Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 16–19

  1. Ends · in 344 daysCall-off

    Groundcare Equipment

    Lancaster City Council · Local authority · Nationwide (UK), North West England

    Incumbent: F.R. Sharrock Ltd · Last contest: 19 bids

    Supply of Groundcare equipment (mowers)

    • Grounds-maintenance equipment
    Published value
    £53kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 5 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-03ecb0
  2. Ends · in 344 daysCall-off

    Groundcare Equipment

    Lancaster City Council · Local authority · Nationwide (UK), North West England

    Incumbent: GGM Group Ltd · Last contest: 16 bids

    Supply of Groundcare equipment (mowers)

    • Grounds-maintenance equipment
    Published value
    £43kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 5 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-03ecb0
  3. Ends · in 344 daysCall-off

    Groundcare Equipment

    Lancaster City Council · Local authority · Nationwide (UK), North West England

    Incumbent: F.R. Sharrocks Ltd · Last contest: 17 bids (2 SME)

    Supply of Groundcare equipment (mowers)

    • Grounds-maintenance equipment
    Published value
    £39kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 5 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-03ecb0
  4. Estimated end · in 363 daysFramework recordPanel · 5 suppliers

    Garage Equipment Framework

    Scottish Police Authority · Police & fire · Scotland

    Panel: Arnold Clark Garage Equipment, Dingbro Ltd, ISN Europe +2 more

    • Workshop equipment
    Published value
    £960kpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 25 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-0556f2

When contracts end · Mining, quarrying and construction machinery
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

66 contracts and agreements end within 24 months, 95 in total · £8.2m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months14
  2. 3–6 months10
  3. 6–12 months19
  4. 12–24 months23

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.