Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 571–585
- Estimated end · in 140 daysDynamic purchasing system record
4 year Framework Agreement for the provision of Mechanical & Electrical Engineering services for new build housing
Link Group Ltd · Scotland
Incumbent: Hulley and Kirkwood
- Published value
- £15mpublished ceiling for the whole dynamic purchasing system
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 16 Mar 2027 · start not published
- Reference
ocds-h6vhtk-02dfd4
- Estimated end · in 140 daysCall-off
Supply of PE Pipe and Fittings
Scotland Gas Networks (SGN) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 21 bids (6 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 16 Mar 2027 · start not published
- Reference
ocds-h6vhtk-02874b
- Estimated end · in 140 daysCall-off
Supply of PE Pipe and Fittings - A
Scotland Gas Networks (SGN) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 21 bids (6 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 16 Mar 2027 · start not published
- Reference
ocds-h6vhtk-02874b
- Estimated end · in 140 daysCall-off
Supply of PE Pipe and Fittings - B
Scotland Gas Networks (SGN) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 21 bids (6 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 16 Mar 2027 · start not published
- Reference
ocds-h6vhtk-02874b
- Estimated end · in 140 daysCall-off
Thames Valley region
SOUTHERN ELECTRIC POWER DISTRIBUTION PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 16 Mar 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Estimated end · in 141 daysFramework recordPanel · 5 suppliers
Quantity Surveyors Framework for DRC and Insurance Estimates
Historic England · Nationwide (UK)
Panel: Huntly Cartwright, Peter Gunning and Partners, RNJ +2 more
- Published value
- £200kpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 17 Mar 2027 · start not published
- Reference
ocds-h6vhtk-02eea7
- Ends · in 141 days
PCSA Fire and Remedial Devons Road Estate
Peabody Trust Ltd · Other public body
Incumbent: Guildmore Limited (2, 11)
PCSA Fire and Remedial at the Devons Road Estate
- Published value
- £1.6minc. VAT as published
- Annual run-rate
- £1.8mpublished value ÷ term, inc. VAT
- Term
- 30 Apr 2026 → 17 Mar 2027 · 11 months
- Reference
ocds-h6vhtk-06cbcf
- Ends · in 141 days
EICR 5 yearly testing
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: Mosaic Property Management Ltd
EICR 5 yearly testing for NELFT
- Published value
- £31k
- Annual run-rate
- £31kpublished value ÷ term, exc. VAT
- Term
- 18 Mar 2026 → 17 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-066fc8
- Ends · in 142 days
CS055187
University of Exeter · Central government
Incumbent: Avalon Planning and Heritage
to provide professional planning advice and support for the discharge of planning conditions placed by Exeter City Council on the Planning Approval for the Al Qasimi building.
- Published value
- £28k
- Annual run-rate
- £28kpublished value ÷ term, exc. VAT
- Term
- 18 Mar 2026 → 18 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-068eba
- Ends · in 142 days
Support for the Cambridgeshire South Care Partnership
Cambridge University Hospitals NHS Foundation Trust · Central government · East of England
Incumbent: NHS Property Services Limited
1274 - Support for the Cambridgeshire South Care Partnership to provide evidence into the emerging Greater Cambridgeshire Local Plan Infrastructure Delivery Plan (IDP).
- Published value
- £26k
- Annual run-rate
- £26kpublished value ÷ term, exc. VAT
- Term
- 19 Mar 2026 → 18 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-066ed4
- Ends · in 143 days
Examination of the Portsmouth Local Plan
Portsmouth City Council · Local authority · South East England
Incumbent: The Planning Inspectorate
Examination of the Portsmouth Local Plan - Planning Inspectorate
- Published value
- £100kinc. VAT as published
- Annual run-rate
- £94kpublished value ÷ term, inc. VAT
- Term
- 26 Feb 2026 → 19 Mar 2027 · 1.1 yrs
- Reference
ocds-h6vhtk-066706
- Ends · in 143 days
BREEAM In-Use Pilot
Ministry of Justice · Central government · Nationwide (UK)
Incumbent: Building Research Establishment Ltd
A BREEAM In-Use feasibility pilot study covering two prison sites: HMP Wormwood Scrubs and HMP Bullingdon.
- Published value
- £70k
- Annual run-rate
- £137kpublished value ÷ term, exc. VAT
- Term
- 14 Sept 2026 → 19 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-078151
- Ends · in 143 days
– (MEP Consultancy for PET CT Installation)
Imperial College Healthcare NHS Trust · Central government
Incumbent: Eta Projects Limited
MEP consultancy services for the installation of a second PET CT scanner, including conversion of existing hospital spaces at CXH
- Published value
- £36k
- Annual run-rate
- £41kpublished value ÷ term, exc. VAT
- Term
- 4 May 2026 → 19 Mar 2027 · 11 months
- Reference
ocds-h6vhtk-06bc60
- Ends · in 143 days
Analysis of Soil Samples for Natural England's Long Term Monitoring Network 2026-2027
NATURAL ENGLAND (Defra Network eTendering Portal) · Central government · Nationwide (UK)
Incumbent: James Hutton Limited · Last contest: awarded 19% under the estimate
This contract comprises laboratory analysis of soil samples collected from four of Natural England's Long Term Monitoring sites. Analyses required include a range of physio-chemical and biological soil parameters to enable interpretation of…
- Published value
- £26k
- Annual run-rate
- £49kpublished value ÷ term, exc. VAT
- Term
- 9 Sept 2026 → 19 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-06e0b5
- Estimated end · in 144 days
The Provision of an Adventure Activity Licensing Authority
Health and Safety Executive · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Adventure Risk Management Services Ltd · Last contest: 1 bid · awarded 55% under the estimate
The Health and Safety Executive (HSE) is the independent regulator of health and safety and is sponsored by the Department of Work and Pensions (DWP). HSE is designated as the Adventure Activities Licensing Authority (AALA) in GB. The Adven…
- Published value
- £1.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 20 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04b4c1
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,285 contracts and agreements end within 24 months, 3,292 in total · £790m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.