Showing 311–320
- Ends · in 16 days
Haven Lane
Herefordshire Council · Local authority · West Midlands
Incumbent: OWEN PELL LIMITED
Haven Lane - DN822618- Drainage Works
- Published value
- £68k
- Annual run-rate
- —term under 6 months
- Term
- 19 Oct 2026 → 13 Nov 2026 · 26 days
- Reference
ocds-h6vhtk-078edd
- Ends · in 16 days
South Farnborough Infant School - Fire Repair Instructions
Hampshire County Council · Local authority · South East England
Incumbent: i4 Projects Ltd
Fire repair instructions: Install two new screens across corridors, some emergency lighting and a smoke detector.
- Published value
- £42k
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 13 Nov 2026 · 19 days
- Reference
ocds-h6vhtk-0789f0
- Ends · in 16 days
Queen Street Properties - Windows Double Glazing
City of York Council · Local authority · Yorkshire and the Humber
Incumbent: Sovereign Group Limited
City of York Council is seeking a contractor to deliver the 'Queen Street Properties - Windows Double Glazing' contract.
- Published value
- £29k
- Annual run-rate
- £57kpublished value ÷ term, exc. VAT
- Term
- 13 May 2026 → 13 Nov 2026 · 6 months
- Reference
ocds-h6vhtk-0693b1
- Estimated end · in 17 daysDynamic purchasing system record
SEC Responsive Repairs, Voids, Planned Works DPS
South East Consortium · Nationwide (UK), Greater London
Incumbent: Masher Brothers Ltd
- Published value
- £500mpublished ceiling for the whole dynamic purchasing system
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 14 Nov 2026 · start not published
- Reference
ocds-h6vhtk-02c6a7
- Ends · in 17 daysExtension option
Bexhill Leisure Centre
Rother District Council · Local authority · South East England
Incumbent: BMR CONSTRUCTION LIMITED
Rother District Council are seeking a suitably qualified and experienced Contractor to carry out two projects: 1. The refurbishment construction at Ravenside Pool, which involves Mechanical and Electrical works, swimming pool improvements a…
- Published value
- £1.3m
- Annual run-rate
- —term under 6 months
- Term
- 10 Aug 2026 → 14 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-06e08c
- Ends · in 17 days
Diversion of Northern Gas Networks Apparatus - Vodafone
Stockton on Tees Borough Council · Local authority · North East England
Incumbent: VODAFONE LIMITED
The diversion of Vodafone apparatus is necessary to permit the construction of a traffic signal junction at the junction of Yarm Back Lane/Darlington Back Lane. Only Vodafone can undertake the diversion of their apparatus so a direct award …
- Published value
- £323k
- Annual run-rate
- £345kpublished value ÷ term, exc. VAT
- Term
- 8 Dec 2025 → 14 Nov 2026 · 11 months
- Reference
ocds-h6vhtk-064676
- Ends · in 17 days
AV Project M&E Enabling Works
BANK OF ENGLAND · Central government · Nationwide (UK)
Incumbent: Volmech Electrical Contractors Limited
Mechanical and Electrical Enabling works to support the installation of Audio-Visual equipment.
- Published value
- £160k
- Annual run-rate
- —term under 6 months
- Term
- 15 Jun 2026 → 14 Nov 2026 · 5 months
- Reference
ocds-h6vhtk-0778d1
- Ends · in 17 days
Centenary Court - Flat Roof Works
CALICO HOMES LIMITED · Other public body · North West England
Incumbent: R.L.LOVATT LIMITED
Roofing refurbishment works to selected flat roof areas at the Centenary Court office to ensure the roof is suitable to accommodate a proposed solar PV installation.
- Published value
- £76kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 28 Sept 2026 → 14 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-0790e9
- Estimated end · in 18 days
Kitchen, bathrooms and associated works
Golding Homes · South East England
Incumbent: Mulalley & Company Limited · Last contest: 10 bids (0 SME) · awarded at the estimate
Kitchen and Bathroom installations
Re-procurement openGH2011 Kitchen and Bathrooms Refurbishment · bids close
- Published value
- £15m
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Nov 2026 · start not published
- Reference
ocds-h6vhtk-03c3f9
- Estimated end · in 18 days
GCPN-SteelBuild-2025
Godmanchester Town Council · Local authority · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: ANMER CONSTRUCTION LIMITED · Last contest: 6 bids
1. Introduction Godmanchester Town Council invites tenders from suitably qualified contractors for the supply, delivery, and full construction of a steel-framed building (13m x 13m) at their Community Plant Nursery. Godmanchester Community …
- Published value
- £118k
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Nov 2026 · start not published
- Reference
ocds-h6vhtk-050dd2
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,848 contracts and agreements end within 24 months, 4,753 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,66945Construction work2,10872IT services: consulting, software, internet1,62760Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.