Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 616–630
- Ends · in 154 days
Marlborough - Lead Design
Plymouth Community Homes · Other public body · South West England
Incumbent: BUILDING DESIGN PARTNERSHIP LTD
Marlborough House - Lead Designer/Architect
- Published value
- £186k
- Annual run-rate
- £170kpublished value ÷ term, exc. VAT
- Term
- 24 Feb 2026 → 30 Mar 2027 · 1.1 yrs
- Reference
ocds-h6vhtk-064d02
- Ends · in 154 days
Carlisle Masterplan
Cumberland Council · Local authority · North West England
Incumbent: Mott MacDonald
Additional professional services for the Carlisle Masterplan Project.
- Published value
- £76k
- Annual run-rate
- £110kpublished value ÷ term, exc. VAT
- Term
- 20 Jul 2026 → 30 Mar 2027 · 8 months
- Reference
ocds-h6vhtk-06e4d7
- Ends · in 154 daysExtension option · up to 30 Mar 2028
CBC-1861-Q-AS RICS Valuation Services
Central Bedfordshire Council · Local authority
Incumbent: SRP Property Consultancy Ltd
We require RICS market sales and rental valuations reports for newly acquired properties (or those about to be acquired), of up to 100 per year (although this is not guaranteed). All properties are within Central Bedfordshire and can range …
- Published value
- £70kinc. VAT as published
- Annual run-rate
- £70kpublished value ÷ term, inc. VAT
- Term
- 31 Mar 2026 → 30 Mar 2027 · 1 yr · up to 30 Mar 2028 with extensions
- Reference
ocds-h6vhtk-0659d8
- Ends · in 154 days
RSFT Surrey Roof Upgrade Works
Royal Surrey County Hospital NHS Foundation Trust · Central government · South East England
Incumbent: DHP Building Design Consultancy
Provision of additional services regarding Roof Upgrade Works
- Published value
- £36k
- Annual run-rate
- £36kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 30 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-067bd6
- Ends · in 154 days
NHS.net Tenant Gap Analysis
Somerset NHS Foundation Trust · Central government · South West England
Incumbent: TRUSTED TECHNOLOGY PARTNERSHIP LTD
NHS.net Tenant Gap Analysis SERVICE
- Published value
- £31k
- Annual run-rate
- £34kpublished value ÷ term, exc. VAT
- Term
- 1 May 2026 → 30 Mar 2027 · 11 months
- Reference
ocds-h6vhtk-0694ad
- Ends · in 155 daysFramework record
Construction Works and Associated Services 2 / Procure 23 (CWAS2/P23)
Crown Commercial Service · Central government · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published
- Published value
- £30bnpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-02caf6
- Ends · in 155 days
UK Pavilion at Expo 2025 Osaka - Design, Build, Maintain & Decommission (DBMD)
Department for Business & Trade · Central government · Nationwide (UK)
Incumbent: ES Global · Last contest: 5 bids · awarded at the estimate
The United Kingdom (UK) is participating in Expo 2025, which runs from 13 April 2025 - 13 October 2025 and will take place in Osaka, Japan. The overarching theme of Expo 2025 is "Designing Future Society for Our Lives". Expo will welcome vi…
- Published value
- £24m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03c55d
- Ends · in 155 days
2023 Highways Structures Services Term Contract
Worcestershire County Council · Local authority · West Midlands
Incumbent: Jacobs UK Ltd · Last contest: 1 bid (0 SME) · awarded at the estimate
Worcestershire County Council professional services for annual highway structures management service contract, with the potential for Associated ServicesWork involves municipal, highways and transportation engineering, surveys and inspectio…
- Published value
- £10m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-02f647
- Ends · in 155 days
Farm Advisory Service One to One
Scottish Government · Scotland
Incumbent: Ricardo AEA Ltd · Last contest: 1 bid (0 SME)
Provision of a Farm Advisory Service (FAS) which consists of 2 separate Lots. Lot 1 will be for FAS One to Many and Lot 2 will be for FAS One to One
- Published value
- £6.3m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03df6b
- Ends · in 155 daysFramework recordPanel · 4 suppliers
Electrical Installation Condition Report Programme and Rewires 2022 - 2025
Beyond Housing Limited · North East England
Panel: Complete Electrical UK Ltd, Lantei Ltd, SS Testing Ltd +1 more
- Published value
- £5.6mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-030219
- Ends · in 155 days
Lot 2 Wales Only CEFA Structures Examinations - Framework Year 1
NETWORK RAIL INFRASTRUCTURE LIMITED · Central government · Greater London, South West England, Wales (Cymru)
Incumbent: Ground Control Limited
Civils examinations within Network Rail refer to the inspection, examination and reporting of structural assets to ensure the safety, reliability, and longevity of railway infrastructure. These examinations help identify defects, monitor st…
- Published value
- £3.7m
- Annual run-rate
- £5.6mpublished value ÷ term, exc. VAT
- Term
- 7 Aug 2026 → 31 Mar 2027 · 8 months
- Reference
ocds-h6vhtk-06dd7a
- Ends · in 155 daysExtension option · up to 31 Mar 2028
HNB - Provision of Site Delivery, Engineering Services & Boiler Asset Integrity Mgt Segment
Nuclear Restoration Services Limited · Other public body
Incumbent: Altrad Babcock Limited
Provision of Site Delivery, Engineering Services & Boiler Asset Integrity Management Segment at Hunterston B
- Published value
- £2.7m
- Annual run-rate
- £2.7mpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 31 Mar 2027 · 1 yr · up to 31 Mar 2028 with extensions
- Reference
ocds-h6vhtk-0602ec
- Ends · in 155 daysLinked to a framework or DPS
PHASE 1 AND 2 GEOENVIRONMENTAL SURVEY FRAMEWORK 2023 - 2027
Sheffield City Council · Local authority · Yorkshire and the Humber
Incumbent: RPS Consulting Services Ltd · Last contest: 5 bids
The contract covers Phase 1 and Phase 2 Geo-Environmental Surveys and associated ancillary surveys for a variety of sites across the Sheffield City Region.
- Published value
- £2.2mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-036309
- Ends · in 155 daysLinked to a framework or DPS
PHASE 1 AND 2 GEOENVIRONMENTAL SURVEY FRAMEWORK 2023 - 2027
Sheffield City Council · Local authority · Yorkshire and the Humber
Incumbent: Concept Engineering Consultants · Last contest: 5 bids
The contract covers Phase 1 and Phase 2 Geo-Environmental Surveys and associated ancillary surveys for a variety of sites across the Sheffield City Region.
- Published value
- £2.2mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-036309
- Ends · in 155 daysExtension option · up to 31 Dec 2027
Structural Engineer LSW and Stretton Mill
Cheshire west and Chester Borough Council · Local authority · North West England
Incumbent: Ramboll UK Limited
Specialist Structural Engineer for Heritage sites at Lion Salt Works and Stretton Water Mill
- Published value
- £1.0minc. VAT as published
- Annual run-rate
- £576kpublished value ÷ term, inc. VAT
- Term
- 23 Jun 2025 → 31 Mar 2027 · 1.8 yrs · up to 31 Dec 2027 with extensions
- Reference
ocds-h6vhtk-055013
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,285 contracts and agreements end within 24 months, 3,292 in total · £790m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.