Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 2,061–2,070

  1. Ends · in 349 days

    Carrs Wood Footpath Resurfacing

    Stockport Metropolitan Borough Council · Local authority · North West England

    Incumbent: Horticon Ltd

    Carrs Wood Footpath Resurfacing Works

    Published value
    £33k
    Annual run-rate
    £33kpublished value ÷ term, exc. VAT
    Term
    12 Oct 2026 → 11 Oct 2027 · 1 yr
    Reference
    ocds-h6vhtk-078096
  2. Ends · in 349 days

    Supply and install Anti-Climb Guard

    North East London NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: Britplas Fabrications Limited

    Supply and install Anti-Climb Guard

    Published value
    £23k
    Annual run-rate
    £23kpublished value ÷ term, exc. VAT
    Term
    12 Oct 2026 → 11 Oct 2027 · 1 yr
    Reference
    ocds-h6vhtk-07898b
  3. Ends · in 352 days

    Accessible Nelson Works - Sections 1,2,3,4,6 & 7

    Lancashire County Council · Local authority · North West England

    Incumbent: J J O'GRADY LIMITED · Last contest: awarded 5% over the estimate

    The scope of this project is procurement of the labour to enable the laying of paving works programme for the Nelson Town Deal project (Accessible Nelson Sections 1, 2, 3, 4,6&7.) The works will comprise of the following; • Preparation of t…

    Published value
    £524k
    Annual run-rate
    £262kpublished value ÷ term, exc. VAT
    Term
    15 Oct 2025 → 14 Oct 2027 · 2 yrs
    Reference
    ocds-h6vhtk-055597
  4. Ends · in 352 days

    PRO-099 2026_27 Supply and Installation of Doors

    Leeds and York Partnership NHS Foundation Trust · Central government

    Incumbent: Kingsway Group

    To supply and install doors across Leeds and York Partnership NHS Foundation Trust sites

    Published value
    £20k
    Annual run-rate
    £20kpublished value ÷ term, exc. VAT
    Term
    15 Oct 2026 → 14 Oct 2027 · 1 yr
    Reference
    ocds-h6vhtk-0780e1
  5. Estimated end · in 353 days

    Airspace Extension Scheme Works

    Sutton Housing Society Ltd · Greater London

    Incumbent: Northvale Construction Ltd · Last contest: 3 bids · awarded 1% over the estimate

    Sutton Housing Society has secured full planning permission for the erection of a fourth storey extension to the front accommodation block (fronting Brighton Road) at the above and the erection of a third and fourth floor to the rear block,…

    • Building extension work
    Published value
    £7.8m
    Annual run-rate
    —start date not published
    Term
    Estimated end 15 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-04bcc5
  6. Ends · in 353 days

    City Place, Chester – Main Contractor

    Clarion Housing Group · Housing · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Galliford Try Construction Limited

    JCT Design & Build - 126 New Build Apartments at City Place, Chester

    Published value
    £27minc. VAT as published
    Annual run-rate
    £19mpublished value ÷ term, inc. VAT
    Term
    28 May 2026 → 15 Oct 2027 · 1.4 yrs
    Reference
    ocds-h6vhtk-051916
  7. Ends · in 353 days

    Masonry and Structural Repairs

    Cambridge University Hospitals NHS Foundation Trust · Central government · East of England

    Incumbent: P Woods Construction Ltd

    1751 -Masonry and Structural Repairs of Defective Brickwork and Concrete on the External Façade of BU11.

    Published value
    £49k
    Annual run-rate
    £49kpublished value ÷ term, exc. VAT
    Term
    16 Oct 2026 → 15 Oct 2027 · 1 yr
    Reference
    ocds-h6vhtk-078959
  8. Ends · in 354 daysPanel · 2 suppliers

    PRN25093 LMH Redevelopment

    Choice Housing Ireland Limited · Other public body

    Panel: Felix O'Hare & Co. Ltd, Felix O'Hare & Company Limited

    The contract is for the external and internal refurbishment of existing office and commercial buildings into a new combined office headquarters for Choice Housing Ireland. The site is located at 31-41 May Street, Belfast and is comprised of…

    Published value
    £5.5minc. VAT as published
    Annual run-rate
    —panel, not one supplier
    Term
    19 Oct 2026 → 16 Oct 2027 · 1 yr
    Reference
    ocds-h6vhtk-05f509
  9. Ends · in 354 days

    Children's Homes Refurbishment

    London Borough of Hackney · Local authority · Greater London

    Incumbent: Carmelcrest Ltd

    The contract for a building contractor to undertake the refurbishment and renovation of two London Borough of Hackney (LBH) properties, with the objective of establishing new children's homes within the borough.

    Published value
    £722k
    Annual run-rate
    £547kpublished value ÷ term, exc. VAT
    Term
    22 Jun 2026 → 16 Oct 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-069e03
  10. Estimated end · in 355 days

    Tender 32/2023 - Newry City Centre Regeneration Theatre/Conference Project

    Newry Mourne & Down District Council · Local authority · Northern Ireland

    Incumbent: Woodvale Construction Company · Last contest: 3 bids · awarded 15% over the estimate

    Newry, Mourne and Down District Council wish to refurbish the existing Newry Townhall and extend the current accommodation (c1700m2) by demolishing and redeveloping the redundant Sean Hollywood Arts Centre (SHAC) and No.2 Bank Parade.

    • Building construction work
    Published value
    £26m
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-03dedd

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.