0
- Estimated end · in 363 daysFramework recordPanel · 5 suppliers
Garage Equipment Framework
Scottish Police Authority · Police & fire · Scotland
Panel: Arnold Clark Garage Equipment, Dingbro Ltd, ISN Europe +2 more
- Published value
- £960kpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 25 Oct 2027 · start not published
- Reference
ocds-h6vhtk-0556f2
When contracts end · Mining, quarrying and construction machinery i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
66 contracts and agreements end within 24 months, 95 in total · £8.2m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61179Business services: law, marketing, consulting2,63845Construction work2,09472IT services: consulting, software, internet1,61160Transport services (except waste transport)1,53371Architectural, construction, engineering1,40950Repair and maintenance services1,40480Education and training services1,252
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.