Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 231–240
- Ends · in 52 days
ENHT - Gardening Maintenance & Green Waste Removal
East and North Hertfordshire Teaching NHS Trust · Central government
Incumbent: Hertfordshire Trees Ltd
Gardening Maintenance & Green Waste Removal. Awarded via a sub-threshold quotation process in line with the Trusts Standing Financial Instructions.
- Published value
- £36k
- Annual run-rate
- £36kpublished value ÷ term, exc. VAT
- Term
- 20 Dec 2025 → 19 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-05f6b1
- Estimated end · in 53 days
Asbestos Surveys and Removals Combined Service
The District Council of Folkestone and Hythe · Local authority · South East England
Incumbent: PA Group (uk) Limited · Last contest: 3 bids (3 SME)
Asbestos surveying and sampling, and asbestos removal works, for social housing
- Published value
- £600k
- Annual run-rate
- —start date not published
- Term
- Estimated end 20 Dec 2026 · start not published
- Reference
ocds-h6vhtk-0410af
- Ends · in 53 days
Corporation Bridge - Structural Engineering Design Services
NORTH EAST LINCOLNSHIRE COUNCIL · Local authority · Nationwide (UK), Yorkshire and the Humber
Incumbent: Roughan & O'Donovan UK Ltd
Undertake Structural Engineering Design Services in relation to Corporation Bridge.
- Published value
- £96k
- Annual run-rate
- —not computed
- Term
- 26 Jun 2026 → 20 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-0598a2
- Ends · in 53 days
Heyford Planning Proposal
Cherwell District Council · Central government · Nationwide (UK)
Incumbent: OVE ARUP & PARTNERS LIMITED
Heyford Planning Proposal Request for Proposal
- Published value
- £68k
- Annual run-rate
- —term under 6 months
- Term
- 6 Sept 2026 → 20 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-078049
- Ends · in 53 days
Heyford Infrastructure Study
Cherwell District Council · Central government · Nationwide (UK)
Incumbent: OVE ARUP & PARTNERS LIMITED
Heyford Infrastructure Feasibility Study - Quotation Process
- Published value
- £15k
- Annual run-rate
- —term under 6 months
- Term
- 6 Sept 2026 → 20 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-078047
- Estimated end · in 57 daysFramework record
UKRI-3140 Marine Technical Advisor for UKRI-NERC
UK Research and Innovation · South West England
Incumbent: Houlder Limited
- Published value
- £5.0mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 24 Dec 2026 · start not published
- Reference
ocds-h6vhtk-03f9a6
- Estimated end · in 57 days
SYFR BEMS Replacement
South Yorkshire Fire and Rescue Service · Police & fire · Yorkshire and the Humber
Incumbent: Honeywell Control Solutions Ltd · Last contest: 3 bids
Replacement of estate wide BEMS
- Published value
- £334k
- Annual run-rate
- —start date not published
- Term
- Estimated end 24 Dec 2026 · start not published
- Reference
ocds-h6vhtk-02ecc1
- Ends · in 57 days
GMCA 1553.2 Skyline Property Surveyor
Greater Manchester Combined Authority · Local authority · Nationwide (UK)
Incumbent: HAYS SPECIALIST RECRUITMENT LIMITED
Scope of work is to provide 6-month temporary property (estates) professional surveying services to manage the end-to-end process (identification, appraisals, acquisition, planning, refurbishment, lease out, Local Authority engagement and l…
- Published value
- £57k
- Annual run-rate
- £112kpublished value ÷ term, exc. VAT
- Term
- 24 Jun 2026 → 24 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06da2e
- Ends · in 57 days
Shielded Transfer Pot Basket Removal Tool
Nuclear Restoration Services Limited · Other public body
Incumbent: Penny Engineering Limited
Shielded Transfer Pot Basket Removal Tool, The Contractor shall be responsible for the supply of documentation, materials, manufacture, inspection, testing, of the STP Basket Removal Assembly. Then, on completion of works testing, delivery …
- Published value
- £28k
- Annual run-rate
- —term under 6 months
- Term
- 4 Aug 2026 → 24 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-06e8b8
- Estimated end · in 58 daysCall-off
FW Services - Provision of In-Line Inspection Services - Multi Site 1031
Southern Gas Networks plc · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: PII Ltd · Last contest: 21 bids (6 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 25 Dec 2026 · start not published
- Reference
ocds-h6vhtk-02874b
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,296 contracts and agreements end within 24 months, 3,304 in total · £791m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,60979Business services: law, marketing, consulting2,66545Construction work2,10472IT services: consulting, software, internet1,62560Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.