Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 376–390

  1. Ends · in 24 days

    Marbury Park 2026

    Cheshire west and Chester Borough Council · Local authority · North West England

    Incumbent: Groundwork and Leisure Services Ltd

    Construction of a detached single storey storage building

    Published value
    £66kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    13 Jul 2026 → 20 Nov 2026 · 4 months
    Reference
    ocds-h6vhtk-06b26c
  2. Ends · in 24 days

    Goldthorpe Art Project

    Barnsley Metropolitan Borough Council · Local authority · Yorkshire and the Humber

    Incumbent: Campbell Design & Engineering Ltd

    Supply, fabrication and erection of Sculpture for Goldthorpe Art Project

    Published value
    £45kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    11 Sept 2026 → 20 Nov 2026 · 2 months
    Reference
    ocds-h6vhtk-06f82a
  3. Ends · in 24 days

    Q1550 - Pwllygath Street Garage

    Bridgend County Borough Council · Local authority · Wales (Cymru)

    Incumbent: MANNING CONSTRUCTION LIMITED

    This is a UK7 - Contracts Details Notice issued by Bridgend County Borough Council (BCBC) for Pwllygath Street Garage. Apart from this notice the Quote / Tender was conducted entirely on ETenderWales. The following is extracted directly fro…

    Published value
    £40k
    Annual run-rate
    —term under 6 months
    Term
    5 Oct 2026 → 20 Nov 2026 · 2 months
    Reference
    ocds-h6vhtk-06f537
  4. Ends · in 24 days

    SEN Base Garden Construction Works at Westover Green School

    Somerset Council · Local authority · South West England

    Incumbent: Adrian Morris & Partners

    To construct external area of the new SEN base at Westover Green School

    Published value
    £40k
    Annual run-rate
    —term under 6 months
    Term
    30 Oct 2026 → 20 Nov 2026 · 22 days
    Reference
    ocds-h6vhtk-07855a
  5. Ends · in 24 daysExtension option · up to 31 Jan 2027

    Call off from Peatlands Restoration Framework 2026-2034 - Lot 3

    Natural Resources Wales · Other public body · Wales (Cymru)

    Incumbent: G T Jones Contracting Ltd

    A contract details notice for a Call off from the Peatlands Restoration Framework 2026-2034 - Lot 3

    Published value
    £34k
    Annual run-rate
    —term under 6 months
    Term
    5 Oct 2026 → 20 Nov 2026 · 2 months · up to 31 Jan 2027 with extensions
    Reference
    ocds-h6vhtk-077c70
  6. Ends · in 24 days

    SIM Shop Upgrade Works

    Science Museum Group · Central government

    Incumbent: JOHNSTON SHOPFITTERS UK LIMITED · Last contest: awarded 19% over the estimate

    This project wishes to appoint a contractor to the following scope of works. The project is aimed to improve the following area within shop. • Strip out existing wall units. • Skim, prime, and repaint all walls. • Install new wall unit layo…

    Published value
    £31k
    Annual run-rate
    —term under 6 months
    Term
    2 Nov 2026 → 20 Nov 2026 · 19 days
    Reference
    ocds-h6vhtk-06ef89
  7. Ends · in 24 days

    Fire Remediation - 18 Rowe Court, Dobwells, Liskeard, Cornwall, PL14 6AU

    LiveWest Homes Limited · Other public body · South West England

    Incumbent: DWT (UK) LTD

    Fire Remediation works at 18 Rowe Court, Dobwells, Liskeard, Cornwall, PL14 6AU

    Published value
    £30k
    Annual run-rate
    —term under 6 months
    Term
    12 Oct 2026 → 20 Nov 2026 · 40 days
    Reference
    ocds-h6vhtk-07813c
  8. Ends · in 24 days

    Locks Heath Keystone - Solar PV Install

    Hampshire County Council · Local authority · South East England

    Incumbent: Ventro Ltd

    The works include working with a sub contractor to design and install a new solar voltaic and connecting in the the building.

    Published value
    £15k
    Annual run-rate
    —term under 6 months
    Term
    16 Nov 2026 → 20 Nov 2026 · 5 days
    Reference
    ocds-h6vhtk-0789de
  9. Estimated end · in 25 daysFramework recordPanel · 44 suppliers

    TKAT Asset Management Services Framework Agreement

    THE KEMNAL ACADEMIES TRUST · Education · South East England

    Panel: AHR BUILDING CONSULTANCY LIMITED, Acclaim Contracts Limited, Accurate Roofing Ltd +41 more

    • Construction work for buildings relating to education and research
    Published value
    £22mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-031913
  10. Estimated end · in 25 days

    DUD - Service, Inspection, Maintenance, Repairs and Installation works to Specialist, Electrical, Mechanical and Social Care Systems and Equipment 2021-2026

    Dudley Metropolitan Borough Council · Local authority · West Midlands

    Incumbent: AllHands Ltd T/A Harrold Jones Services · Last contest: 2 bids (2 SME)

    • Electrical installation work
    Published value
    £513k
    Annual run-rate
    —start date not published
    Term
    Estimated end 21 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-02ace6
  11. Estimated end · in 25 daysFramework recordPanel · 6 suppliers

    Cambridge City Council - Action on Energy Cambridgeshire Retrofit Framework

    Cambridge City Council · Local authority · East of England

    Panel: Aran Insulation Ltd, BELL GROUP LTD, Cornerstone (East Anglia) Limited +3 more

    • Construction work
    Published value
    Not publishedlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-035f7f
  12. Estimated end · in 26 days

    Proposed Contract for Domestic Property and Communal Electrical Testing, Remedials and Rewires and Domestic Property and Communal Electrical Responsive Repairs

    Redditch Borough Council · Local authority · Nationwide (UK)

    Incumbent: Citrus Group NW Ltd · Last contest: 14 bids

    Proposed Contract for Domestic Property and Communal Electrical Testing, Remedials and Rewires and Domestic Property and Communal Electrical Responsive Repairs

    • Electrical installation work
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 22 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-03df16
  13. Ends · in 26 days

    Demolition Works - Alexandra House & Hillsborough House (708-AHL)

    NSAH (Alliance Homes) Ltd · Other public body · South West England

    Incumbent: Weaver Demolition Ltd

    Procurement for demolition works at Alexandra House and Hillsborough House, Weston-super-Mare. Please note that the tender return deadline is noon on 13th January 2026. The tender pack documents provide the details you will need to be able …

    Published value
    £696kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    22 Jun 2026 → 22 Nov 2026 · 5 months
    Reference
    ocds-h6vhtk-06a855
  14. Ends · in 27 days

    Nutrient Mitigation Scheme

    Norse Commercial Services Ltd · Other public body · East Midlands

    Incumbent: WCI Group Ltd · Last contest: awarded 3% under the estimate

    Norse Commercial Services are undertaking a tender on behalf of Alliance Norse Ltd (a Joint Venture company) to deliver a nutrient mitigation project in the River Wye catchment area (Peak District Dales) following recent advise from Natural…

    Published value
    £2.1minc. VAT as published
    Annual run-rate
    £3.3mpublished value ÷ term, inc. VAT
    Term
    1 Apr 2026 → 23 Nov 2026 · 8 months
    Reference
    ocds-h6vhtk-0560dd
  15. Ends · in 27 days

    AM 420 – Solar PV – South Gwynedd

    Adra (Tai) Cyf · Other public body · Wales (Cymru)

    Incumbent: Emyr Roberts Electrical & Renewables Ltd

    Award Notice for the contract AM 420 – Solar PV – South Gwynedd

    Published value
    £208k
    Annual run-rate
    —term under 6 months
    Term
    3 Aug 2026 → 23 Nov 2026 · 4 months
    Reference
    ocds-h6vhtk-06d588

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.