Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 361–375

  1. Ends · in 23 days

    Flooring

    North East London NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: Ladon Flooring Limited

    Install 6mm WEP plywood sub floor and tile carpet At Block E1 & E2 - Supply and lay 3mm latex smoothing compound to sub-floor. Supply and install Polyflor Forest FX (colour tbc) 2mm sheet vinyl flat lay in Corridors, WCs

    Published value
    £19k
    Annual run-rate
    £19kpublished value ÷ term, exc. VAT
    Term
    20 Nov 2025 → 19 Nov 2026 · 1 yr
    Reference
    ocds-h6vhtk-05e6ed
  2. Ends · in 24 daysExtension option · up to 15 Dec 2026

    Whole Estate Improvement works at Stepney Green Court, Mocatta House and Navarino Mansions

    The Industrial Dwellings Society (1885) Ltd · Other public body · Greater London

    Incumbent: SER Contractor Ltd

    Whole estate improvement works, inclusive of roof, window and door replacements, external fabric repairs, redecoration and other miscellaneous works at three sites (Stepney Green Court in Tower Hamlets, Navarino Mansions in Hackney and Moca…

    Published value
    £5.1m
    Annual run-rate
    £4.6mpublished value ÷ term, exc. VAT
    Term
    10 Oct 2025 → 20 Nov 2026 · 1.1 yrs · up to 15 Dec 2026 with extensions
    Reference
    ocds-h6vhtk-051408
  3. Ends · in 24 days

    Vyne Community School Window Upgrade

    Hampshire County Council · Local authority · South East England

    Incumbent: Joedan Manufacturing (UK) Ltd

    Window and Door replacement project: Vyne Community School. Design: Some contractor design elements

    Published value
    £620k
    Annual run-rate
    —term under 6 months
    Term
    12 Oct 2026 → 20 Nov 2026 · 40 days
    Reference
    ocds-h6vhtk-06e64e
  4. Ends · in 24 days

    Conway Road Decarbonisation & Drainage at Conway Road Health Centre

    NHS Property Services Limited · NHS & health

    Incumbent: NU CONSTRUCTION LIMITED

    Contract for Conway Road Decarbonisation & Drainage at Conway Road Health Centre

    Published value
    £617k
    Annual run-rate
    —term under 6 months
    Term
    28 Sept 2026 → 20 Nov 2026 · 2 months
    Reference
    ocds-h6vhtk-077be2
  5. Ends · in 24 daysExtension option · up to 20 May 2027

    SKDC-1629 Upgrade to Leisure Facilities on Behalf of South Kesteven District Council

    South Kesteven District Council · Local authority · East Midlands

    Incumbent: Northdown Property Services (NPS) Ltd · Last contest: awarded 36% under the estimate

    Upgrade to Leisure Facilities on Behalf of South Kesteven District Council Selective refurbishment works of male and female changing area including, but not limited to: • Lighting and suspended ceiling replacement • Localised M&E reinstatem…

    Published value
    £321k
    Annual run-rate
    —not computed
    Term
    1 Jun 2026 → 20 Nov 2026 · 6 months · up to 20 May 2027 with extensions
    Reference
    ocds-h6vhtk-06557a
  6. Ends · in 24 days

    Roofing Works Moorside Lodge Swinton

    Your Housing Group · Housing · North West England

    Incumbent: Jackson Jackson and Sons Ltd.

    YHG requires works at Moorside Lodge, Swinton to repair the roofing, leaning piked gables and structural issues, as well as the brickwork. The building is 3 storeys and urgent works are required to complete the repairs. YHG carried out a qu…

    Published value
    £271kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    7 Sept 2026 → 20 Nov 2026 · 2 months
    Reference
    ocds-h6vhtk-077a72
  7. Ends · in 24 days

    1-63 Guildmaster Court High Wycombe

    Peabody Trust Ltd · Other public body

    Incumbent: KNAPMAN & SONS (BUILDERS) LIMITED

    Minor works cyclical enveloping decorations.

    Published value
    £218kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    29 Jun 2026 → 20 Nov 2026 · 5 months
    Reference
    ocds-h6vhtk-06ddfd
  8. Ends · in 24 days

    Leisure Improvement Works - South Kesteven

    South Kesteven District Council · Local authority · East Midlands

    Incumbent: Northdown Property Services (NPS) Ltd

    Further selective refurbishment works identified following commencement of original works. Additional works required whilst current supplier is still on site.

    Published value
    £196k
    Annual run-rate
    —not computed
    Term
    1 Jun 2026 → 20 Nov 2026 · 6 months
    Reference
    ocds-h6vhtk-06c127
  9. Ends · in 24 days

    V&A Fashion Gallery Refurbishment: Mosaic Floor Restoration

    Victoria and Albert Museum · Central government · Greater London

    Incumbent: THE MOSAIC RESTORATION COMPANY LIMITED

    We have run a procurement process to appoint a contractor for restoration works to the historic mosaic floor for our new fashion gallery (Gallery 40) at V&A South Kensington. This was a closed process whereby only invited suppliers could re…

    Published value
    £195k
    Annual run-rate
    —term under 6 months
    Term
    24 Jun 2026 → 20 Nov 2026 · 5 months
    Reference
    ocds-h6vhtk-06bcb1
  10. Ends · in 24 days

    Chevet Lane - Sandal resurfacing work

    Wakefield Council · Local authority · Yorkshire and the Humber

    Incumbent: Aggregate Industries UK Ltd

    Chevet Lane - Sandal resurfacing work (Carriageway)

    Published value
    £160kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    9 Nov 2026 → 20 Nov 2026 · 12 days
    Reference
    ocds-h6vhtk-078be0
  11. Ends · in 24 days

    BISF Pilot Scheme 10 Alanbrooke Crescent

    Swindon Borough Council · Local authority · South West England

    Incumbent: Joyner P.A. Limited

    BISF Pilot Scheme 10 Alanbrooke Crescent Swindon Borough Council have awarded the Contract for a BISF Pilot Scheme at 10 Alanbrooke Crescent. This requirement is for a BISF including an external wall insulation, new windows and doors and ro…

    Published value
    £135k
    Annual run-rate
    —term under 6 months
    Term
    1 Sept 2026 → 20 Nov 2026 · 3 months
    Reference
    ocds-h6vhtk-06f436
  12. Ends · in 24 daysExtension option · up to 4 Jan 2027

    Landlord Demolition Works - Unit 1, Market Square, Charter Walk Shopping Centre, Burnley, BB11 1PY

    Burnley Borough Council · Local authority · North West England

    Incumbent: SHERIDAN GROUP FM LIMITED · Last contest: awarded 18% under the estimate

    Tenders are invited from contractors having the resources, sufficient capacity and experience working with Local Authority clients to remove the existing detached café structure at Charter Walk Shopping Centre, Burnley. All works must be in…

    Published value
    £123k
    Annual run-rate
    —term under 6 months
    Term
    5 Oct 2026 → 20 Nov 2026 · 2 months · up to 4 Jan 2027 with extensions
    Reference
    ocds-h6vhtk-0679e1
  13. Ends · in 24 days

    Water Risk Assessment Remedials at Clifton Health Centre

    NHS Property Services Limited · NHS & health

    Incumbent: Whitaker and Leach Limited

    Water Risk Assessment Remedials at Clifton Health Centre

    Published value
    £114k
    Annual run-rate
    —term under 6 months
    Term
    19 Oct 2026 → 20 Nov 2026 · 33 days
    Reference
    ocds-h6vhtk-07820f
  14. Ends · in 24 days

    Parapet Wall to Charites Hub

    Milton Keynes Council · Local authority · South East England

    Incumbent: Gaskell Refurbishments Ltd · Last contest: awarded 22% over the estimate

    The Charities Hub is combination of the Arts Centre & Meeting Place, constructed circa 1971-72, and forms two thirds of the Galley Hill Local Centre. The Local Centre is a steel framed building consisting of shops, the Arts Centre at Ground…

    Published value
    £110k
    Annual run-rate
    —term under 6 months
    Term
    7 Sept 2026 → 20 Nov 2026 · 2 months
    Reference
    ocds-h6vhtk-06aa4d
  15. Ends · in 24 days

    Playground Improvement

    Mere Town Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Proludic

    Mere Town Council wish to engage suitably qualified and experienced playground designers and contractors to design, supply and install equipment that will make improvements to the Playground in Mere Rec.

    Published value
    £100k
    Annual run-rate
    —term under 6 months
    Term
    12 Oct 2026 → 20 Nov 2026 · 40 days
    Reference
    ocds-h6vhtk-077c3d

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.