Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 31–45
- Ends · in 4 daysExtension option
715904510 - Defence Water Services Programme (DWSP) - Should Cost Model (SCM) Support
Ministry of Defence · Central government · Nationwide (UK)
Incumbent: Water Research Centre Limited
71800000 - Consulting services for water-supply and waste consultancy - 90713100 - Consulting services for water-supply and waste-water other than for construction - Should Cost Model Services using WRC - IPR model, total £107,944 for servi…
- Published value
- £108k
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06d7ab
- Ends · in 4 daysExtension option · up to 31 Dec 2026
Major Water Infrastructure Programme (MWIP) - Programmatic Delivery and Opportunity Assessment
The Water Services Regulation Authority · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Allora Infrastructure Limited
Undertake a programme-wide Value for Money (VfM) appraisal of the Major Water Infrastructure Programme (MWIP) to identify, test and prioritise credible cost reduction and VfM opportunities, with a focus on decisions that can influence cost,…
- Published value
- £100k
- Annual run-rate
- —term under 6 months
- Term
- 1 Aug 2026 → 31 Oct 2026 · 3 months · up to 31 Dec 2026 with extensions
- Reference
ocds-h6vhtk-077486
- Ends · in 4 days
PAWLS replacment support
The Mayor and Commonalty and Citizens of the City of London · Local authority
Incumbent: Eadon Consulting Ltd
The Provider is: [Eadon Consulting] (Company no. [06759718]) of [UK] The Commission is: [Tower Bridge Pawls Refurbishment Design] as more particularly described in the further documents which are attached to and form part of this Order The …
- Published value
- £100kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 8 Jun 2026 → 31 Oct 2026 · 5 months
- Reference
ocds-h6vhtk-06bd6a
- Ends · in 4 days
– Interim Reactive Mechanical & Plumbing Services
The Hillingdon Hospitals NHS Foundation Trust · Central government
Incumbent: OCS HEATING AND GAS LIMITED
Provision of interim reactive maintenance, emergency call-out services, and remedial works relating to heating systems, hot and cold water systems, drainage, and general plumbing infrastructure to ensure continuity of Estates services pendi…
- Published value
- £75k
- Annual run-rate
- —term under 6 months
- Term
- 1 Jun 2026 → 31 Oct 2026 · 5 months
- Reference
ocds-h6vhtk-06b1e7
- Ends · in 4 daysExtension option · up to 30 Nov 2026
Water Risk Assessments
Royal Holloway and Bedford New College · Education · South East England
Incumbent: Sentinel Water Services
The contract is for water hygiene risk assessments across specified buildings within the University estate.
- Published value
- £63k
- Annual run-rate
- —not computed
- Term
- 11 May 2026 → 31 Oct 2026 · 6 months · up to 30 Nov 2026 with extensions
- Reference
ocds-h6vhtk-06a59d
- Ends · in 4 days
Outpatient Decant Professional Consultancy Services
Imperial College Healthcare NHS Trust · Central government
Incumbent: RAM Building Consultancy Ltd
Professional consultancy, design and project management services to support the Outpatient Decant project, enabling relocation of approximately 350 staff from the St Mary's Hospital Adult Outpatients Department into Capital House
- Published value
- £51k
- Annual run-rate
- —term under 6 months
- Term
- 20 Aug 2026 → 31 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06f320
- Ends · in 4 days
Level 1 Strategic Flood Risk Assessment (SFRA)
Torridge District Council · Local authority · South West England
Incumbent: FPS Environmental Limited
The commission is to provide consultancy services for Torridge District Council and North Devon District Council (the 'Partner Authority') to prepare a Level 1 Strategic Flood Risk Assessment (SFRA) for North Devon Council and Torridge Dist…
- Published value
- £45k
- Annual run-rate
- —term under 6 months
- Term
- 13 Jul 2026 → 31 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06c7b8
- Ends · in 4 days
Wychavon Town Health Strategy
Wychavon District Council · Local authority · West Midlands
Incumbent: Strategic Healthcare Planning LLP
Delivery of a health strategy for Wychavon Town
- Published value
- £45k
- Annual run-rate
- —term under 6 months
- Term
- 6 Jul 2026 → 31 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06df3f
- Ends · in 4 days
UK7 - Contract Details Notice
National Highways Limited · Central government
Incumbent: Weatherby Contract Services Ltd
Indirect Procurement currently requires additional support in the Estates category to lead on the strategy, contract working groups, contract amendments and implementation of a targeted Estates set of contract documents. Interim specialist …
- Published value
- £40k
- Annual run-rate
- £79kpublished value ÷ term, exc. VAT
- Term
- 30 Apr 2026 → 31 Oct 2026 · 6 months
- Reference
ocds-h6vhtk-07823a
- Ends · in 4 days
UK7 - Contract Details Notice
National Highways Limited · Central government
Incumbent: HGJ Consultancy Ltd
Interim specialist procurement resources, to supplement core staff in the Procurement Division in undertaking procurements.
- Published value
- £40k
- Annual run-rate
- —term under 6 months
- Term
- 1 Aug 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-078240
- Ends · in 4 days
Fixed Wire Testing
Royal Holloway and Bedford New College · Education · South East England
Incumbent: Bourneside Electrical Services Ltd
This procurement covers the provision of specialist Fixed Wire Testing (EICR) services across multiple buildings, including the full inspection, testing and reporting of electrical installations to ensure compliance with BS 7671.
- Published value
- £36k
- Annual run-rate
- £55kpublished value ÷ term, exc. VAT
- Term
- 10 Mar 2026 → 31 Oct 2026 · 8 months
- Reference
ocds-h6vhtk-0667f3
- Ends · in 4 days
002738 Registered Building Controller for BSR
British Library Board · Central government · Nationwide (UK)
Incumbent: Bureau Veritas
Registered building controller for the British Library Boston Spa renewed Project
- Published value
- £35k
- Annual run-rate
- —not computed
- Term
- 8 May 2026 → 31 Oct 2026 · 6 months
- Reference
ocds-h6vhtk-0697f4
- Ends · in 4 days
Stock Condition Surveys
Tyne and Wear Fire and Rescue Authority · Police & fire · North East England
Incumbent: RIDGE AND PARTNERS LLP
Procurement of Stock Condition Surveys across the TWFRS estate via the Crown Commercial Service Estate Management Services 2 Framework Agreement (RM6343), Lot 4 - Surveying and Strategic Advice. The contract was awarded following a further …
- Published value
- £33k
- Annual run-rate
- —term under 6 months
- Term
- 10 Aug 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-078675
- Ends · in 4 days
Chapelcross - Turbine Hall Assessment Study
Nuclear Restoration Services Limited · Other public body
Incumbent: Brown and Mason Group Limited
Chapelcross - to provide a Report on turbine hall
- Published value
- £33k
- Annual run-rate
- —term under 6 months
- Term
- 15 Jul 2026 → 31 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06cc26
- Ends · in 4 days
Architectural services to support the proposed Gillas Lane Primary Academy
Sunderland City Council · Local authority · North East England
Incumbent: Building Design Northern
Provision of Architectural services to support the proposed Gillas Lane Primary Academy
- Published value
- £31k
- Annual run-rate
- £31kpublished value ÷ term, exc. VAT
- Term
- 5 Nov 2025 → 31 Oct 2026 · 1 yr
- Reference
ocds-h6vhtk-05f157
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,285 contracts and agreements end within 24 months, 3,292 in total · £790m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.