Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 12 months
Showing 5,076–5,100
- Ends · in 89 days
Pool Innovation Centre – New Roof
University of Plymouth · Education · South West England
Incumbent: TEC CONSTRUCTION (HOLDINGS) LTD
Re-roofing works to Pool Innovation Centre
- Published value
- £675k
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 29 Jan 2027 · 5 months
- Reference
ocds-h6vhtk-0792aa
- Ends · in 89 days
UKRI-6146 LISA 2nd Facility CMM
UK Research and Innovation · Central government
Incumbent: Hexagon Metrology Ltd
Supply, installation and commissioning of two high Coordinate Measuring Machines for the LISA Optical Bench dual integration facility currently being constructed at the UK Astronomy Technology Centre in Edinburgh.
- Published value
- £552k
- Annual run-rate
- £983kpublished value ÷ term, exc. VAT
- Term
- 9 Jul 2026 → 29 Jan 2027 · 7 months
- Reference
ocds-h6vhtk-06be5c
- Ends · in 89 days
Ffordd Penrhos – Active Travel Phase 4
Cyngor Gwynedd · Other public body · Nationwide (UK)
Incumbent: Alun Griffiths (Contractors) Limited (a6 a8 a9 b3 b4 b5 c3 c4 c5 d2 d3) · Last contest: awarded 25% under the estimate
The purpose of the scheme is to improve and widen the existing footpath to a shared used path at Ffordd Penrhos, Bangor continuing eastward from already constructed Phase 1 from Coed Mawr including construction of 1 controlled crossing.
- Published value
- £525k
- Annual run-rate
- —term under 6 months
- Term
- 17 Aug 2026 → 29 Jan 2027 · 5 months
- Reference
ocds-h6vhtk-06bdc7
- Ends · in 89 days
Aids and Adaptation Construction Works at four dwellings
Central Bedfordshire Council · Local authority · East of England
Incumbent: Modplan · Last contest: awarded 18% under the estimate
Aids and Adaptation Construction Works at four dwellings Please read and follow the information and guidance supplied below and within the Tender documents, this will help with your tender submission. Word count limits apply, any informatio…
- Published value
- £369k
- Annual run-rate
- £607kpublished value ÷ term, exc. VAT
- Term
- 22 Jun 2026 → 29 Jan 2027 · 7 months
- Reference
ocds-h6vhtk-064a11
- Ends · in 89 days
Area-5 - 2026-27 - Window & Door Programme 3
Winchester City Council · Local authority · South East England
Incumbent: Emplas Window Systems Limited
UPVc window and door replacements to WCC owned properties in: Fieldway, Denmead; St Mary's Close, Droxford; Hoe Road, Bishops Waltham & Penfords Paddock, Bishops Waltham.
- Published value
- £295kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 7 Sept 2026 → 29 Jan 2027 · 5 months
- Reference
ocds-h6vhtk-06f23e
- Ends · in 89 days
WCC Area 5 Window Replacement Programme 2
Winchester City Council · Local authority · South East England
Incumbent: THE FASCIA PLACE LIMITED
UPVc window & Door replacement programme for Area 5. Brookside Rd, Denmead, Chestnut Close, Denmead & Spring Lane, Colden Common.
- Published value
- £270kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 17 Aug 2026 → 29 Jan 2027 · 5 months
- Reference
ocds-h6vhtk-06ebaa
- Ends · in 89 days
J5 Resources to deliver EWMP User Case 1 - Additional effort
Sellafield Limited · Other public body · Nationwide (UK), North West England
Incumbent: Intergraph (UK) Limited
The contract award is required to support the delivery of Phase 1 of the project following the introduction of additional scope and functionality requirements. The expanded scope necessitates additional development time and specialist consu…
- Published value
- £191k
- Annual run-rate
- £370kpublished value ÷ term, exc. VAT
- Term
- 26 Jul 2026 → 29 Jan 2027 · 6 months
- Reference
ocds-h6vhtk-06b9e7
- Ends · in 89 days
Asbestos surveys and analytical work
Oxford City Council · Local authority · South East England
Incumbent: Asbestos Analysts Ltd
Asbestos surveys, re-inspections and air monitoring.
- Published value
- £180kinc. VAT as published
- Annual run-rate
- £182kpublished value ÷ term, inc. VAT
- Term
- 2 Feb 2026 → 29 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-064666
- Ends · in 89 daysExtension option · up to 29 Jan 2029
ID 6038208 - DFE - SWC - Supply and Delivery of Mechatronics Equipment
South West College · Central government
Incumbent: DIDACTIC SERVICES LIMITED · Last contest: awarded at the estimate
South West College is the Engineering Hub for the region and boasts engineering courses ranging from basic skills to Honours Degree Level programmes and is seeking a Supplier to provide mechatronics equipment, which must include: 3 x hydrau…
- Published value
- £169k
- Annual run-rate
- £148kpublished value ÷ term, exc. VAT
- Term
- 9 Dec 2025 → 29 Jan 2027 · 1.2 yrs · up to 29 Jan 2029 with extensions
- Reference
ocds-h6vhtk-05a51e
- Ends · in 89 daysExtension option · up to 29 Jan 2029
Perimeter Gates and Fencing at KWF
Home Office · Central government
Incumbent: Hill & Smith Infrastructure Ltd
Like for like replacement of fencing and gates at King's Warehouse Finningley moving from temporary to permanent solution
- Published value
- £166k
- Annual run-rate
- £166kpublished value ÷ term, exc. VAT
- Term
- 30 Jan 2026 → 29 Jan 2027 · 1 yr · up to 29 Jan 2029 with extensions
- Reference
ocds-h6vhtk-0612a4
- Ends · in 89 days
CCE Project Consultancy Services
Natural History Museum · Central government · Greater London
Incumbent: UDAVEY LTD
Interim Project Director October 26 - January 27 • Leading the project team, driving engagement with customers, and successful delivery of the project in budget and on time. • Work closely with key stakeholders to shape the long-term vision…
- Published value
- £158k
- Annual run-rate
- —term under 6 months
- Term
- 15 Oct 2026 → 29 Jan 2027 · 4 months
- Reference
ocds-h6vhtk-077ce9
- Ends · in 89 days
M53 Clatterbridge N&S - Deck Replacement - BT Openreach
National Highways Limited · Central government
Incumbent: British Telecommunications Plc
Service diversion allows the replacement of the central deck. Thereby increasing the lifespan of the structure (instead of full bridge replacement).
- Published value
- £156k
- Annual run-rate
- £153kpublished value ÷ term, exc. VAT
- Term
- 23 Jan 2026 → 29 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-0781d1
- Ends · in 89 daysExtension option · up to 29 Jan 2028
Change Support Consultancy
Clarion Housing Group · Housing
Incumbent: Incito Solutions Ltd
Clarion Housing Group requires specialist consultancy support to assess, design and enhance organisational project, programme and change management capability. The requirement includes reviewing current maturity, governance, processes, oper…
- Published value
- £154kinc. VAT as published
- Annual run-rate
- £292kpublished value ÷ term, inc. VAT
- Term
- 21 Jul 2026 → 29 Jan 2027 · 6 months · up to 29 Jan 2028 with extensions
- Reference
ocds-h6vhtk-0779b6
- Ends · in 89 daysExtension option
Data Architecture Solution
The North Yorkshire Council · Local authority
Incumbent: ZUHLKE ENGINEERING LTD
North Yorkshire Council are seeking a Supplier to work with to build a secure and flexible data architecture platform that provides vital data capabilities, e.g. ingestion, transformation, links to corporate presentation tools, governance, …
- Published value
- £150k
- Annual run-rate
- £150kpublished value ÷ term, exc. VAT
- Term
- 30 Jan 2026 → 29 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-06138e
- Ends · in 89 days
Data Architecture
The North Yorkshire Council · Local authority · Yorkshire and the Humber
Incumbent: ZUHLKE ENGINEERING LTD
Procurement of Data Architecture
- Published value
- £150k
- Annual run-rate
- £150kpublished value ÷ term, exc. VAT
- Term
- 30 Jan 2026 → 29 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-067efb
- Ends · in 89 days
GL1 (contract 2) Leisure Centre Contract Documents NEC 4 Professional Services Contract Agreement
Gloucester City Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: E.G. Carter & Company Limited
See attached contract for details. Progressing Design from RIBA Stage 3 to RIBA Stage 4 1.1. Appoint and lead the Design Team a) Employ Design Consultants: Engage key consultants such as architects, structural engineers, MEP engineers, and …
- Published value
- £144k
- Annual run-rate
- —term under 6 months
- Term
- 27 Aug 2026 → 29 Jan 2027 · 5 months
- Reference
ocds-h6vhtk-06faf7
- Ends · in 89 days
Data Platform Development
De Montfort University · Charity · Nationwide (UK)
Incumbent: SEAPARK CONSULTANCY UK LIMITED
The engagement covers the end-to-end design, build, and optimisation of a modern data platform, with a strong focus on SAP data integration and Microsoft Fabric/Azure best practices. The services are structured across architecture, data ing…
- Published value
- £128k
- Annual run-rate
- £170kpublished value ÷ term, exc. VAT
- Term
- 1 May 2026 → 29 Jan 2027 · 9 months
- Reference
ocds-h6vhtk-06ad9a
- Ends · in 89 days
Bristol to Bath Railway Path CCTV Installation
South Gloucestershire Council · Local authority · South West England
Incumbent: Select Electrics Ltd
South Gloucestershire Council have engaged a contractor to erect CCTV (including all cabling/associated works) along the Bristol to Bath Railway Path.
- Published value
- £124k
- Annual run-rate
- £218kpublished value ÷ term, exc. VAT
- Term
- 6 Jul 2026 → 29 Jan 2027 · 7 months
- Reference
ocds-h6vhtk-0783f2
- Ends · in 89 days
UKRI-6173 Photomultiplier Tubes for SANDALS II
UK Research and Innovation · Central government · South East England
Incumbent: ET Enterprises Ltd.
This requirement is for the procurement of Photomultiplier tubes for the SANDALS II detector array at the ISIS neutron and muon source in STFC RAL. The contract is awarded via direct award due to disproportionate technical compatibility req…
- Published value
- £121k
- Annual run-rate
- £232kpublished value ÷ term, exc. VAT
- Term
- 24 Jul 2026 → 29 Jan 2027 · 6 months
- Reference
ocds-h6vhtk-06c65f
- Ends · in 89 days
Local Investment in Natural Capital - Phase 3
York and North Yorkshire Combined Authority · Local authority · Yorkshire and the Humber
Incumbent: Great Yellow Ltd
The LINC programme must align with this wider policy landscape and help deliver statutory biodiversity targets (e.g. the Government's 30×30 pledge and biodiversity duty). Alignment will avoid duplication, maximise opportunities and ensure t…
- Published value
- £100k
- Annual run-rate
- —term under 6 months
- Term
- 18 Sept 2026 → 29 Jan 2027 · 4 months
- Reference
ocds-h6vhtk-078b08
- Ends · in 89 days
DDaT On Demand Learning
NHS England · Central government
Incumbent: EL Healthcare Education
To develop a high‑quality, NHS‑specific suite of introductory on‑demand learning modules in product and delivery and user‑centred design with the aim to build the skills and confidence of staff who are new to DDaT roles or looking to enter …
- Published value
- £92k
- Annual run-rate
- —term under 6 months
- Term
- 29 Sept 2026 → 29 Jan 2027 · 4 months
- Reference
ocds-h6vhtk-077cf1
- Ends · in 89 daysExtension option · up to 31 Mar 2027
Battery Storage DNO grid upgrade
Mining Remediation Authority · Central government · North East England
Incumbent: NORTHERN POWERGRID (NORTHEAST) PLC
This contract is for grid upgrade works at Bates MWTS to enable the connection to the grid of the battery energy storage system that is to be installed during FY 2026/27. These works fall under non-contestable works, which means that the wo…
- Published value
- £86k
- Annual run-rate
- —not computed
- Term
- 3 Aug 2026 → 29 Jan 2027 · 6 months · up to 31 Mar 2027 with extensions
- Reference
ocds-h6vhtk-07948d
- Ends · in 89 days
NOVA Data Governance Tool
HM Treasury · Central government · Nationwide (UK)
Incumbent: Informatica Software Limited
The NOVA Team have procured a cloud-based data governance, maturity and lineage tool to host the NOVA Data Dictionary product as part of the overall NOVA suit. The tool will reduce errors, enable improved collaboration between key NOVA stak…
- Published value
- £85k
- Annual run-rate
- £85kpublished value ÷ term, exc. VAT
- Term
- 30 Jan 2026 → 29 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-065da2
- Ends · in 89 days
Consultancy Services - Employers Agent - Homeleigh Hostel and Dengate Bungalow
London Borough of Bexley · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Bailey Partnership (consultants) LLP
6433 - Consultancy Services - Employers Agent - Homeleigh Hostel and Dengate Bungalow
- Published value
- £84k
- Annual run-rate
- £91kpublished value ÷ term, exc. VAT
- Term
- 1 Mar 2026 → 29 Jan 2027 · 11 months
- Reference
ocds-h6vhtk-064cc6
- Ends · in 89 days
Bromley North Regeneration - Clerk of Works
London Borough of Bromley · Local authority · Greater London
Incumbent: SILVER DCC LIMITED
The Clerk of Works (Technical Inspector) shall in providing the services and in acting as Clerk of Works exercise the reasonable skill, care, and diligence to be expected of an appropriately qualified professional experienced in acting as C…
- Published value
- £67k
- Annual run-rate
- £54kpublished value ÷ term, exc. VAT
- Term
- 4 Nov 2025 → 29 Jan 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-0781b0
When contracts end i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
38,235 contracts and agreements end within 24 months, 60,657 in total · £45bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown; 23,783 of 23,926 contracts ending in this window carry a sector classification.
85Health and social work services3,63379Business services: law, marketing, consulting2,64345Construction work1,98472IT services: consulting, software, internet1,62160Transport services (except waste transport)1,58371Architectural, construction, engineering1,40950Repair and maintenance services1,39980Education and training services1,273
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.