Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 601–615
- Ends · in 48 days
City Hall Accessibility Main Contractor
Norwich City Council · Local authority · East of England
Incumbent: ND WILLAN BUILDING CONTRACTORS LTD
Accessibility improvement works to City Hall, Norwich, including an external access ramp, internal access lift, automatic entrance doors, accessible toilet facilities and associated building alterations.
- Published value
- £350k
- Annual run-rate
- —term under 6 months
- Term
- 30 Aug 2026 → 14 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-07835b
- Ends · in 48 days
AM 432 Arfon & Dwyfor - Solar PV's ORP - 32 properties
Adra (Tai) Cyf · Other public body · Wales (Cymru)
Incumbent: MENAI HEATING LIMITED
Award notice for the contract AM 432 Arfon & Dwyfor - Solar PV's ORP - 32 properties
- Published value
- £179k
- Annual run-rate
- —term under 6 months
- Term
- 23 Sept 2026 → 14 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-077aae
- Ends · in 48 days
Supply and Installation of Windows and Doors
Greensquareaccord · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: WILTSHIRE GLASS & GLAZING LTD
Supply and Installation of composite doors and UPVC windows across GSA localities 3 and 4
- Published value
- £168k
- Annual run-rate
- £168kpublished value ÷ term, exc. VAT
- Term
- 15 Dec 2025 → 14 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-068125
- Ends · in 48 days
Access & Rescue Relocation - Drill Tower Alterations
Devon and Somerset Fire and Rescue Authority · Police & fire · South West England
Incumbent: KENEX ENGINEERING LTD
**THIS IS A UK7 CONTRACTS DETAILS NOTICE** The Authority has awarded a contract to undertake alterations to the existing drill tower at its Urban Search and Rescue (USAR) facility, at its Service Headquarters site in Exeter, to improve serv…
- Published value
- £111k
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 14 Dec 2026 · 2 months
- Reference
ocds-h6vhtk-06ee8e
- Ends · in 48 days
Contract for the Execution of Groundworks and Drainage, Sketty, Swansea
City & County of Swansea · Local authority · Wales (Cymru)
Incumbent: Algar groundworks · Last contest: awarded 25% under the estimate
Contract for the Execution of Groundworks and Drainage, Sketty, Swansea
Re-procurement openContract for the Execution of Fire Safety Works · bids close
- Published value
- £64k
- Annual run-rate
- £95kpublished value ÷ term, exc. VAT
- Term
- 15 Apr 2026 → 14 Dec 2026 · 8 months
- Reference
ocds-h6vhtk-064f1c
- Ends · in 48 days
DCC street lighting asbestos removal
Derbyshire County Council · Local authority · East Midlands
Incumbent: Bardon Environmental Limited
Last year it was identified some cast iron street lighting columns contain asbestos rope in the aperture, we have completed a trial day to ascertain the time it takes to remove the asbestos and how many in a day, using this data and the num…
- Published value
- £45k
- Annual run-rate
- £69kpublished value ÷ term, exc. VAT
- Term
- 20 Apr 2026 → 14 Dec 2026 · 8 months
- Reference
ocds-h6vhtk-0685da
- Ends · in 48 days
CSP26860 - R26 courtyard works
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: DH Building Services Oxford Ltd
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. Contract details notice for the completion of works R26 levelling of service…
- Published value
- £23k
- Annual run-rate
- —term under 6 months
- Term
- 17 Sept 2026 → 14 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-07746c
- Ends · in 49 days
2364 Spalding Active Travel
Lincolnshire County Council · Local authority · East Midlands
Incumbent: C R Reynolds Ltd
The project consists of improving the cycling and walking infrastructure along Pinchbeck Road between Kings Road and Enterprise Way in Spalding. The project also contains resurfacing along the full length of the works. There will be a signa…
- Published value
- £3.7minc. VAT as published
- Annual run-rate
- £7.3mpublished value ÷ term, inc. VAT
- Term
- 15 Jun 2026 → 15 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06cb89
- Ends · in 49 days
ENHT - Renal Home Therapies Refurbishment - Ventilation
East and North Hertfordshire Teaching NHS Trust · Central government
Incumbent: PARIAS CONSTRUCTIOPARIAS CONSTRUCTION & INTERIORS LIMITED
ENHT - Renal Home Therapies Refurbishment - Ventilation. procured via Tender.
- Published value
- £1.9m
- Annual run-rate
- —term under 6 months
- Term
- 16 Sept 2026 → 15 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-07744c
- Ends · in 49 days
Kilburn Library Re-Imagined Main Works
London Borough of Camden · Local authority · Greater London
Incumbent: Quinn (London) Limited
Works contract to undertake a full retrofit of the building across all floors, basement, ground and mezzanine level at Kilburn Library
- Published value
- £1.4m
- Annual run-rate
- —term under 6 months
- Term
- 6 Jul 2026 → 15 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-06b4f2
- Ends · in 49 days
East Locality - Berwick Hills Library - Conversion Works
Middlesbrough Council · Local authority · North East England
Incumbent: Tom Willoughby Ltd
Strip and full refurbishment of an existing unit previously used as a local library, adapting to provide new "Locality HUB for joint Council services" including all new finishes, new M & E installation and associated external works.
- Published value
- £986k
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 15 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06eea4
- Ends · in 49 days
Garden Clearances & Fencing (short-term contract)
Rooftop Housing Group · Housing · West Midlands
Incumbent: APM TREES LIMITED
Rooftop Housing Association Limited have awarded a short-term contract to APM Trees Limited, instructing them to carry out garden clearance works and install approximately 187 metres of rear garden fencing. The works are necessary and urgen…
- Published value
- £43k
- Annual run-rate
- —term under 6 months
- Term
- 16 Sept 2026 → 15 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-07738f
- Ends · in 49 days
Guttering works at Charles Lister Court
Housing 21 · Central government · South East England
Incumbent: HGT Construction Ltd
Guttering works at Charles Lister Court (Housing 21).
- Published value
- £38k
- Annual run-rate
- —term under 6 months
- Term
- 15 Oct 2026 → 15 Dec 2026 · 2 months
- Reference
ocds-h6vhtk-07891d
- Ends · in 49 days
Block 6 Refurb
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: Sword Logistics
Extended to cover 2026 Months Prelims 1 Skips 1.25 H&S, F10 Coordinator 1 Toilet 1.25 Management 1.25 Labour & Cleaning 1 Consumble 1 Fencing
- Published value
- £17k
- Annual run-rate
- £17kpublished value ÷ term, exc. VAT
- Term
- 16 Dec 2025 → 15 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-05faa8
- Estimated end · in 50 daysFramework recordPanel · 9 suppliers
Building Fabric Maintenance and Minor Works Framework Agreement
University of Leicester · Education · East Midlands
Panel: Brown & Shaw (Builders) Ltd, Brown and Kirby Ltd, C. Henry & Sons Limited +6 more
- Published value
- £28mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 16 Dec 2026 · start not published
- Reference
ocds-h6vhtk-035414
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.