Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 466–480
- Ends · in 34 days
Provision of BCH Fencing Works
BLACKPOOL COUNCIL · Local authority · North West England
Incumbent: TW Fencing · Last contest: 5 bids · awarded at the estimate
Blackpool Coastal Housing (BCH) is looking to appoint a Contractor to undertake Fencing works on the social housing stock. BCH wishes to appoint a Contractor who can clearly demonstrate the ability to meet our requirements and who offers th…
- Published value
- £150k
- Annual run-rate
- —start date not published
- Term
- Ends 30 Nov 2026 · start not published
- Reference
ocds-h6vhtk-049225
- Ends · in 34 days
NCC202600187 - Repaint A48 LG Footbridge No:3418
Newport City Council · Central government · Wales (Cymru)
Incumbent: UK Mae Solutions
The LG Footbridge is in need of painting and has corrosion forming on various structural surfaces. The highly specialised nature of these works requires the highest competency and site management. MAE have proven their roped access skill an…
- Published value
- £130k
- Annual run-rate
- —term under 6 months
- Term
- 21 Sept 2026 → 30 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-06f9a2
- Ends · in 34 days
External Road Windmill Gate Access
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: DH Building Services Oxford Ltd
Provision of External Road Windmill Gate Access works
- Published value
- £111k
- Annual run-rate
- —term under 6 months
- Term
- 8 Sept 2026 → 30 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-06f529
- Ends · in 34 days
Barwin Roofing and Construction Services Ltd
The Guinness Partnership · Other public body · South East England
Incumbent: Barwin Roofing and Construction Services Ltd
Refurbishment / major works to meet building regulations.
- Published value
- £109kinc. VAT as published
- Annual run-rate
- £109kpublished value ÷ term, inc. VAT
- Term
- 2 Dec 2025 → 30 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-060f72
- Ends · in 34 days
Unit 47 Greenfield – Low Carbon Heat Grant Electrical Works – MARA Electrical Ltd
Flintshire County Council · Local authority · Nationwide (UK)
Incumbent: MARA Electrical Ltd
Specialist electrical works associated with the Low Carbon Heat Grant funded improvements at Unit 47, Greenfield Business Park, Greenfield. MARA Electrical Ltd is undertaking the electrical works associated with the low-carbon heating insta…
- Published value
- £93k
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 30 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-07831d
- Ends · in 34 days
Boilers and Flues Replacement at King Edward VII Hospital
NHS Property Services Limited · NHS & health
Incumbent: Commercial Gas Engineers Southern Ltd
Contract for Boilers and Flues Replacement at King Edward VII Hospital
- Published value
- £89k
- Annual run-rate
- —term under 6 months
- Term
- 1 Nov 2026 → 30 Nov 2026 · 30 days
- Reference
ocds-h6vhtk-078b92
- Ends · in 34 days
Keynsham Memorial Park - Repair & Maintenance Works
Bath & North East Somerset Council · Local authority · South West England
Incumbent: H. Mealing & Sons Limited
Provision of for the Repair and Maintenance Work at Keynsham Memorial Park, Keynsham, Bristol BS31 1HL The total value of this contract's 3 month term is £86,575.00 (excl. VAT) The total value of this contract's 3 month term is £103,890 (in…
- Published value
- £87k
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 30 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-06ebc2
- Ends · in 34 days
The Mercian Trust QMHS Cottage Demolition
The Mercian Trust · Other public body · Nationwide (UK)
Incumbent: CITY DEMOLITION CONTRACTORS (BIRMINGHAM) LIMITED
The Mercian Trust are looking to contract for the demolition of 55 and 56 Lichfield Street (The Cottages). The documents for this requirement have been produced by Wakemans Limited and the tender process is being administrated by The CPC.
- Published value
- £85k
- Annual run-rate
- —term under 6 months
- Term
- 15 Oct 2026 → 30 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-07882f
- Ends · in 34 days
Chard Hospital Generator and Switchgear Upgrade
Somerset NHS Foundation Trust · Central government · South West England
Incumbent: Knight Electrical Limited
Upgrade of generator and electrical switchgear systems at Chard Hospital, including installation, cabling, controls, and commissioning works.
- Published value
- £82k
- Annual run-rate
- —term under 6 months
- Term
- 23 Jun 2026 → 30 Nov 2026 · 5 months
- Reference
ocds-h6vhtk-06baf0
- Ends · in 34 days
Holmleigh Primary School Roof Replacement / Roof Access project
London Borough of Hackney · Local authority · Greater London
Incumbent: THAMESIDE ROOFING LTD
Deliver works to remove and replace the roof on the Administration Block of Holmleigh Primary School.
- Published value
- £79k
- Annual run-rate
- £156kpublished value ÷ term, exc. VAT
- Term
- 29 May 2026 → 30 Nov 2026 · 6 months
- Reference
ocds-h6vhtk-06945c
- Ends · in 34 days
REFURBISHMENT TO FORM COMMUNITY HUB AT 2 ST ANDREWS PARADE
NSAH (Alliance Homes) Ltd · Other public body · South West England
Incumbent: D R Jones Yeovil Ltd
This procurement is for the provision of services related to the Refurbishment of a former hairdresser's retail unit to form Community Hub, 2 St. Andrew's Parade, Weston-Super-Mare, North Somerset BS23 3SS.
- Published value
- £76kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 30 Sept 2026 → 30 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-06f035
- Ends · in 34 days
Underpass - Cold Bridging - Regents Court
London Borough of Hackney · Local authority · Greater London
Incumbent: CHIGWELL (LONDON) PLC
Install Wetherby Stone Wool Silicone External Wall Insulation System to underpass which is causing cold bridging to properties.
- Published value
- £75k
- Annual run-rate
- —term under 6 months
- Term
- 1 Jul 2026 → 30 Nov 2026 · 5 months
- Reference
ocds-h6vhtk-06c317
- Ends · in 34 days
Bedworth Switchgear Project
The Police and Crime Commissioner for Warwickshire · Police & fire · West Midlands
Incumbent: R.D. JUKES & Co Ltd
Please note this is an AWARDED contract and is NOT a call for competition. The Police and Crime Commissioner for Warwickshire has awarded a contract, on behalf of Warwickshire Police, for the provision of a switchgear works project at Bedwo…
- Published value
- £70k
- Annual run-rate
- —term under 6 months
- Term
- 1 Oct 2026 → 30 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-077f42
- Ends · in 34 days
RHUL-27047 Cold water Storage Tank Chlorination and Disinfection
Royal Holloway and Bedford New College · Education · South East England
Incumbent: H2OCHEM LTD
Awarded to H20 Chem Limited for Cold Water Storage Tank Chlorination and Disinfection following requests for quotations.
- Published value
- £58k
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 30 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-078618
- Ends · in 34 days
To undertake the second phase highway modelling work, including the development of the future base model required for project completion.
The Mayor and Commonalty and Citizens of the City of London · Local authority
Incumbent: Norman Rourke Pryme
General project management meetings with the consultant (bi-weekly), milestones tracking, review of programme both internally and externally with consultant, etc. A dedicated Project Manager has been assigned to the project and they will at…
- Published value
- £54kinc. VAT as published
- Annual run-rate
- £87kpublished value ÷ term, inc. VAT
- Term
- 20 Apr 2026 → 30 Nov 2026 · 7 months
- Reference
ocds-h6vhtk-069294
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.