Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 31–45
- Ends · in 34 days
CSP26562 - Compressor Repairs
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: ADCOCK REFRIGERATION AND AIR CONDITIONING LIMITED
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. Contract details notice for the supply of Compressor Repairs to UKRI
- Published value
- £20k
- Annual run-rate
- —not computed
- Term
- 2 Jun 2026 → 30 Nov 2026 · 6 months
- Reference
ocds-h6vhtk-06ac77
- Ends · in 34 days
CSP26819 - Compact Mount Frames
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: ENDEAVOR ENGINEERING LTD
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. Contract details notice for the supply of Compact Mount (pitch and Yaw) fram…
- Published value
- £12k
- Annual run-rate
- —term under 6 months
- Term
- 4 Sept 2026 → 30 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-06f1f6
- Ends · in 34 days
Replacement Fan Coil Unit
Northumbria Healthcare Facilities Management · Central government · Nationwide (UK), North East England
Incumbent: Coldtech Refrigeration and Air Conditioning Limited · Last contest: awarded 3% over the estimate
Replacement Fan Coil Unit at Hexham General Hospital
- Published value
- £10k
- Annual run-rate
- £19kpublished value ÷ term, exc. VAT
- Term
- 1 Jun 2026 → 30 Nov 2026 · 6 months
- Reference
ocds-h6vhtk-066a75
- Ends · in 35 days
Venture house suite 8&9 HVAC replacement
Chesterfield Borough Council · Local authority · East Midlands
Incumbent: Airflow Cooling Ltd
Purchase and installation of a HVAC system to suites 8&9 replacing the obsolete and problematic water based cooling system
- Published value
- £138k
- Annual run-rate
- —term under 6 months
- Term
- 1 Jul 2026 → 1 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-06b1be
- Ends · in 35 days
chiller hire
Cambridge University Hospitals NHS Foundation Trust · Central government · East of England
Incumbent: ADCOCK REFRIGERATION AND AIR CONDITIONING LIMITED
1647 - Continuation of chiller hire for a minimum of 12 weeks.
- Published value
- £18k
- Annual run-rate
- —term under 6 months
- Term
- 2 Sept 2026 → 1 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-06f042
- Ends · in 35 days
Air conditioning unit
Cambridge University Hospitals NHS Foundation Trust · Central government · East of England
Incumbent: ANDREWS SYKES GROUP PLC
1676 -portable air conditioning unit
- Published value
- £18k
- Annual run-rate
- —term under 6 months
- Term
- 2 Sept 2026 → 1 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-06f00b
- Estimated end · in 42 daysFramework recordPanel · 3 suppliers
CAT-24-001 Equipment for food holding, preparation and transport
the Education Authority · Education · Northern Ireland
Panel: CATERING EQUIPMENT SERVICES LTD, CE-Tech, Stephens Catering Equipment Co Ltd
- Published value
- £5.5mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 8 Dec 2026 · start not published
- Reference
ocds-h6vhtk-047dcf
- Ends · in 45 days
CSP26956 - Magnet Supports
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Frazer-Nash Manufacturing Ltd
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. Contract details notice for the supply of Super MuSR Transverse Magnet Suppo…
- Published value
- £19k
- Annual run-rate
- —term under 6 months
- Term
- 23 Oct 2026 → 11 Dec 2026 · 2 months
- Reference
ocds-h6vhtk-078f27
- Ends · in 45 days
CSP26753 - Welded fabrication bank
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: WRES Ltd
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. Contract details notice for the supply of HRPD-X Argon tank 2 mirror to UKRI…
- Published value
- £17k
- Annual run-rate
- —term under 6 months
- Term
- 10 Aug 2026 → 11 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06e0b4
- Ends · in 46 days
Hylands House Boiler Replacement Works
Chelmsford City Council · Local authority · East of England
Incumbent: CLAIRGLOW HEATING LTD
Regulated Below Threshold Shortlisting Process based on Technical Requirements - The Council undertook a 2-stage process to award a contract for the replacement of Hylands House boiler system.
- Published value
- £455k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 12 Dec 2026 · 2 months
- Reference
ocds-h6vhtk-05ff64
- Estimated end · in 48 days
9001633 - Supply of Front Ends K04, K16 & K21 for Diamond-II
DIAMOND LIGHT SOURCE LIMITED · Central government · South East England
Incumbent: FMB Feinwerk und Messtechnik GmbH · Last contest: 2 bids (2 SME)
Located on the Harwell Science and Innovation Campus in Oxfordshire, Diamond Light Source (DLS) is a leading-edge facility for science, engineering and innovation. Diamond allows researchers from academia and industry to investigate the str…
- Published value
- €1,139,500
- Annual run-rate
- —not a GBP value
- Term
- Estimated end 14 Dec 2026 · start not published
- Reference
ocds-h6vhtk-04d6ef
- Ends · in 48 days
UKRI-6158 Additional Thermal Straps for PIP II Cryomodule Project
UK Research and Innovation · Central government · North West England
Incumbent: Technology Applications, Inc
This requirement is for the procurement of additional copper thermal straps for the PIP II cryomodules project for STFC Daresbury.
- Published value
- £91k
- Annual run-rate
- —not computed
- Term
- 17 Jun 2026 → 14 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06b637
- Ends · in 48 days
Oakfield Primary School Boiler Replacement
North Lincolnshire Council · Local authority · Yorkshire and the Humber
Incumbent: Acumen Solutions Ltd
Boiler Replacement at Oakfield primary school
- Published value
- £45kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 15 Sept 2026 → 14 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-06f8df
- Ends · in 48 days
Portable air conditioning units
Cambridge University Hospitals NHS Foundation Trust · Central government · East of England
Incumbent: ANDREWS SYKES GROUP PLC
1697 - Portable air conditioning units to mitigate the challenges caused by the current heat wave. There are multiple clinical areas throughout the estate that do not have sufficient cooling in place. This is causing problems for patients a…
- Published value
- £17k
- Annual run-rate
- —term under 6 months
- Term
- 15 Sept 2026 → 14 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-06f99e
- Ends · in 49 days
UKRI-5317 Automated Liquid Handling Instrument
UK Research and Innovation · Central government · South East England
Incumbent: BioDot Ltd
UKRI has a requirement for an automated liquid handling instrument to support sample handling in ECSS-compliant molecular organic contamination (MOC) analysis workflows within the RAL Space Contamination [Chemical] Laboratory
- Published value
- £51k
- Annual run-rate
- £44kpublished value ÷ term, exc. VAT
- Term
- 20 Oct 2025 → 15 Dec 2026 · 1.2 yrs
- Reference
ocds-h6vhtk-05cfc7
When contracts end · Industrial machinery i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
254 contracts and agreements end within 24 months, 406 in total · £22m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.