Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 526–540
- Estimated end · in 128 daysCall-off
AMP8 Engineering Consultancy Services
Dwr Cymru Cyfyngedig · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Stantec UK Limited · Last contest: 21 bids (6 SME)
- Published value
- £40mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 4 Mar 2027 · start not published
- Reference
ocds-h6vhtk-02874b
- Estimated end · in 128 daysFramework record
PROVISION OF CHARTERED QUANTITY SURVEYOR SERVICES
Antrim and Newtownabbey Borough Council · Local authority · Northern Ireland
Incumbent: ChandlerKBS
Antrim and Newtownabbey Borough Council would like to invite tenders for the provision of independent Chartered Quantity Surveyor services to support the Council’s Regeneration Team in the delivery and administration of two separate schemes…
- Published value
- £300klargest agreement; total ceiling not published
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 4 Mar 2027 · start not published
- Reference
ocds-h6vhtk-0415c7
- Ends · in 128 daysExtension option · up to 4 Mar 2028
EPC Assessments Residential
Ipswich Borough Council · Local authority · East of England
Incumbent: Compliance 100 Ltd · Last contest: awarded 20% under the estimate
Ipswich Borough Council are currently out to tender for the provision of EPC Assessments of Residential properties This opportunity is available in the 'Current Tenders' area of portal. Interested parties are invited to express their intere…
- Published value
- £137k
- Annual run-rate
- £137kpublished value ÷ term, exc. VAT
- Term
- 5 Mar 2026 → 4 Mar 2027 · 1 yr · up to 4 Mar 2028 with extensions
- Reference
ocds-h6vhtk-059c74
- Ends · in 128 daysExtension option · up to 4 Sept 2027
Rotherham Estates Plan
Rotherham Metropolitan Borough Council · Local authority
Incumbent: Archus
To develop a strategic estate framework for Rotherham that: - Enables integrated community- based care aligned with the NHS 10-year plan - Supports the delivery of Rotherham's Neighbourhood Health and Wellbeing model - Optimises estate util…
- Published value
- £83kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 4 Mar 2027 · 5 months · up to 4 Sept 2027 with extensions
- Reference
ocds-h6vhtk-078087
- Ends · in 129 days
– Architectural Services
Imperial College Healthcare NHS Trust · Central government
Incumbent: Freeman Ankerman Partnership Limited
Architectural design services for installation of second PET CT scanner and associated refurbishments at CXH
- Published value
- £41k
- Annual run-rate
- £50kpublished value ÷ term, exc. VAT
- Term
- 11 May 2026 → 5 Mar 2027 · 10 months
- Reference
ocds-h6vhtk-06bc3c
- Estimated end · in 130 daysFramework recordPanel · 34 suppliers
South East Wales Technical and Professional Services
Cardiff Council · Local authority · Nationwide (UK), Wales (Cymru)
Panel: AECOM LIMITED, AHR Architects Ltd, ARCADIS CONSULTING (UK) LIMITED +31 more
- Published value
- £125mlargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 6 Mar 2027 · start not published
- Reference
ocds-h6vhtk-02a697
- Estimated end · in 130 daysFramework recordPanel · 2 suppliers
The Energy Service framework 2023-2027
Welsh Government · Wales (Cymru)
Panel: Energy Saving Trust, The Carbon Trust
- Published value
- £30mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 6 Mar 2027 · start not published
- Reference
ocds-h6vhtk-037531
- Estimated end · in 130 daysPanel · 9 suppliers
Estates and Residential Development Professional Services
Cardiff Council · Local authority · Nationwide (UK), Wales (Cymru)
Panel: AVISON YOUNG (UK) LIMITED, Alder King LLP, Bruton Knowles LLP +6 more
- Published value
- £19m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 6 Mar 2027 · start not published
- Reference
ocds-h6vhtk-06a88e
- Estimated end · in 130 daysPanel · 9 suppliers
Estates and Residential Development Professional Services
Cardiff Council · Local authority · Nationwide (UK), Wales (Cymru)
Panel: AVISON YOUNG (UK) LIMITED, Alder King LLP, Bruton Knowles LLP +6 more
- Published value
- £19m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 6 Mar 2027 · start not published
- Reference
ocds-h6vhtk-06a893
- Estimated end · in 130 daysPanel · 11 suppliers
Civil and Highway Engineering Consultants
Cardiff Council · Local authority · Nationwide (UK), Wales (Cymru)
Panel: AECOM LIMITED, ATKINS LTD, Alistair Burroughs Design Partnership Ltd +8 more
- Published value
- £19m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 6 Mar 2027 · start not published
- Reference
ocds-h6vhtk-06a880
- Estimated end · in 130 daysFramework recordPanel · 26 suppliers
Development & Maintenance Consultancy Framework
Grŵp Cynefin · Wales (Cymru)
Panel: Ainsley Gommon Architects Ltd, Asbri Planning, BRO Consultancy Ltd +23 more
- Published value
- £10mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 6 Mar 2027 · start not published
- Reference
ocds-h6vhtk-033bdf
- Estimated end · in 130 daysPanel · 9 suppliers
Aviation Consultancy
Cardiff Council · Local authority · Nationwide (UK), Wales (Cymru)
Panel: AECOM LIMITED, ARCADIS CONSULTING (UK) LIMITED, ATKINS LTD +6 more
- Published value
- £6.5m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 6 Mar 2027 · start not published
- Reference
ocds-h6vhtk-06a895
- Estimated end · in 130 daysPanel · 10 suppliers
Geotechnical Consultants
Cardiff Council · Local authority · Nationwide (UK), Wales (Cymru)
Panel: AECOM LIMITED, ATKINS LTD, Amey OW Limited +7 more
- Published value
- £3.0m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 6 Mar 2027 · start not published
- Reference
ocds-h6vhtk-06a897
- Estimated end · in 131 days
PROVISION OF LIGHT DETECTION AND RANGING (LiDAR) AND AERIAL DIGITAL PHOTOGRAPHY SURVEYING AND DATA (LiDAR MAPPING)
Shetland Islands Council · Local authority · Scotland
Incumbent: Field Geospatial AS · Last contest: 2 bids (2 SME)
- Published value
- £207k
- Annual run-rate
- —start date not published
- Term
- Estimated end 7 Mar 2027 · start not published
- Reference
ocds-h6vhtk-05ef81
- Estimated end · in 131 days
PROVISION OF LIGHT DETECTION AND RANGING (LiDAR) AND AERIAL DIGITAL PHOTOGRAPHY SURVEYING AND DATA (LiDAR MAPPING)
Shetland Islands Council · Local authority · Scotland
Incumbent: Field Geospatial AS · Last contest: 2 bids (2 SME)
Shetland Islands Council has contracted for carrying out Light Detection and Ranging (LiDAR) mapping of the entirety of Shetland, its islands and all inland areas, extending down to the inter-tidal zone. the Council requires: 1. Terrestrial…
- Published value
- £207k
- Annual run-rate
- —start date not published
- Term
- Estimated end 7 Mar 2027 · start not published
- Reference
ocds-h6vhtk-05ef81
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,285 contracts and agreements end within 24 months, 3,292 in total · £790m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.