Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,991–2,000

  1. Estimated end · in 326 days

    Fire Doors Replacement Works 2024

    Bromford Flagship LiveWest Limited · Housing · East of England

    Incumbent: BELL GROUP LTD · Last contest: 23 bids · awarded 47% over the estimate

    Flagship Housing Group intend to roll out a 3-year program of fire door upgrades/replacement to our existing stock portfolio. The purpose of this tender is to appoint an approved contractor that can deliver quality and quantity to approved …

    • Installation of doors and windows and related components
    Published value
    £5.5m
    Annual run-rate
    —start date not published
    Term
    Estimated end 18 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-046e43
  2. Ends · in 326 days

    Guttering maintenance

    Somerset NHS Foundation Trust · Central government · South West England

    Incumbent: Access Specilaist contracts Ltd

    Guttering maintenance at Musgrove Park Hospital

    Published value
    £96k
    Annual run-rate
    £95kpublished value ÷ term, exc. VAT
    Term
    18 Sept 2026 → 18 Sept 2027 · 1 yr
    Reference
    ocds-h6vhtk-07758a
  3. Ends · in 326 days

    Chestnuts Day Centre Upgrades (2026)

    West Sussex County Council · Local authority

    Incumbent: Falcon Homes (Sussex) Ltd

    Chestnuts Day Centre - Upgrade Velux windows, soffits, facias and rainwater goods across the site.

    Published value
    £95k
    Annual run-rate
    £83kpublished value ÷ term, exc. VAT
    Term
    28 Jul 2026 → 18 Sept 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-06d535
  4. Estimated end · in 327 days

    PS-25-251 - Ayrshire Innovation Park, Phase 3 – Construction of Industrial Units (PRJ0013527)

    East Ayrshire Council · Local authority · Scotland

    Incumbent: Clark Contracts Ltd · Last contest: 4 bids (0 SME) · awarded 17% under the estimate

    The Ayrshire Engineering Park (AEP) project will contribute towards meeting current demand for new industrial space within East Ayrshire and Ayrshire, where there is a lack of high quality sites and premises that support the growth ambition…

    • Construction work for warehouses and industrial buildings
    Published value
    £12m
    Annual run-rate
    —start date not published
    Term
    Estimated end 19 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-05f31d
  5. Estimated end · in 328 daysCall-off

    Demolition of Quarryhouse Footbridge (Nevilles Cross)

    Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: MGL Demolition Limited · Last contest: 11 bids (2 SME)

    Demolition of Quarryhouse Footbridge (Nevilles Cross) Under Framework Agreement Framework for Demolition (including Asbestos Removal) 2024 DN 745591

    • Construction work
    Published value
    £51kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 20 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-04a47c
  6. Estimated end · in 329 daysFramework recordPanel · 8 suppliers

    General Builders Framework

    NHS Greater Glasgow and Clyde · NHS & health · Scotland

    Panel: BSL Interiors Limited, Clyde Contracts & Supplies, DBM Building Contractors Ltd +5 more

    • Construction work
    Published value
    £3.5mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-04e7d2
  7. Ends · in 329 days

    Replacement air conditioning unit Server Room

    Stevenage Borough Council · Local authority · East of England

    Incumbent: Pitkin and Ruddock

    Daneshill House. Replacement air conditioning units to serve the Server Room.

    Published value
    £31k
    Annual run-rate
    £31kpublished value ÷ term, exc. VAT
    Term
    21 Sept 2026 → 21 Sept 2027 · 1 yr
    Reference
    ocds-h6vhtk-0773bf
  8. Ends · in 329 days

    Internal Alterations at Diabetes Centre

    North East London NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: AD ARCHITECTS LIMITED

    Internal Alterations to Accommodate Community Mental Health Services at Diabetes Centre

    Published value
    £25k
    Annual run-rate
    £25kpublished value ÷ term, exc. VAT
    Term
    22 Sept 2026 → 21 Sept 2027 · 1 yr
    Reference
    ocds-h6vhtk-077a44
  9. Estimated end · in 330 daysFramework recordPanel · 3 suppliers

    Technical Surveys - Drainage Surveys

    Cyngor Gwynedd Council · Local authority · Wales (Cymru)

    Panel: Lanes Group Limited, Severn Partnership Ltd, ddc Engineering Solutions Ltd

    • Drainage works
    Published value
    £2.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 22 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-046928
  10. Ends · in 330 days

    High Lane Estate (Colne, dee, Humber court and the community center)

    London Borough of Ealing · Local authority · Greater London

    Incumbent: Goody Demolition Ltd

    The project comprises the full demolition to slab level of three residential buildings, Humber Court, Dee Court, and Colne Court and a Community Centre

    Published value
    £1.7m
    Annual run-rate
    £1.5mpublished value ÷ term, exc. VAT
    Term
    10 Aug 2026 → 22 Sept 2027 · 1.1 yrs
    Reference
    ocds-h6vhtk-077ac2

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.