Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 31–45
- Estimated end · in 96 days
Contract
Choice Housing · Northern Ireland
Incumbent: J P CORRY · Last contest: 2 bids (0 SME)
Choice Services is looking to appoint a supplier of general building materials. The supplier will be expected to deliver and also allow for collection of urgent materials. This will be a 3 year contract (on a 1+1+1) basis
- Published value
- £108k
- Annual run-rate
- —start date not published
- Term
- Estimated end 31 Jan 2027 · start not published
- Reference
ocds-h6vhtk-0332a6
- Ends · in 97 daysFramework recordPanel · 5 suppliers
Scaffolding Hire and Inspection Services to Falkirk Council Housing Properties
Falkirk Council · Local authority · Scotland
Panel: Clyde Scaffolding Ltd, Mar Scaffolding (Scotland) Limited, The JR Group +2 more
- Published value
- £4.9mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 Jan 2027 · start not published
- Reference
ocds-h6vhtk-036367
- Ends · in 97 days
Tender for supply of uPVC windows and doors for Strips of Craigie Dev
Dundee City Council · Local authority · Scotland
Incumbent: Window Supply Company · Last contest: 5 bids (3 SME)
Manufacture, supply and delivery of uPVC windows and doors for Strips of Craigie Development
- Published value
- £132k
- Annual run-rate
- —start date not published
- Term
- Ends 31 Jan 2027 · start not published
- Reference
ocds-h6vhtk-06b94c
- Estimated end · in 103 daysCall-off
Decoration Solution
Accent Group Ltd · Nationwide (UK), Greater London
Incumbent: B&Q Limited · Last contest: 4 bids (0 SME)
Using PFH Framework Decorative Solutions Lot 1 Retail decorative Solutions Call -Off Contract To provide and supply decoration vouchers, with the ability to create e-vouchers in replacement of physical decorating cards over a 2 year contrac…
- Published value
- £120kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 7 Feb 2027 · start not published
- Reference
ocds-h6vhtk-02d338
- Estimated end · in 106 days
PS/21/102 - Supply of Boilers and Radiator Kits
East Ayrshire Council · Local authority · Scotland
Incumbent: UK Plumbing Supplies Limited · Last contest: 3 bids (0 SME)
Provision of a comprehensive supply, temporary storage and delivery service to the Council's Housing Services and its Installation Contractors for the Supply of Domestic Condensing Boilers, Radiator Kits, Components/Spare Parts and Fitting …
- Published value
- £10m
- Annual run-rate
- —start date not published
- Term
- Estimated end 10 Feb 2027 · start not published
- Reference
ocds-h6vhtk-02daf6
- Estimated end · in 107 days
Supply and delivery of Thin Clients, Servers & IT Equipment
New City College · Education · Greater London
Incumbent: BLUE SKY SYSTEMS LIMITED · Last contest: 9 bids
Supply and delivery of Thin Clients, Servers & IT Equipment
- Published value
- £164k
- Annual run-rate
- —start date not published
- Term
- Estimated end 11 Feb 2027 · start not published
- Reference
ocds-h6vhtk-04b40b
- Estimated end · in 122 daysFramework record
IRM22/7618 - The Supply of Elevated Structures Expeditionary
Ministry of Defence · Central government · West Midlands
Incumbent: Brand Energy & Infrastructure Services UK
Babcock Land Defence Limited, acting as agent for the UK Ministry of Defence, intends to negotiate a Contract with Brand Energy & Infrastructure Services UK, Ltd trading as Lyndon SGB for the Supply of Elevated Structures Expeditionary. All…
- Published value
- £900klargest agreement; total ceiling not published
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 26 Feb 2027 · start not published
- Reference
ocds-h6vhtk-044a55
- Ends · in 123 days
Tender for supply of uPVC windows and doors for Clement Park 2nd Dev
Dundee City Council · Local authority · Scotland
Incumbent: CR Smith Manufacturing · Last contest: 7 bids (4 SME)
Manufacture, supply and delivery of uPVC windows and doors for Clement Park 2nd Development.
- Published value
- £161k
- Annual run-rate
- —start date not published
- Term
- Ends 26 Feb 2027 · start not published
- Reference
ocds-h6vhtk-06b8d6
- Estimated end · in 134 daysFramework record
Framework Agreement for the supply, installation, and maintenance of replacement internal fire doors
LEEDS TRINITY UNIVERSITY · Education · Yorkshire and the Humber
Incumbent: Code Building Solutions Ltd
- Published value
- £175kpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 9 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03175e
- Estimated end · in 135 days
Sprinkler Servicing
ClwydAlyn Housing · Wales (Cymru)
Incumbent: Harmony Fire Ltd · Last contest: 3 bids (0 SME) · awarded at the estimate
ClwydAlyn require an established and competent Supplier with a proven track record to provide servicing and reactive response to its sprinkler systems installed throughout our stock. Our stock is a mixture of general needs homes, Extra Care…
- Published value
- £600k
- Annual run-rate
- —start date not published
- Term
- Estimated end 10 Mar 2027 · start not published
- Reference
ocds-h6vhtk-039a84
- Estimated end · in 135 days
Supply of Bus Shelter Mesh
South Yorkshire Mayoral Combined Authority · Local authority · Yorkshire and the Humber
Incumbent: Bus Shelters Ltd · Last contest: 2 bids (0 SME) · awarded at the estimate
SYMCA is seeking a resilient mesh panel supply, installation and maintenance service provider for bus shelters. The service provider will be responsible for providing: • Resilient mesh panel production, installation and maintenance service.…
- Published value
- £270k
- Annual run-rate
- —start date not published
- Term
- Estimated end 10 Mar 2027 · start not published
- Reference
ocds-h6vhtk-0397a3
- Estimated end · in 136 days
Emergency Services Network (ESN) Locker Infrastructure
National Highways Limited · Central government · Nationwide (UK)
Incumbent: eLocker Limited · Last contest: 3 bids (3 SME)
National Highways is exploring opportunities to implement a new contract for a Locker and Key Cabinet Infrastructure.
- Published value
- £5.8m
- Annual run-rate
- —start date not published
- Term
- Estimated end 11 Mar 2027 · start not published
- Reference
ocds-h6vhtk-030815
- Estimated end · in 140 daysFramework recordPanel · 7 suppliers
Primary Materials Suppliers framework
Sheffield City Council · Local authority · Nationwide (UK)
Panel: Arnold Laver & Co Ltd, Central Glass Limited, Dulux Decorator Centre +4 more
Re-procurement plannedPrimary Materials · tender expected
- Published value
- £7.0mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 15 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03539a
- Estimated end · in 148 days
Supply and Delivery of HWRC Skips
Walsall Metropolitan Borough Council · Local authority · West Midlands
Incumbent: Skip Units Ltd · Last contest: 1 bid (1 SME) · awarded at the estimate
Walsall Council wishes to procure a supplier for supply and delivery of skips, intended to be used continuously at a Household Waste Recycling Centre (HWRC) in Walsall. This tender opportunity is for Purchase of skips and does not include h…
- Published value
- £425k
- Annual run-rate
- —start date not published
- Term
- Estimated end 23 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04dcd1
- Estimated end · in 150 daysFramework recordPanel · 6 suppliers
Quarry Products Framework 2023-2027
Carmarthenshire County Council · Local authority · Wales (Cymru)
Panel: A&C Aggregates Ltd, Gavin Griffiths Recycling Ltd, Gerald D Harries & Sons Ltd +3 more
- Published value
- £4.8mlargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 25 Mar 2027 · start not published
- Reference
ocds-h6vhtk-039755
When contracts end · Construction structures and materials i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
149 contracts and agreements end within 24 months, 259 in total · £63m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 44 divisions shown.
85Health and social work services2,71579Business services: law, marketing, consulting67560Transport services (except waste transport)61650Repair and maintenance services60390Sewage, refuse, cleaning and environmental52245Construction work50072IT services: consulting, software, internet46771Architectural, construction, engineering454
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.