Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 481–495
- Estimated end · in 120 days
Fixed Wire Testing
NHS Lanarkshire · NHS & health · Scotland
Incumbent: phs Compliance · Last contest: 9 bids (8 SME)
The NHS Lanarkshire (NHSL) property portfolio comprises approximately 20,000 distribution board final circuits located within circa 60 healthcare facilities throughout NHSL estate. Sites vary in size from large acute hospitals to small rura…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 24 Feb 2027 · start not published
- Reference
ocds-h6vhtk-03fc28
- Estimated end · in 120 days
The Provision of Project Management services for the Dane Park new housing developments in Hull, Direct Award, Lot 3
Kingston Upon Hull City Council · Local authority · Nationwide (UK), Yorkshire and the Humber
Incumbent: GGP Consult · Last contest: 18 bids (1 SME)
- Published value
- £260k
- Annual run-rate
- —start date not published
- Term
- Estimated end 24 Feb 2027 · start not published
- Reference
ocds-h6vhtk-02e22f
- Ends · in 120 daysCall-offExtension option · up to 31 Mar 2027
Preliminary Design Call-off Contract
NATIONAL NUCLEAR LABORATORY LIMITED · Other public body · Nationwide (UK), North West England
Incumbent: NORTH WEST PROJECTS LIMITED (trading as ACTEMIUM DESIGN UK)
- Published value
- £888kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- 13 Jul 2026 → 24 Feb 2027 · 7 months · up to 31 Mar 2027 with extensions
- Reference
ocds-h6vhtk-05d301
- Ends · in 120 daysExtension option · up to 31 Mar 2027
Preliminary Design Call-off Contract
NATIONAL NUCLEAR LABORATORY LIMITED · Other public body · North West England
Incumbent: NORTH WEST PROJECTS LIMITED (trading as ACTEMIUM DESIGN UK)
This contract is the second call-off under the Strategic Design Partner Framework for HALEU Deconversion. The contracted supplier is to undertake Preliminary Design for the Deconversion R&D Rig.
- Published value
- £888k
- Annual run-rate
- £1.4mpublished value ÷ term, exc. VAT
- Term
- 13 Jul 2026 → 24 Feb 2027 · 7 months · up to 31 Mar 2027 with extensions
- Reference
ocds-h6vhtk-06e890
- Ends · in 120 daysExtension option · up to 24 Feb 2029
TWBC - Stock Condition Surveys
Tunbridge Wells Borough Council · Local authority · South East England
Incumbent: BLB Chartered Surveyors
Tunbridge Wells Borough Council is looking to procure a qualified contractor for completing Stock condition surveys on council owned buildings. To be completed utilising in house asset management software (logons and training will be given)…
- Published value
- £0
- Annual run-rate
- —not computed
- Term
- 22 Jun 2026 → 24 Feb 2027 · 8 months · up to 24 Feb 2029 with extensions
- Reference
ocds-h6vhtk-05ec3c
- Estimated end · in 121 days
Housing Stock Condition Surveys
Renfrewshire Council · Local authority · Scotland
Incumbent: JMP Construction and Property Consultants · Last contest: 2 bids (1 SME)
Renfrewshire Council require to place a contract with a single supplier that has architectural, energy efficiency, stock condition surveying, quantity surveying and structural engineering skills and experience in order to provide Housing St…
- Published value
- £1.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 25 Feb 2027 · start not published
- Reference
ocds-h6vhtk-041165
- Estimated end · in 121 days
Cost Consultant appointment for Guildhall Yard East project
City of London Corporation · Local authority · Nationwide (UK), Greater London
Incumbent: CURRIE and BROWN UK LIMITED · Last contest: 10 bids (7 SME) · awarded 13% under the estimate
Appointment of Cost Consultant services for Guildhall Yard East Project
- Published value
- £130k
- Annual run-rate
- —start date not published
- Term
- Estimated end 25 Feb 2027 · start not published
- Reference
ocds-h6vhtk-044e98
- Ends · in 121 days
Construction Manager Services for New County Hall Integrated Service Hub, Truro
Cornwall Council · Local authority · South West England
Incumbent: Fox Construction Solutions Ltd · Last contest: 4 bids (4 SME)
A JCT Construction Management Appointment contract that would require the appointed Service Provider to act as the Council's agent and be responsible for delivering a construction management service for the Integrated Service Hub (which hav…
- Published value
- £806k
- Annual run-rate
- —start date not published
- Term
- Ends 25 Feb 2027 · start not published
- Reference
ocds-h6vhtk-044b34
- Ends · in 121 days
Project Manager and Quantity Surveyor Support (RIBA 4 & 5) - The Maltings, Uttoxeter
East Staffordshire Borough Council · Local authority · West Midlands
Incumbent: Armson and Partners
East Staffordshire Borough Council (ESBC) is seeking suitably qualified project managers and quantity surveyors to support us through the delivery of RIBA 4 (PCSA) and RIBA 5 stages. For the demolition of the Maltings Shopping Precinct & Fo…
- Published value
- £26k
- Annual run-rate
- £28kpublished value ÷ term, exc. VAT
- Term
- 19 Mar 2026 → 25 Feb 2027 · 11 months
- Reference
ocds-h6vhtk-067a88
- Ends · in 122 daysExtension option · up to 26 Aug 2027Buyer plans to re-tender 4 Dec 2026
Highways Adoption Services
City of York Council · Local authority · Yorkshire and the Humber
Incumbent: HIGHWAY ADOPTIONS LTD
Provision of support to City of York Council's Highway Adoptions team. It will be used to second external staff from the Supplier into the Client's Highway Adoptions team to support the work of the team, including when additional support is…
- Published value
- £200k
- Annual run-rate
- £200kpublished value ÷ term, exc. VAT
- Term
- 27 Feb 2026 → 26 Feb 2027 · 1 yr · up to 26 Aug 2027 with extensions
- Reference
ocds-h6vhtk-05ef92
- Ends · in 122 days
Architectural design support
BANK OF ENGLAND · Central government · Greater London
Incumbent: PRINGLE RICHARDS SHARRATT LIMITED
Service contract for the provision of heritage building design support required at the Bank's Threadneedle Street site.
- Published value
- £71k
- Annual run-rate
- £77kpublished value ÷ term, exc. VAT
- Term
- 26 Mar 2026 → 26 Feb 2027 · 11 months
- Reference
ocds-h6vhtk-0680dc
- Ends · in 122 days
Silo Waste Retrieval Arm - SWORD Research and Developement
Nuclear Restoration Services Limited · Other public body
Incumbent: Penny Engineering Limited
A competitive contract has been awarded by Nuclear Restoration Services Limited (Dounreay) for SWORD Research and Development.
- Published value
- £30k
- Annual run-rate
- —term under 6 months
- Term
- 22 Sept 2026 → 26 Feb 2027 · 5 months
- Reference
ocds-h6vhtk-078898
- Estimated end · in 123 daysFramework recordPanel · 9 suppliers
Supply of Electrical Testing Services Y23003
Kent County Council · Local authority · Nationwide (UK)
Panel: AJS Ltd, Fixatex Limited, J MCCANN LTD +6 more
Re-procurement plannedY27008 Electrical Testing Services
- Published value
- £10mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 27 Feb 2027 · start not published
- Reference
ocds-h6vhtk-037ec1
- Ends · in 123 days
CEFAS26-79 Contract for for Macrofauna Analysis of Sediment Samples
Cefas · Central government
Incumbent: Fugro GB Marine Ltd · Last contest: awarded 16% under the estimate
Contract for the processing of 33 macrofaunal samples by extracting and identifying all biota retained on a 1.0 mm capture mesh, in accordance with the extraction and identification protocols set out in the NMBAQC guidelines.
- Published value
- £21k
- Annual run-rate
- —term under 6 months
- Term
- 6 Oct 2026 → 27 Feb 2027 · 5 months
- Reference
ocds-h6vhtk-06dc3e
- Ends · in 124 days
Asbestos Surveying and Sampling
Central Bedfordshire Council · Local authority · East of England
Incumbent: Pennington Choices Limited · Last contest: 5 bids (5 SME) · awarded at the estimate
Asbestos Surveying and Sampling Services
- Published value
- £680k
- Annual run-rate
- —start date not published
- Term
- Ends 28 Feb 2027 · start not published
- Reference
ocds-h6vhtk-0359ac
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,285 contracts and agreements end within 24 months, 3,292 in total · £790m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.