Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 2,001–2,010

  1. Ends · in 330 days

    PKC13611 Modernisation of Passenger Lifts at Various Sites within Perth & Kinross

    Perth & Kinross Council · Local authority · Scotland

    Incumbent: Classic Lifts (Scotland) Ltd · Last contest: 5 bids (5 SME) · awarded 1% over the estimate

    Perth and Kinross Council were seeking to appoint a suitably qualified contractor to modernise existing lift installations across multiple multi-storey buildings and sheltered housing units.

    • Construction work
    Published value
    £860k
    Annual run-rate
    —start date not published
    Term
    Ends 22 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-06707e
  2. Ends · in 330 days

    Risley Avenue - FRA Works

    London Borough of Haringey · Local authority · Greater London

    Incumbent: MIDDLETONMURRAY INFRASTRUCTURE SERVICES LIMITED

    Fire stopping systems specification & Workmanship

    Published value
    £109k
    Annual run-rate
    £109kpublished value ÷ term, exc. VAT
    Term
    23 Sept 2026 → 22 Sept 2027 · 1 yr
    Reference
    ocds-h6vhtk-077c2c
  3. Ends · in 330 days

    The Vale Ingleton Wood

    GUINNESS DEVELOPMENTS LIMITED · Nationwide (UK)

    Incumbent: Ingleton Wood LLP

    The Vale Ingleton Wood - M&E works

    Published value
    £99k
    Annual run-rate
    £84kpublished value ÷ term, exc. VAT
    Term
    22 Jul 2026 → 22 Sept 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-077425
  4. Ends · in 332 days

    Prototype Fast Reactor Wall Recladding

    Nuclear Restoration Services Limited · Other public body

    Incumbent: AJ Engineering & Construction Services Ltd

    Prototype Fast Reactor Steam Generator Building North and East Wall Recladding, including De-Aerator Tower West

    Published value
    £2.7minc. VAT as published
    Annual run-rate
    £2.0mpublished value ÷ term, inc. VAT
    Term
    8 Jun 2026 → 24 Sept 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-06bf97
  5. Ends · in 332 days

    Modular Training Facility

    Police and Crime Commissioner for South Wales · Police & fire · Wales (Cymru)

    Incumbent: Energy Containment Concepts Ltd

    To manufacture, deliver and install a modular wall system for a Tactical Training Facility.

    Published value
    £179k
    Annual run-rate
    £90kpublished value ÷ term, exc. VAT
    Term
    26 Sept 2025 → 24 Sept 2027 · 2 yrs
    Reference
    ocds-h6vhtk-05aa5b
  6. Estimated end · in 333 days

    Roofing Replacement Programme 2022-2027

    Onward Group Limited · North West England

    Incumbent: Westhoughton Roofing and Building Services Group Limited · Last contest: 7 bids (7 SME)

    Onward Group Limited is one of the largest registered providers of social housing based solely in the North West of England with 35,000 homes across Merseyside, Lancashire, Greater Manchester and Cheshire.Onward are seeking to appoint suita…

    • Roof-slating work
    Published value
    £2.0m
    Annual run-rate
    —start date not published
    Term
    Estimated end 25 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-033181
  7. Estimated end · in 333 daysFramework record

    Fire Stopping Works and Services

    B3Living · East of England

    Incumbent: CLC Contractors Ltd

    • Fire-prevention installation works
    Published value
    £2.0mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 25 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-03deed
  8. Estimated end · in 333 days

    Roofing Replacement Programme 2022-2027

    Onward Group Limited · North West England

    Incumbent: DLP Services (Northern) Ltd · Last contest: 8 bids (0 SME)

    Onward Group Limited is one of the largest registered providers of social housing based solely in the North West of England with 35,000 homes across Merseyside, Lancashire, Greater Manchester and Cheshire.Onward are seeking to appoint suita…

    • Roof-slating work
    Published value
    £1.7m
    Annual run-rate
    —start date not published
    Term
    Estimated end 25 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-033181
  9. Estimated end · in 333 daysFramework recordPanel · 2 suppliers

    Leeds Building Services Hire of Plant Equipment

    Leeds City Council · Local authority · Nationwide (UK), Yorkshire and the Humber

    Panel: Hire Station Limited t/a Brandon Hire Station, Sunbelt Rentals Ltd

    • Hire of construction and civil engineering machinery and equipment with operator
    Published value
    £940kpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 25 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-035424
  10. Estimated end · in 333 days

    Roofing Replacement Programme 2022-2027

    Onward Group Limited · North West England

    Incumbent: DLP Services (Northern) Ltd · Last contest: 2 bids (2 SME)

    Onward Group Limited is one of the largest registered providers of social housing based solely in the North West of England with 35,000 homes across Merseyside, Lancashire, Greater Manchester and Cheshire.Onward are seeking to appoint suita…

    • Roof-slating work
    Published value
    £800k
    Annual run-rate
    —start date not published
    Term
    Estimated end 25 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-033181

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.