Showing 1,101–1,150
- Ends · in 123 days
COV - 9 Frankwell Drive & Nutbrook Avenue Refurb Contractor
Coventry City Council · Local authority · West Midlands
Incumbent: R&R CONTRACTS-RENOVATION & REFURBISHMENT SPECIALISTS LIMITED
You are formally invited to submit a tender for the provision of refurbishment works at both of the above-mentioned Children's Home sites in Coventry. The works will be carried out under a JCT Intermediate Building Contract with Contractor'…
- Published value
- £433k
- Annual run-rate
- £349kpublished value ÷ term, exc. VAT
- Term
- 2 Dec 2025 → 28 Feb 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-05e70d
- Ends · in 123 days
Skimped Hill Health Centre (Legionella) pipework upgrades
NHS Property Services Limited · NHS & health
Incumbent: MJG Mechanical Services Limited
Skimped Hill Health Centre (Legionella) pipework upgrades
- Published value
- £318k
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 28 Feb 2027 · 4 months
- Reference
ocds-h6vhtk-07877b
- Ends · in 123 days
Flat Roof New decking at Knaves Court
Housing 21 · Central government · West Midlands
Incumbent: M & J GROUP (CONSTRUCTION & ROOFING) LTD
Flat Roof New decking at Knaves Court (Housing 21)
- Published value
- £285k
- Annual run-rate
- —term under 6 months
- Term
- 1 Dec 2026 → 28 Feb 2027 · 3 months
- Reference
ocds-h6vhtk-07891a
- Ends · in 123 days
Window and Doors Replacement Works
Northumberland County Council · Local authority · North East England
Incumbent: Anglian Windows Limited
A contract to complete works at properties which formed part of a wider cyclical replacement programme. The Council awarded a lotted contract for cyclical window and door replacement works in 2023 following a below-threshold open tender pro…
- Published value
- £203k
- Annual run-rate
- —not computed
- Term
- 11 Sept 2026 → 28 Feb 2027 · 6 months
- Reference
ocds-h6vhtk-0776f7
- Ends · in 123 daysExtension option · up to 31 Aug 2027
HVPS Electrical Installation
UK Atomic Energy Authority · Central government · South East England
Incumbent: THE OXFORD MECHANICAL & ELECTRICAL COMPANY LTD · Last contest: awarded at the estimate
The UK Atomic Energy Authority (UKAEA) has a requirement for the Electrical Installation of Plant and equipment within, and associated with, the Building D15 High Voltage Power Supplies. UKAEA are seeking a Contractor capable of supplying p…
- Published value
- £190k
- Annual run-rate
- —not computed
- Term
- 2 Sept 2026 → 28 Feb 2027 · 6 months · up to 31 Aug 2027 with extensions
- Reference
ocds-h6vhtk-06ce18
- Ends · in 123 days
KAS/CKI KAS/26-27/001/AWR-MOJ - DIVIDING WALL IN MEDICAL ROOM ITT
Gov Facility Services Ltd · Other public body
Incumbent: PMA (SERVICES) LTD
KAS/CKI KAS/26-27/001/AWR-MOJ - DIVIDING WALL IN MEDICAL ROOM ITT - KAS/CKI KAS/26-27/001/AWR-MOJ
- Published value
- £110k
- Annual run-rate
- —term under 6 months
- Term
- 1 Jan 2027 → 28 Feb 2027 · 2 months
- Reference
ocds-h6vhtk-06d0ad
- Ends · in 123 days
Refurbishment works for Roxeth Library (South Harrow)
London Borough of Harrow · Local authority · Greater London
Incumbent: FG LIBRARY PRODUCTS LIMITED
Procurement of a contractor to refurbish Roxeth Library in South Harrow. Works to be completed are as detailed in the specification of works and include shelving, furnishings, fixtures and equipment. The aim of the refurbishment is to trans…
- Published value
- £110k
- Annual run-rate
- —term under 6 months
- Term
- 7 Dec 2026 → 28 Feb 2027 · 3 months
- Reference
ocds-h6vhtk-077e2f
- Ends · in 123 days
Supply, delivery and installation of 3 pods for A floor Joseph's Well
Leeds Teaching Hospitals NHS Trust · Central government
Incumbent: MORRIS & SPOTTISWOOD LIMITED
Supply, delivery and installation of 3 pods for A floor Joseph's Well including desktop capsule modules. All as per your quotation Q20251217GGW - 1 dated 19/12/2025.
- Published value
- £40k
- Annual run-rate
- £40kpublished value ÷ term, exc. VAT
- Term
- 1 Mar 2026 → 28 Feb 2027 · 1 yr
- Reference
ocds-h6vhtk-0678bd
- Ends · in 123 days
Brooke House Modular Build
Surrey and Borders Partnership NHS Foundation Trust · Central government
Incumbent: Quality Timber Buildings Ltd
Garden room extension at Brooke House
- Published value
- £37k
- Annual run-rate
- —not computed
- Term
- 2 Sept 2026 → 28 Feb 2027 · 6 months
- Reference
ocds-h6vhtk-077f66
- Ends · in 123 days
CSP27901 - Replication Lab Refurbishment - Design
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: LSG ANGLIA LTD
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. Brief Description of Requirement:- Replication Lab Refurbishment - Design
- Published value
- £22k
- Annual run-rate
- —term under 6 months
- Term
- 1 Oct 2026 → 28 Feb 2027 · 5 months
- Reference
ocds-h6vhtk-077edf
- Ends · in 123 daysExtension option · up to 28 Feb 2029
UHDB/129/T - Water Testing Services
University Hospitals of Derby and Burton NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: EUROFINS WATER HYGIENE TESTING UK LIMITED
UHDB/129/T - Water Testing Services to University Hospitals of Derby and Burton NHS Foundation Trust
- Published value
- £100
- Annual run-rate
- £100published value ÷ term, exc. VAT
- Term
- 1 Mar 2026 → 28 Feb 2027 · 1 yr · up to 28 Feb 2029 with extensions
- Reference
ocds-h6vhtk-064c97
- Ends · in 124 days
PAN2766 - Southfield Newry Housing Scheme
Leicester City Council · Local authority · East Midlands
Incumbent: GEDA Construction · Last contest: 3 bids (0 SME)
Contract for the provision of design and construction of the new housing and associated works at the Southfield and Newry site. A summary of what the tenderer is being requested to deliver is as follows: - Completion of the design of the sc…
- Published value
- £11m
- Annual run-rate
- —start date not published
- Term
- Ends 1 Mar 2027 · start not published
- Reference
ocds-h6vhtk-046953
- Ends · in 124 days
St Agnes, Pressing
COASTLINE DESIGN AND BUILD LIMITED · Other public body · South West England
Incumbent: Classic Builders (South West) Ltd
Construction of 36 Affordable Homes and associated infrastructure in St Agnes Cornwall
- Published value
- £8.1minc. VAT as published
- Annual run-rate
- £6.0mpublished value ÷ term, inc. VAT
- Term
- 27 Oct 2025 → 1 Mar 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-05ac2a
- Ends · in 124 days
Refurbishment of Units 1-8 and external yard replacement at Admiral Hyson Industrial Estate
Glasgow City Council · Local authority · Greater London
Incumbent: 7Formation · Last contest: 3 bids (1 SME) · awarded 18% over the estimate
This procurement is to appoint a contractor for the refurbishment of eight light industrial units, comprising the Admiral Hyson Industrial Estate at Hyson Road, London SE16. The works include the replacement of the external yard and undergr…
- Published value
- £5.2m
- Annual run-rate
- —start date not published
- Term
- Ends 1 Mar 2027 · start not published
- Reference
ocds-h6vhtk-06070a
- Ends · in 124 days
Riversdale Primary School Modular Classroom Replacement
London Borough of Wandsworth · Local authority
Incumbent: APC Building Services (London) Ltd
Demolition of the existing modular buildings and construction of a new 3 classroom building with ancillary services and some landscaping at Riversdale Primary School.
- Published value
- £1.1m
- Annual run-rate
- —not computed
- Term
- 1 Sept 2026 → 1 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-06f9fb
- Ends · in 124 days
NKDC - Solar PV Installations
North Kesteven District Council · Local authority · East Midlands
Incumbent: HPC plc
North Kesteven District Council (NKDC) seeks to enter into a Contract with a suitably qualified Contractor to supply and fit rooftop solar photovoltaic (PVs) systems to the Waste & Street Scene Depot and the seven adjacent industrial units …
- Published value
- £402kinc. VAT as published
- Annual run-rate
- —not computed
- Term
- 3 Sept 2026 → 1 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-06f30f
- Ends · in 124 days
ESCC St Mary's Lift Replacement
East Sussex County Council · Local authority · South East England
Incumbent: Unite Lift Services Ltd
Lift Replacement at St Mary's House
- Published value
- £358k
- Annual run-rate
- —term under 6 months
- Term
- 1 Oct 2026 → 1 Mar 2027 · 5 months
- Reference
ocds-h6vhtk-07754e
- Ends · in 124 days
Fire Alarm System Upgrade
Cwm Taf Morgannwg University Health Board · Central government · Wales (Cymru)
Incumbent: Morris Line Engineering Ltd
Cwm Taf Morgannwg University Health Board (CTMUHB) has direct award a contract directly to Morris Churchfield Fire Ltd for the replacement and upgrade of essential fire alarm systems across multiple Health Board facilities. The works will i…
- Published value
- £299k
- Annual run-rate
- £237kpublished value ÷ term, exc. VAT
- Term
- 26 Nov 2025 → 1 Mar 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-05dbad
- Ends · in 124 days
Henderson Grove - Fire Damage Repair Agreement Based On & Incorporating The Conditionals of Contract of the JCT Intermediate Building Contract 2016
Stoke on Trent City Council · Local authority
Incumbent: Hardyman & Co Limited · Last contest: awarded 26% over the estimate
Stoke-on-Trent City Council's Repairs & Maintenance Services Department (RMS) will be assuming the role of Principal Contractor on this project and intend to appoint a single contractor to carry out the works. RMS will provide all necessary…
- Published value
- £220k
- Annual run-rate
- £381kpublished value ÷ term, exc. VAT
- Term
- 3 Aug 2026 → 1 Mar 2027 · 7 months
- Reference
ocds-h6vhtk-055941
- Ends · in 124 days
Scour Assessment-Protection Shaldon Bridge (00984)
Devon County Council · Local authority · South West England
Incumbent: TMS (a12 b1 b7)
Short-term emergency works where scour has been identified as potentially compromising the integrity of bridge foundations at Shaldon Bridge including beneath the lifting span pier,
- Published value
- £203k
- Annual run-rate
- —term under 6 months
- Term
- 29 Sept 2026 → 1 Mar 2027 · 5 months
- Reference
ocds-h6vhtk-06ee59
- Ends · in 124 days
Electrical Works at the Atriwm Carmarthen
Carmarthenshire County Council · Local authority · Wales (Cymru)
Incumbent: F P Hurley
Carmarthenshire County Council has appointed FP Hurley to carry out electrical works at the Atriwm, Carmarthen.
- Published value
- £120k
- Annual run-rate
- —not computed
- Term
- 14 Sept 2026 → 1 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-078511
- Ends · in 124 days
Plumbing Works NCC - Block 3
Construction Industry Training Board · Other public body · Nationwide (UK)
Incumbent: BRUCE TOWERS AND SONS LIMITED
Plumbing work for bedroom accommodation block 3 refurbishment. (This was a limited-invitation tender, as the requirement necessitated the provision of local support and resources)
- Published value
- £105k
- Annual run-rate
- —term under 6 months
- Term
- 9 Nov 2026 → 1 Mar 2027 · 4 months
- Reference
ocds-h6vhtk-078bf5
- Ends · in 124 days
Queen Elizabeth II Silver Jubilee School
West Sussex County Council · Local authority
Incumbent: Managing Property Maintenance Ltd
Queen Elizabeth II School - King Post Retaining Wall Repairs. Replacement of timber infill to kingpost retaining wall and associated land drainage.
- Published value
- £70k
- Annual run-rate
- £114kpublished value ÷ term, exc. VAT
- Term
- 21 Jul 2026 → 1 Mar 2027 · 7 months
- Reference
ocds-h6vhtk-06cfeb
- Ends · in 124 days
Cladding replacement and repairs at Waitrose car park, Elm Grove
Uttlesford District Council · Local authority · East of England
Incumbent: Kirkman and Jourdain Ltd
Uttlesford District Council seeked quotations for: The replacement of selected areas of external cladding, together with associated repairs and redecoration works at the Waitrose Car Park, Elm Grove, Saffron Walden. The works include remova…
- Published value
- £67k
- Annual run-rate
- —term under 6 months
- Term
- 11 Jan 2027 → 1 Mar 2027 · 2 months
- Reference
ocds-h6vhtk-0777ce
- Ends · in 124 daysExtension option
Adaptations for Disabled Access
London Borough of Bromley · Local authority · Greater London
Incumbent: M E HORSTEAD LTD
Major adaptations for disabled access to a residential property
- Published value
- £43k
- Annual run-rate
- £57kpublished value ÷ term, exc. VAT
- Term
- 1 Jun 2026 → 1 Mar 2027 · 9 months
- Reference
ocds-h6vhtk-06b26b
- Ends · in 124 daysExtension option · up to 1 Jan 2030
DNO electricity grid upgrade for Wallingford CSS
Oxfordshire County Council · Local authority · South East England
Incumbent: SOUTHERN ELECTRIC POWER DISTRIBUTION PLC
DNO electricity grid upgrade for Wallingford CSS. Southern Electric Power Distribution plc.
- Published value
- £31k
- Annual run-rate
- —term under 6 months
- Term
- 1 Jan 2027 → 1 Mar 2027 · 2 months · up to 1 Jan 2030 with extensions
- Reference
ocds-h6vhtk-06cd18
- Estimated end · in 125 daysFramework recordPanel · 4 suppliers
Supply of Kitchen and Bathroom Works
OXFORD DIRECT SERVICES LIMITED · South East England
Panel: BELL GROUP LTD, PiLON Ltd, Project Management Services Oxford Ltd +1 more
- Published value
- £5.4mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 2 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04ac17
- Estimated end · in 125 days
Water Hygiene, Legionella and Associated Services
Accent Group Ltd · North East England, North West England, Yorkshire and the Humber, East Midlands, East of England, South East England
Incumbent: Integrated Water Services Ltd · Last contest: 11 bids
To deliver against Accent's portfolio Water Hygiene, Legionella and Associated Services in a timely manner.
- Published value
- £271k
- Annual run-rate
- —start date not published
- Term
- Estimated end 2 Mar 2027 · start not published
- Reference
ocds-h6vhtk-02f0c3
- Ends · in 125 days
Voids, Disrepair and Repairs to PAP Out of Borough Properties
London Borough of Harrow · Local authority · Greater London
Incumbent: J.C. PROPERTY SERVICES LONDON LTD
This procurement is for works including disrepair works and repairs, as well as those for Void properties, to PAP Out of Borough properties
- Published value
- £413k
- Annual run-rate
- £207kpublished value ÷ term, exc. VAT
- Term
- 3 Mar 2025 → 2 Mar 2027 · 2 yrs
- Reference
ocds-h6vhtk-052a04
- Ends · in 125 daysExtension option · up to 2 Jul 2027
Health & Safety Concrete Spalling and Make Safe works
Citizen Housing Group Ltd · Charity · West Midlands
Incumbent: JPS Projects Limited
- Published value
- £265kinc. VAT as published
- Annual run-rate
- £265kpublished value ÷ term, inc. VAT
- Term
- 3 Mar 2026 → 2 Mar 2027 · 1 yr · up to 2 Jul 2027 with extensions
- Reference
ocds-h6vhtk-05fd2a
- Ends · in 125 days
Magenta Living Retaining Wall Works
MAGENTA LIVING · Other public body · North West England
Incumbent: DALE STRUCTURAL REPAIRS LIMITED
Works at a ML property; retaining wall works. Install of Temp. and Perm. Solutions to failing exterior retaining wall at the property.
- Published value
- £45k
- Annual run-rate
- £45kpublished value ÷ term, exc. VAT
- Term
- 2 Mar 2026 → 2 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-06155f
- Ends · in 125 days
PN399 Ground works Forrest Lodge
Sheffield Health Partnership University NHS Foundation Trust · Central government
Incumbent: J Lee and Son Sheffield
Emergency ground works to ensure no flooding with added cosmetic changes
- Published value
- £16k
- Annual run-rate
- £16kpublished value ÷ term, exc. VAT
- Term
- 5 Mar 2026 → 2 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-067c36
- Ends · in 126 days
Renovation of Bathrooms for the British Embassy Moscow
Foreign, Commonwealth and Development Office · Central government
Incumbent: Ernesto OOO
To comply with disability measures as per Disability Act 2010 and FCDO policy renovation of bathrooms are needed.
- Published value
- £37k
- Annual run-rate
- £37kpublished value ÷ term, exc. VAT
- Term
- 3 Mar 2026 → 3 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-066843
- Estimated end · in 127 daysFramework record
Provision of Core Surfacing 2024- 2027
Cumberland Council · Local authority · North West England
Incumbent: DSD Construction Ltd
The works are anticipated to include delivery of Core Highway Surfacing schemes within the geographical area of Cumberland Council. The schemes will generally involve the maintenance and repair of existing highways including, inlay, overlay…
Re-procurement plannedCore Surfacing 2027-2031 · tender expected
- Published value
- £50mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 4 Mar 2027 · start not published
- Reference
ocds-h6vhtk-042d09
- Estimated end · in 127 days
Waverley Borough Council Repairs, Aids and Adaptations, Void Refurbishment Contract
Waverley Borough Council · Local authority · South East England
Incumbent: IAN WILLIAMS · Last contest: 4 bids (0 SME) · awarded at the estimate
The works include Responsive Repairs, Aids and Adaptations and Void Refurbishment Works to approximately 5,000 properties owned and managed by WBC.Contract commencement in March 2022, and the contract will run for a period of five years wit…
- Published value
- £32m
- Annual run-rate
- —start date not published
- Term
- Estimated end 4 Mar 2027 · start not published
- Reference
ocds-h6vhtk-0289cf
- Estimated end · in 128 daysFramework recordPanel · 9 suppliers
Retrofit Improvements
Sedgemoor District Council · Local authority · South West England
Panel: ESW Construction Services Ltd, Evolve Home Energy Solutions, Healthy Indoor Environments Ltd +6 more
- Published value
- £12mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 5 Mar 2027 · start not published
- Reference
ocds-h6vhtk-036017
- Ends · in 128 days
Contractor for a new SEND unit at Waingels College
Wokingham Borough Council · Local authority
Incumbent: MORRIS & BLUNT LIMITED
A contractor is required to construct a new SEND unit at Waingels College, Woodley
- Published value
- £1.3minc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 24 Sept 2026 → 5 Mar 2027 · 5 months
- Reference
ocds-h6vhtk-078876
- Ends · in 128 days
Afonwen to Chwilog Active Travel - Phase 2
Cyngor Gwynedd · Other public body · Wales (Cymru)
Incumbent: G H James cyf · Last contest: awarded 26% under the estimate
Phase 2 of the Afonwen roundabout to Chwilog Active Travel multi use path.
- Published value
- £446k
- Annual run-rate
- —not computed
- Term
- 14 Sept 2026 → 5 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-06c46f
- Ends · in 129 days
Electricity Connection for West Swindon CDC project Phase 2
Great Western Hospitals NHS Foundation Trust · Central government
Incumbent: Scottish & Southern Electricity Networks (SSE)
Diversion of Low Voltage (LV) electricity supply at West Swindon Health Centre, West Swindon District Centre, Swindon SN5 7DL. Required as enabling works for construction for West Swindon CDC Phase 2 (CT/MRI/NOUS/Audiology) modular build.
- Published value
- £18k
- Annual run-rate
- £18kpublished value ÷ term, exc. VAT
- Term
- 6 Mar 2026 → 6 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-067a27
- Estimated end · in 131 days
Planned boiler replacement and central heating upgrades to council housing properties
Runnymede Borough Council · Local authority · South East England
Incumbent: CLAIRGLOW HEATING LTD · Last contest: 9 bids (8 SME) · awarded at the estimate
Runnymede Borough Council (‘’the Authority’’) requires work to be undertaken to replace existing aged gas fired central heating boilers and to upgrade existing central heating systems to tenanted domestic properties within its ownership, co…
- Published value
- £5.8m
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Mar 2027 · start not published
- Reference
ocds-h6vhtk-02e517
- Ends · in 131 days
Wylfa DCS4- Design, Manufacture and Installation of Contamination enclosure
Nuclear Restoration Services Limited · Other public body
Incumbent: RUBB BUILDINGS LTD
Design, Manufacture and Installation of Contamination enclosure at Wylfa Site, Anglesey.
- Published value
- £369kinc. VAT as published
- Annual run-rate
- £720kpublished value ÷ term, inc. VAT
- Term
- 3 Sept 2026 → 8 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-06f1f0
- Ends · in 131 days
PS022-25 Grimsby Town Hall Phase Two Works
NORTH EAST LINCOLNSHIRE COUNCIL · Local authority · Nationwide (UK), Yorkshire and the Humber
Incumbent: HOBSON AND PORTER LIMITED · Last contest: awarded 16% under the estimate
North East Lincolnshire Council are seeking to appoint a suitably qualified and experienced contractor to carry out conservation and refurbishment works to the Grade II listed Grimsby Town Hall. Works include masonry and timber repairs, roo…
- Published value
- £338k
- Annual run-rate
- —term under 6 months
- Term
- 2 Nov 2026 → 8 Mar 2027 · 4 months
- Reference
ocds-h6vhtk-069564
- Ends · in 131 daysExtension option · up to 8 Mar 2028
Lurgan Cemetery Ground Investigation
Armagh City Banbridge and Craigavon Borough Council · Local authority
Incumbent: Causeway Geotech Ltd · Last contest: awarded 22% under the estimate
Intrusive ground investigation works are required across two areas of Lurgan Cemetery, to assess the geotechnical, geo-environmental and groundwater conditions within the two sites in order to aid the design and feasibility of the Lurgan Ce…
- Published value
- £112kinc. VAT as published
- Annual run-rate
- £112kpublished value ÷ term, inc. VAT
- Term
- 9 Mar 2026 → 8 Mar 2027 · 1 yr · up to 8 Mar 2028 with extensions
- Reference
ocds-h6vhtk-05eb4f
- Ends · in 131 days
Design, Construction & Commissioning of Wath Skate Park
Rotherham Metropolitan Borough Council · Local authority · Yorkshire and the Humber
Incumbent: Canvas Spaces Limited
Rotherham Council requires a competent and experienced contractor to design, construct, test and commission an in-situ reinforced concrete skatepark at Wath Skatepark, Wath upon Dearne, Rotherham, S63 7DH.
- Published value
- £107kinc. VAT as published
- Annual run-rate
- —not computed
- Term
- 17 Sept 2026 → 8 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-077447
- Estimated end · in 132 days
Void Property Reinstatement Works
River Clyde Homes · Scotland
Incumbent: WrightKerr All Trades Limited · Last contest: 10 bids (5 SME)
River Clyde Homes are seeking to appoint a highly competent and experienced contractor to undertake the refurbishment of void properties, bring them back to a lettable standard.
- Published value
- £3.8m
- Annual run-rate
- —start date not published
- Term
- Estimated end 9 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04d436
- Estimated end · in 132 daysFramework recordPanel · 3 suppliers
TfGM Ducting and Minor Highway Improvement Works Framework
Transport for Greater Manchester · North West England
Panel: George Cox & Sons Limited, Prescott Special Projects Ltd, Rosgal Limited
- Published value
- £200mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 9 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03335e
- Estimated end · in 132 daysFramework recordPanel · 5 suppliers
HHP Investment Works Framework 2023 - 2029
Hebridean Housing Partnership Ltd · Housing · Scotland
Panel: A Campbell Electrical Services Ltd, Alex Murray (Construction) Ltd, Fes FM Limited +2 more
- Published value
- £14mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 9 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03623b
- Estimated end · in 132 daysFramework record
DH20046A4 - Roofing - Alvaston Phase 2
Derby Homes Ltd · East Midlands
Incumbent: J.A.L ROOFING LIMITED
Direct Call Off from the Derby Homes Roofing Framework for Roof covering replacement with integrated solar panels.
- Published value
- £1.5mlargest agreement; total ceiling not published
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 9 Mar 2027 · start not published
- Reference
ocds-h6vhtk-02fe33
- Ends · in 132 days
Museum of Two Halves Project, Wrexham - Enabling and Shell & Core Works Package
Wrexham County Borough Council · Local authority · Wales (Cymru)
Incumbent: SWG Construction (Build and Renovate) Ltd · Last contest: 4 bids (4 SME)
- Published value
- £5.2m
- Annual run-rate
- £1.9mpublished value ÷ term, exc. VAT
- Term
- 20 May 2024 → 9 Mar 2027 · 2.8 yrs
- Reference
ocds-h6vhtk-040c90
- Ends · in 134 days
Greenwich Park Landscape Maintenance and Welfare Refurbishment Works
The Royal Parks Ltd · Other public body · Greater London
Incumbent: Collins Contractors Ltd
TRP is seeking tenders for refurbishment works to the Greenwich Park Landscape Maintenance Welfare Building at Vanbrugh Yard. Works include upgrading welfare facilities, creating an accessible WC, refurbishing the office, replacing windows,…
- Published value
- £571inc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 28 Oct 2026 → 11 Mar 2027 · 4 months
- Reference
ocds-h6vhtk-0790c4
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,836 contracts and agreements end within 24 months, 4,734 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,60979Business services: law, marketing, consulting2,66545Construction work2,10472IT services: consulting, software, internet1,62560Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.