Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1,201–1,250
- Estimated end · in 147 days
Supply & Installation of Floor Coverings
Midland Heart · West Midlands
Incumbent: Stebro Flooring Company Ltd · Last contest: 5 bids (2 SME) · awarded 14% under the estimate
Midland Heart are seeking bids from fully experienced providers who are trained and capable in the replacement of domestic and commercial flooring and associated works. The winning contractors’ operatives are required to be skilled and trai…
- Published value
- £3.0m
- Annual run-rate
- —start date not published
- Term
- Estimated end 24 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04b20d
- Estimated end · in 147 daysFramework recordPanel · 6 suppliers
Framework Agreement for Reactive Maintenance Works
City & County of Swansea · Local authority · Wales (Cymru)
Panel: ASW Property Services Limited, CARDO (WALES & WEST) LIMITED, M Delacey & Sons (Holdings) Ltd +3 more
- Published value
- £0largest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 24 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04b2ee
- Ends · in 147 daysExtension option · up to 2 Apr 2027
Surveying and Design
Medway NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: Harmony Fire Ltd
Surveying and Design Purchase order:270003404
- Published value
- £389k
- Annual run-rate
- £532kpublished value ÷ term, exc. VAT
- Term
- 1 Jul 2026 → 24 Mar 2027 · 9 months · up to 2 Apr 2027 with extensions
- Reference
ocds-h6vhtk-06cd77
- Estimated end · in 149 daysFramework recordPanel · 9 suppliers
Framework Agreement for Mechanical and Associated Works 2023-2025 (2027) for works up to a value of £500,000
Wigan Council · Local authority · North West England
Panel: CPL Heating & Plumbing Ltd, DFP Services Ltd, EE Thompson and Son Ltd (Thompson Building Services Engineers) +6 more
- Published value
- £10mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 26 Mar 2027 · start not published
- Reference
ocds-h6vhtk-038c20
- Estimated end · in 149 daysFramework recordPanel · 2 suppliers
Provision of Framework Agreement for the Disabled Facilities Grant Adaptations and Ramped Access Works
BLACKPOOL COUNCIL · Local authority · North West England
Panel: Bambers Remedial Contractors, The Excellent Ramp System Ltd
- Published value
- £6.0mlargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 26 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03991f
- Estimated end · in 149 daysDynamic purchasing system recordPanel · 17 suppliers
DPS for the Provision of Highways and Civil Engineering Works within Powys, Mid Wales
Powys County Council · Local authority · Wales (Cymru)
Panel: ALUN GRIFFITHS (CONTRACTORS) LIMITED, COYLE SURFACING LIMITED, EVABUILD LIMITED +14 more
Re-procurement openDynamic Purchasing System for the Provision of Highways and Civil Engineering Works within Powys, Mid Wales · bids close
- Published value
- £4.0mpublished ceiling for the whole dynamic purchasing system
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 26 Mar 2027 · start not published
- Reference
ocds-h6vhtk-048478
- Ends · in 149 days
Bideford Pannier Market Modernisation
Bideford Town Council · Local authority · South West England
Incumbent: Arque Limited
Bideford Pannier Market repairs and refurbishment works, mainly to the external fabric of the existing building. Please note this tender is being issued by Torridge District Council on behalf of Bideford Town Council.
- Published value
- £1.4m
- Annual run-rate
- £1.9mpublished value ÷ term, exc. VAT
- Term
- 6 Jul 2026 → 26 Mar 2027 · 9 months
- Reference
ocds-h6vhtk-06bb9b
- Ends · in 149 days
Eastmoor Health Centre Building Upgrade
NHS Property Services Limited · NHS & health
Incumbent: Dobson Construction Ltd
Contract for Eastmoor Health Centre Building Upgrade
- Published value
- £526k
- Annual run-rate
- £991kpublished value ÷ term, exc. VAT
- Term
- 14 Sept 2026 → 26 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-06d093
- Ends · in 149 days
Contract for Groundworks, Drainage & Surfacing Works at Maes Glas
City & County of Swansea · Local authority · Wales (Cymru)
Incumbent: NT GROUNDWORKS LIMITED
Contract for Groundworks, Drainage & Surfacing Works at Maes Glas
- Published value
- £107k
- Annual run-rate
- £137kpublished value ÷ term, exc. VAT
- Term
- 15 Jun 2026 → 26 Mar 2027 · 9 months
- Reference
ocds-h6vhtk-06b3f8
- Estimated end · in 150 days
M2324-04 - Responsive Repairs and Voids Contract
Southend City Council · Local authority · East of England
Incumbent: Axis Europe · Last contest: 2 bids (0 SME)
For delivery of a responsive repairs and voids contract with the option of planned works
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 27 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03d0c5
- Ends · in 150 days
Bromley Archive and Museum Store Retender
London Borough of Bromley · Local authority · Greater London
Incumbent: Longley Group Limited · Last contest: awarded 5% over the estimate
LB Bromley is has awarded a main contractor to undertake the demolitions, construction of an Archives and Museum store
- Published value
- £3.0m
- Annual run-rate
- £3.2mpublished value ÷ term, exc. VAT
- Term
- 16 Apr 2026 → 27 Mar 2027 · 11 months
- Reference
ocds-h6vhtk-059e34
- Ends · in 150 days
Leek Wootton Learning and Development Building Refurbishment Project
The Police and Crime Commissioner for Warwickshire · Police & fire · West Midlands
Incumbent: Murray & Willis Limited
Please note this is an AWARDED contract and is NOT a call for competition. The Police and Crime Commissioner for Warwickshire has awarded a contract for a complete Cat B refurbishment of the Learning and Development Centre (formerly the Tra…
- Published value
- £2.1m
- Annual run-rate
- £3.8mpublished value ÷ term, exc. VAT
- Term
- 9 Sept 2026 → 27 Mar 2027 · 7 months
- Reference
ocds-h6vhtk-06fae5
- Ends · in 150 days
Emberton Country Park – Foul and surface water drainage repairs
Milton Keynes Council · Local authority · South East England
Incumbent: Semilong Services Ltd
Emberton Country Park covers over 200 acres of attractive parkland in the village of Emberton, close to the historic town of Olney and just a few miles Northeast of Milton Keynes. The site was transformed by Milton Keynes City Council into …
- Published value
- £37kinc. VAT as published
- Annual run-rate
- £34kpublished value ÷ term, inc. VAT
- Term
- 23 Feb 2026 → 27 Mar 2027 · 1.1 yrs
- Reference
ocds-h6vhtk-05ed56
- Ends · in 151 daysExtension option · up to 29 Mar 2027
Energetik Primary Heating Network Extensions Part 1 (PSDS)
Lee Valley Heat Network Operating Company Limited, trading as Energetik · Other public body · Greater London
Incumbent: Proven Project (District Heating) Ltd
Extending the Energetik Primary Meridian Water Heat Network
- Published value
- £4.2m
- Annual run-rate
- £3.6mpublished value ÷ term, exc. VAT
- Term
- 4 Feb 2026 → 28 Mar 2027 · 1.2 yrs · up to 29 Mar 2027 with extensions
- Reference
ocds-h6vhtk-06b70d
- Ends · in 151 days
Temporary Accommodation Security Measures
Worcester City Council · Local authority · West Midlands
Incumbent: 24-7 Locks Ltd
Security measures to be fitted on temporary accommodation houses to enable WCC to have more secure accommodation to place households who have fled domestic abuse.
- Published value
- £48k
- Annual run-rate
- £93kpublished value ÷ term, exc. VAT
- Term
- 22 Sept 2026 → 28 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-077be9
- Ends · in 151 days
Dearden Way Bins
West Lancashire Borough Council · Local authority · North West England
Incumbent: GENERAL TRADE MAINTENANCE LTD
WLBC required a contractor to construct 3 external communal bins store areas
- Published value
- £25k
- Annual run-rate
- £25kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 28 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-067f54
- Estimated end · in 152 daysFramework recordPanel · 6 suppliers
Framework for Fire Safety Works Contractors
Kirklees Council · Local authority · Yorkshire and the Humber
Panel: ABCA systems limited, BELL GROUP LTD, Holistic Fire Safety Ltd +3 more
- Published value
- £27mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 29 Mar 2027 · start not published
- Reference
ocds-h6vhtk-049c37
- Estimated end · in 152 days
East Sussex
Hastoe HA · Housing · East of England, Greater London, South East England
Incumbent: AW Construction Ltd · Last contest: 2 bids (2 SME)
The works will include the delivery of Responsive Repairs and Void Refurbishments, to properties owned and managed by Hastoe Housing Association. The opportunity relates to geographic Lots and will relate to a four year initial contract ter…
- Published value
- £2.8m
- Annual run-rate
- —start date not published
- Term
- Estimated end 29 Mar 2027 · start not published
- Reference
ocds-h6vhtk-0375a8
- Ends · in 152 days
Provision of Contractor Appointment for the Emergency Department Improvements at Hillingdon Hospitals NHS Foundation Trust
The Hillingdon Hospitals NHS Foundation Trust · Central government
Incumbent: Cuffe PLC
The works comprise light refurbishment, reconfiguration and ‘light’ anti-ligature specification to various rooms and waiting areas within the Emergency Department at Hillingdon Hospital.
- Published value
- £1.8m
- Annual run-rate
- £2.1mpublished value ÷ term, exc. VAT
- Term
- 2 Jun 2026 → 29 Mar 2027 · 10 months
- Reference
ocds-h6vhtk-06aba1
- Ends · in 152 days
Contract for the provision of interim voids works
RYKNELD HOMES LIMITED · Other public body · East Midlands
Incumbent: GAP Property Services (Leicester) Ltd
This contract is for the provision of work to support the delivery of refurbishment works to empty properties to meet Rykneld Homes lettable standards
- Published value
- £1.2minc. VAT as published
- Annual run-rate
- £1.2mpublished value ÷ term, inc. VAT
- Term
- 30 Mar 2026 → 29 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-0673c3
- Ends · in 152 days
The Provision of Roofs at Corby & Mereway Fire Stations and steel works project
The Police, Fire and Crime Commissioner for Northamptonshire · Police & fire
Incumbent: Rosbo Limited
Remedial works to four roofs and improvement to external steel works for Corby and Mereway Wholetime Fire Stations (main building and ancillary bay for each property).
- Published value
- £285k
- Annual run-rate
- £286kpublished value ÷ term, exc. VAT
- Term
- 30 Mar 2026 → 29 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-067ac9
- Ends · in 152 days
QQ26052 - Oval Drive Improvement Works
Wolverhampton City Council · Local authority · West Midlands
Incumbent: J P LANDSCAPES & CONSTRUCTION LIMITED
The works comprise site clearance, stump removal, scrub clearance, the supply and installation of play equipment, construction of safety surfaces, tree and shrub planting
- Published value
- £43k
- Annual run-rate
- —not computed
- Term
- 29 Sept 2026 → 29 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-078609
- Ends · in 152 days
Power Supply for J2 Server Room Move
CENTRE FOR PROCESS INNOVATION LIMITED · Other public body · North East England
Incumbent: JBA Engineering ltd
To facilitate CPI server room to be moved locations, CPI requires first ranked supplier on it's Electrical Works Framework to provide and install a 63A single-phase dual-feed changeover switch, fed via T-block tap-in box and H-tap-in box co…
- Published value
- £36kinc. VAT as published
- Annual run-rate
- £36kpublished value ÷ term, inc. VAT
- Term
- 30 Mar 2026 → 29 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-069a43
- Estimated end · in 153 daysFramework recordPanel · 3 suppliers
TC041 - Proprietary Treatments to Carriageways and Footways Framework
Manchester City Council · Local authority · North West England
Panel: JPCS Limited, KIELY BROS LTD, Rosgal Limited
Re-procurement plannedProprietary Treatments to Carriageways and Footways
- Published value
- £24mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 30 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04bcdd
- Estimated end · in 153 days
WH22007 - Painting & Decorating Services
Wolverhampton City Council · Local authority · West Midlands
Incumbent: Tony Davies & Partner LLP · Last contest: 4 bids (3 SME)
To provide a comprehensive redecoration resource that can be utilised for the delivery of maintenance to external elements of properties, communal areas of multi occupancy dwellings and internal rooms of properties following major works, vo…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 30 Mar 2027 · start not published
- Reference
ocds-h6vhtk-039604
- Ends · in 153 days
Stage 1 - PCSA
Maidstone Borough Council · Local authority · South East England
Incumbent: Hill Partnerships Ltd · Last contest: awarded 10% under the estimate
Maidstone Borough Council (MBC) will appoint a contractor to provide high-quality design and construction works to deliver a residential dwellings development.
- Published value
- £2.2m
- Annual run-rate
- £2.2mpublished value ÷ term, exc. VAT
- Term
- 25 Mar 2026 → 30 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-056986
- Ends · in 153 days
16 Church Street (Shades) enabling works
Hartlepool Borough Council · Local authority · North East England
Incumbent: Historic Property Restoration Ltd
16 Church Street (Shades) enabling works, including temporary propping works, faience works and bressummer replacement.
- Published value
- £613k
- Annual run-rate
- —not computed
- Term
- 10 Oct 2026 → 30 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-06ec8d
- Ends · in 153 daysExtension option · up to 30 Mar 2029
DESIGN AND BUILD OF PARKLETS
London Borough of Wandsworth · Local authority · Greater London
Incumbent: Meristem Design Limited
Design, Build and delivery of Parklets in Wandsworth Borough Council
- Published value
- £375k
- Annual run-rate
- £287kpublished value ÷ term, exc. VAT
- Term
- 9 Dec 2025 → 30 Mar 2027 · 1.3 yrs · up to 30 Mar 2029 with extensions
- Reference
ocds-h6vhtk-0544d5
- Ends · in 153 days
Carriageway Resurfacing 2026/27
St Helens Council · Local authority · North West England
Incumbent: J. HOPKINS (CONTRACTORS) LIMITED
Carriageway Resurfacing Works 2026/27. It is anticipated there will be around around 30 schemes during the contract term.
- Published value
- £125k
- Annual run-rate
- £125kpublished value ÷ term, exc. VAT
- Term
- 31 Mar 2026 → 30 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-05fef5
- Ends · in 153 days
Sunbelt Rentals Ltd
Leicestershire County Council · Local authority · East Midlands
Incumbent: Sunbelt Rentals Ltd
Use of direct award option under ESPO 536 Framework agreement for hire of plant without operator. Call-off contracts placed between 01/01/2026 and 31/03/2026.
- Published value
- £45k
- Annual run-rate
- £45kpublished value ÷ term, exc. VAT
- Term
- 31 Mar 2026 → 30 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-0515d8
- Ends · in 153 days
Gap Group Ltd
Leicestershire County Council · Local authority · East Midlands
Incumbent: GAP Group Limited
Use of direct award option under ESPO 536 Framework agreement for hire of plant without operator. Call-off contracts placed between 01/01/2026 and 31/03/2026.
- Published value
- £41k
- Annual run-rate
- £41kpublished value ÷ term, exc. VAT
- Term
- 31 Mar 2026 → 30 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-0515d8
- Estimated end · in 154 daysFramework recordPanel · 36 suppliers
Modern Methods of Construction (MMC) New Homes Framework NH3
LHC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Panel: A.& E.ELKINS LIMITED, Advance Construction (Scotland) Ltd, BWF Construction Services Limited +33 more
- Published value
- £600mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03130f
- Estimated end · in 154 daysCall-offPanel · 6 suppliers
Lot 1 – 3D Modular Low Rise Housing and Apartments up to 11m - 0 - 9 Units
LHC Procurement Group Limited for the Welsh Procurement Alliance (WPA) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Panel: BWF Construction Services Limited, Beattie Passive Operations Ltd, J.G. HALE CONSTRUCTION LTD +3 more · Last contest: 11 bids (6 SME)
This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for th…
- Published value
- £100mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03130f
- Estimated end · in 154 daysCall-off
Lot 12 - Main Contractors Low Rise Housing and Apartments up to 11m – 10 - 19 Units
LHC Procurement Group Limited for the Welsh Procurement Alliance (WPA) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Beattie Passive Operations Ltd · Last contest: 14 bids (12 SME)
This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for th…
- Published value
- £100mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03130f
- Estimated end · in 154 daysCall-off
Lot 13 - Main Contractors Low Rise Housing and Apartments up to 11m – 20 - 49 Units
LHC Procurement Group Limited for the Welsh Procurement Alliance (WPA) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: J.G. HALE CONSTRUCTION LTD · Last contest: 13 bids (11 SME)
This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for th…
- Published value
- £100mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03130f
- Estimated end · in 154 daysCall-off
Lot 14 - Main Contractors Low Rise Housing and Apartments up to 11m - 50+ Units
LHC Procurement Group Limited for the Welsh Procurement Alliance (WPA) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Vistry Partnerships Ltd · Last contest: 11 bids (8 SME)
This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for th…
- Published value
- £100mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03130f
- Estimated end · in 154 daysCall-off
Lot 15 - Main Contractors High Rise Housing - 11m or Higher
LHC Procurement Group Limited for the Welsh Procurement Alliance (WPA) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Vistry Partnerships Ltd · Last contest: 6 bids (4 SME)
This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for th…
- Published value
- £100mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03130f
- Estimated end · in 154 daysCall-offPanel · 2 suppliers
Lot 16 - Main Contractors Care Homes and Specialised Housing
LHC Procurement Group Limited for the Welsh Procurement Alliance (WPA) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Panel: J.G. HALE CONSTRUCTION LTD, Vistry Partnerships Ltd · Last contest: 7 bids (5 SME)
This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for th…
- Published value
- £100mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03130f
- Estimated end · in 154 daysCall-off
Lot 18 - Groundworks and Associated Works
LHC Procurement Group Limited for the Welsh Procurement Alliance (WPA) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Knights Construction Ltd · Last contest: 8 bids (8 SME)
This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for th…
- Published value
- £100mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03130f
- Estimated end · in 154 daysCall-offPanel · 5 suppliers
Lot 20 - Main Contractors Low Rise Housing Super Lot
LHC Procurement Group Limited for the Welsh Procurement Alliance (WPA) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Panel: Beattie Passive Operations Ltd, J.G. HALE CONSTRUCTION LTD, Stelling Properties Limited +2 more · Last contest: 17 bids (13 SME)
This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for th…
- Published value
- £100mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03130f
- Estimated end · in 154 daysCall-offPanel · 7 suppliers
Lot 19 – Workstream 1 3D Modular Low Rise Housing Super Lot
LHC Procurement Group Limited for the Welsh Procurement Alliance (WPA) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Panel: BWF Construction Services Limited, Beattie Passive Operations Ltd, J.G. HALE CONSTRUCTION LTD +4 more · Last contest: 12 bids (10 SME)
This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for th…
- Published value
- £100mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03130f
- Estimated end · in 154 daysCall-off
Lot 17 - Main Contractors ‘Room on the Roof’
LHC Procurement Group Limited for the Welsh Procurement Alliance (WPA) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: ZED PODS LIMITED · Last contest: 2 bids (2 SME)
This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for th…
- Published value
- £100mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03130f
- Estimated end · in 154 daysCall-offPanel · 4 suppliers
Lot 2 – 3D Modular Low Rise Housing and Apartments up to 11m - 10 - 19 Units
LHC Procurement Group Limited for the Welsh Procurement Alliance (WPA) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Panel: Beattie Passive Operations Ltd, J.G. HALE CONSTRUCTION LTD, Reds10 (UK) Ltd +1 more · Last contest: 9 bids (8 SME)
This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for th…
- Published value
- £100mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03130f
- Estimated end · in 154 daysCall-offPanel · 3 suppliers
Lot 3 – 3D Modular Low Rise Housing and Apartments up to 11m - 20 - 49 Units
LHC Procurement Group Limited for the Welsh Procurement Alliance (WPA) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Panel: J.G. HALE CONSTRUCTION LTD, Reds10 (UK) Ltd, Tophat Communities Limited · Last contest: 11 bids (9 SME)
This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for th…
- Published value
- £100mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03130f
- Estimated end · in 154 daysCall-offPanel · 2 suppliers
Lot 4 – 3D Modular Low Rise Housing and Apartments up to 11m - 50+ Units
LHC Procurement Group Limited for the Welsh Procurement Alliance (WPA) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Panel: J.G. HALE CONSTRUCTION LTD, Reds10 (UK) Ltd · Last contest: 9 bids (7 SME)
This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for th…
- Published value
- £100mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03130f
- Estimated end · in 154 daysCall-offPanel · 3 suppliers
Lot 8 - 2D Panelised Systems – Supply Only
LHC Procurement Group Limited for the Welsh Procurement Alliance (WPA) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Panel: Celtic Horizons Limited t/a Celtic Offsite, J.G. HALE CONSTRUCTION LTD, LoCal Homes · Last contest: 4 bids (3 SME)
This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for th…
- Published value
- £100mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03130f
- Estimated end · in 154 daysCall-offPanel · 5 suppliers
Lot 10 - 2D Panelised Systems – Supply and Installation
LHC Procurement Group Limited for the Welsh Procurement Alliance (WPA) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Panel: Celtic Horizons Limited t/a Celtic Offsite, Donaldson Timber Systems, J.G. HALE CONSTRUCTION LTD +2 more · Last contest: 6 bids (3 SME)
This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for th…
- Published value
- £100mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03130f
- Ends · in 154 daysFramework recordPanel · 4 suppliers
Medium Schemes Framework 4 (MSF4) on behalf of Midlands Highways Alliance Plus (MHA+)
Leicestershire County Council · Local authority · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Panel: Balfour Beatty Civil Engineering Limited, Eurovia Infrastructure Limited, Galliford Try Construction Limited +1 more
- Published value
- £1.0bnpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-02a6ce
- Ends · in 154 daysFramework recordPanel · 6 suppliers
Buckinghamshire Highways Framework One - Highways Minor Works
Buckinghamshire Council · Local authority · South East England
Panel: Balfour Beatty Living Places Limited, Colas Limited, Eurovia Infrastructure Limited +3 more
- Published value
- £54mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-034278
- Ends · in 154 daysFramework recordPanel · 3 suppliers
Demolition and Related Services Framework
Sandwell Metropolitan Borough Council · Local authority · West Midlands
Panel: AR Demolition Ltd, COLEMAN & COMPANY LIMITED, DSM Demolition
Re-procurement plannedDemolition & Related Services · tender expected
- Published value
- £20mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-0388c5
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,836 contracts and agreements end within 24 months, 4,734 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,60979Business services: law, marketing, consulting2,66545Construction work2,10472IT services: consulting, software, internet1,62560Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.