Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 391–405
- Estimated end · in 86 days
Consultants - Dunanney Pavilion & 3G Pitch
Antrim and Newtownabbey Borough Council · Local authority · Northern Ireland
Incumbent: Rolston Architects · Last contest: 5 bids (5 SME)
The Service is for the provision of a consultant team in conjunction with the separately appointed PM/QS to manage the delivery of the Dunanney Pavilion and 3G pitch Project. New build Pavilion and link building (circa 939m² inc. multipurpo…
- Published value
- £244k
- Annual run-rate
- —start date not published
- Term
- Estimated end 21 Jan 2027 · start not published
- Reference
ocds-h6vhtk-036664
- Estimated end · in 88 days
Consolidated water treatment
BWPC · South West England
Incumbent: Churchill Contract Services Limited · Last contest: 11 bids · awarded 29% over the estimate
Tender for the provision of a consolidated water inspection, treatment & maintenance service, some of which may need to be conducted within short timescales. Term = 3 years, with an option to extend for +1+1 years if required/if performance…
- Published value
- £775k
- Annual run-rate
- —start date not published
- Term
- Estimated end 23 Jan 2027 · start not published
- Reference
ocds-h6vhtk-02e1ad
- Ends · in 90 days
CEFAS26-60 ISO 17025 Reassessment Visit Lowestoft
Cefas · Central government · Nationwide (UK)
Incumbent: U K ACCREDITATION SERVICE
Reassessment visit of our ISO 17025 accreditation for the Lowestoft Laboratory in July 2026
- Published value
- £11k
- Annual run-rate
- £11kpublished value ÷ term, exc. VAT
- Term
- 26 Jan 2026 → 25 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-067690
- Ends · in 91 daysFramework recordPanel · 4 suppliers
COV - Quantity Surveyor and Employers Agent Framework 2025
Coventry City Council · Local authority · West Midlands
Panel: Armson and Partners, CURRIE and BROWN UK LIMITED, PMP Consultants +1 more
- Published value
- £2.0mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 26 Jan 2027 · start not published
- Reference
ocds-h6vhtk-04b39d
- Estimated end · in 92 daysCall-off
Provision of Annual Flexible Hose Assemblies Surveys and Examinations
Ministry of Defence · Central government · Nationwide (UK), South East England
Incumbent: BAE Systems Surface Ships Ltd · Last contest: 3 bids
This notice is for the purposes of announcing the contract award to BAE SYSTEMS SURFACE SHIPS LIMITED for The Provision of Annual Flexible Hose Assemblies Surveys and Examinations for transparency purposes. Expressions of interest are not r…
- Published value
- £47kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 27 Jan 2027 · start not published
- Reference
ocds-h6vhtk-0371f8
- Ends · in 93 days
Consultancy services
Cambridge University Hospitals NHS Foundation Trust · Central government · East of England
Incumbent: No 6 Developments Ltd
940 - Support for maternity cover for CCRH design & consultation.
- Published value
- £103k
- Annual run-rate
- £104kpublished value ÷ term, exc. VAT
- Term
- 29 Jan 2026 → 28 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-0611a6
- Estimated end · in 94 daysFramework record
Marine Seismic Survey and Processing
Radioactive Waste Management Limited · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Shearwater Geoservices Limited
- Published value
- £18mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 29 Jan 2027 · start not published
- Reference
ocds-h6vhtk-02c304
- Estimated end · in 94 days
Architect appointment for Guildhall Yard East project
City of London Corporation · Local authority · Nationwide (UK), Greater London
Incumbent: Bond Bryan Architects · Last contest: 10 bids (10 SME)
Appointment of Architect for Guildhall Yard East Project
- Published value
- £265k
- Annual run-rate
- —start date not published
- Term
- Estimated end 29 Jan 2027 · start not published
- Reference
ocds-h6vhtk-044e96
- Ends · in 94 days
GL1 (contract 2) Leisure Centre Contract Documents NEC 4 Professional Services Contract Agreement
Gloucester City Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: E.G. Carter & Company Limited
See attached contract for details. Progressing Design from RIBA Stage 3 to RIBA Stage 4 1.1. Appoint and lead the Design Team a) Employ Design Consultants: Engage key consultants such as architects, structural engineers, MEP engineers, and …
- Published value
- £144k
- Annual run-rate
- —term under 6 months
- Term
- 27 Aug 2026 → 29 Jan 2027 · 5 months
- Reference
ocds-h6vhtk-06faf7
- Ends · in 94 days
Consultancy Services - Employers Agent - Homeleigh Hostel and Dengate Bungalow
London Borough of Bexley · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Bailey Partnership (consultants) LLP
6433 - Consultancy Services - Employers Agent - Homeleigh Hostel and Dengate Bungalow
- Published value
- £84k
- Annual run-rate
- £91kpublished value ÷ term, exc. VAT
- Term
- 1 Mar 2026 → 29 Jan 2027 · 11 months
- Reference
ocds-h6vhtk-064cc6
- Ends · in 94 days
Bromley North Regeneration - Clerk of Works
London Borough of Bromley · Local authority · Greater London
Incumbent: SILVER DCC LIMITED
The Clerk of Works (Technical Inspector) shall in providing the services and in acting as Clerk of Works exercise the reasonable skill, care, and diligence to be expected of an appropriately qualified professional experienced in acting as C…
- Published value
- £67k
- Annual run-rate
- £54kpublished value ÷ term, exc. VAT
- Term
- 4 Nov 2025 → 29 Jan 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-0781b0
- Ends · in 94 daysExtension option · up to 9 Feb 2028
Architect Services for Leiden Road & Underhill Circus
Oxford City Council · Local authority · South East England
Incumbent: ORIGINAL FIELD OF ARCHITECTURE LIMITED
Professional Architect Services for RIBA Stages 1-3. Development of two new build schemes at feasibility stage to planning application stage. Work to include scheme design, planning application, employers requirements and specifications and…
- Published value
- £58kinc. VAT as published
- Annual run-rate
- £59kpublished value ÷ term, inc. VAT
- Term
- 4 Feb 2026 → 29 Jan 2027 · 1 yr · up to 9 Feb 2028 with extensions
- Reference
ocds-h6vhtk-065495
- Ends · in 94 days
Feasibility study and proposal to launch in house childrens homes
Southend-on-Sea City Council · Local authority · East of England
Incumbent: Tile Hill Interim & Executive Ltd
Subject Matter Expert to complete a full feasibility study and proposal for Southend to launch in house children's homes to address the overspend on external placements. Supply - £45000
- Published value
- £45k
- Annual run-rate
- —term under 6 months
- Term
- 2 Nov 2026 → 29 Jan 2027 · 3 months
- Reference
ocds-h6vhtk-078f7d
- Ends · in 94 days
CSP26816 - Chiller Replacement Design Fee
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Zero Emission Buildings Ltd
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded without competition due to an absence of competition for technical reasons, only a particular supplier can supply the services req…
- Published value
- £21k
- Annual run-rate
- —term under 6 months
- Term
- 2 Sept 2026 → 29 Jan 2027 · 5 months
- Reference
ocds-h6vhtk-06f03b
- Ends · in 95 days
Multidisciplinary Consultancy Services for the Wharton Road Children's Housing Development
London Borough of Bromley · Local authority · Greater London
Incumbent: CONRAD KOSLOWSKY ARCHITECTS LTD
- Published value
- £179k
- Annual run-rate
- £147kpublished value ÷ term, exc. VAT
- Term
- 11 Nov 2025 → 30 Jan 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-05d66c
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,285 contracts and agreements end within 24 months, 3,292 in total · £790m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.