Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 706–720

  1. Ends · in 65 daysFramework record

    Framework Agreement for the delivery of Countryside Services and Works

    Durham County Council · Local authority · North East England

    Incumbent: Seymour Civil Engineering Contractors Limited

    • Siteworks
    Published value
    £3.0mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 31 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-037deb
  2. Ends · in 65 days

    Appointment of Building Contractor for Levelling Up Project at Malvern Theatre, Grange Road, Malvern

    Malvern Hills District Council · Local authority · West Midlands

    Incumbent: Speller Metcalfe Malvern Limited · Last contest: 1 bid (0 SME)

    Malvern Hills District Council is looking to appoint a Building Contractor for Levelling Up Funded Project at Malvern Theatre, Grange Road Malvern.

    • Construction work for buildings relating to leisure, sports, culture, lodging and restaurants
    Published value
    £2.2m
    Annual run-rate
    —start date not published
    Term
    Ends 31 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-04b1fa
  3. Ends · in 65 days

    Cyclical Decorations Programme (Leaseholders)

    VIVID Housing Ltd · Other public body · South East England, South West England

    Incumbent: IAN WILLIAMS · Last contest: awarded at the estimate

    Cyclical decorations, minor repairs and communal flooring replacement across VIVID's leaseholder properties.

    Published value
    £850k
    Annual run-rate
    £1.5mpublished value ÷ term, exc. VAT
    Term
    5 Jun 2026 → 31 Dec 2026 · 7 months
    Reference
    ocds-h6vhtk-05db24
  4. Ends · in 65 days

    TWBC - Benhall Mill Road Parks Depot

    Tunbridge Wells Borough Council · Local authority · South East England

    Incumbent: AMMCASS CONSTRUCTION ENGINEERING GROUP LIMITED · Last contest: awarded at the estimate

    Tunbridge Wells Borough Council (TWBC) is looking to complete the refurbishment of the existing crematorium depot building and construction of a new garage for the housing of machinery, in accordance with the design information contained in…

    Published value
    £638kinc. VAT as published
    Annual run-rate
    —not computed
    Term
    14 Jul 2026 → 31 Dec 2026 · 6 months
    Reference
    ocds-h6vhtk-05fd40
  5. Ends · in 65 days

    Replacement of Communal Doors & Obsolete Door Entry Systems

    CALICO HOMES LIMITED · Other public body · North West England

    Incumbent: Security Surveillance Systems Ltd (T/A SS Group Ltd)

    The provision of 46 replacement communal doors and 64 obsolete door entry systems for Calico Homes. The programme will improve safety, security and operational control within communal areas.

    Published value
    £597kinc. VAT as published
    Annual run-rate
    £1.2mpublished value ÷ term, inc. VAT
    Term
    1 Jul 2026 → 31 Dec 2026 · 6 months
    Reference
    ocds-h6vhtk-078e8e
  6. Ends · in 65 days

    Mount Edgcumbe Garden Battery Refurbishment

    Plymouth City Council · Local authority · South West England

    Incumbent: TEC CONSTRUCTION (HOLDINGS) LTD

    Refurbishment and renovation of Mount Edgcumbe Garden Battery and associated works

    Published value
    £589k
    Annual run-rate
    —not computed
    Term
    6 Jul 2026 → 31 Dec 2026 · 6 months
    Reference
    ocds-h6vhtk-06ccde
  7. Ends · in 65 days

    Midland Metro Limited (MML) - Low-level Surfacing Works at Winson Green LR030

    West Midlands Combined Authority · Local authority · West Midlands

    Incumbent: Haigh Rail Limited

    Midland Metro Limited (MML) are are awarding a Works Contract for the Provision of Low-Level Surfacing Works at Winson Green Tram Stop under a Call-Off Order utilising the MML Single Supplier Track Framework Agreement.

    Published value
    £545k
    Annual run-rate
    £573kpublished value ÷ term, exc. VAT
    Term
    19 Jan 2026 → 31 Dec 2026 · 11 months
    Reference
    ocds-h6vhtk-066411
  8. Ends · in 65 days

    UKRI-6336 - Fire Stopping and Fire Door Remedials

    UK Research and Innovation · Central government · Nationwide (UK)

    Incumbent: Airport Facilities (Maintenance) Ltd

    The Provision of Fire Stopping and Fire Door Remedials

    Published value
    £500k
    Annual run-rate
    —term under 6 months
    Term
    15 Oct 2026 → 31 Dec 2026 · 3 months
    Reference
    ocds-h6vhtk-077f23
  9. Ends · in 65 days

    Construction of a cemetery extension

    Bracknell Forest Council · Local authority · South East England

    Incumbent: White Horse Contracting Ltd · Last contest: awarded 13% under the estimate

    To provide works to convert land currently laid out for golf purposes in to a suitable cemetery, including all relevant ground works, roads, footpaths, planting, access/egress and associated requirements as per the instructions laid out wit…

    Published value
    £433k
    Annual run-rate
    —not computed
    Term
    13 Jul 2026 → 31 Dec 2026 · 6 months
    Reference
    ocds-h6vhtk-06140d
  10. Ends · in 65 days

    NUN – Lot 1 Coronation Walk Lot 2 Sandon Park footpath/cycleway

    Nuneaton and Bedworth Borough Council · Local authority · West Midlands

    Incumbent: Ground Control Limited

    Nuneaton and Bedworth Borough Council’s Parks and Greenspace team have a remit to improve and maintain play and recreation facilities throughout the Borough.Utilising capital budgets these Green Spaces will receive tarmacked footpath/cyclew…

    Published value
    £427k
    Annual run-rate
    £536kpublished value ÷ term, exc. VAT
    Term
    16 Mar 2026 → 31 Dec 2026 · 10 months
    Reference
    ocds-h6vhtk-0594a0
  11. Ends · in 65 days

    Darrenlas Primary WC Refurb 2026

    Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)

    Incumbent: V3 Facilities Management Limited

    Darrenlas Primary WC Refurb 2026

    Published value
    £395k
    Annual run-rate
    £703kpublished value ÷ term, exc. VAT
    Term
    10 Jun 2026 → 31 Dec 2026 · 7 months
    Reference
    ocds-h6vhtk-06b451
  12. Ends · in 65 days

    Fire Strategy Improvements - Batch 17

    Bath & North East Somerset Council · Local authority · South West England

    Incumbent: NKS Contracts Limited

    The Provision of Fire Strategy Improvements for 17no. Batch D Properties. Tendered sum ££369,445.26 exc vat

    Published value
    £369k
    Annual run-rate
    —term under 6 months
    Term
    3 Aug 2026 → 31 Dec 2026 · 5 months
    Reference
    ocds-h6vhtk-06e4bc
  13. Ends · in 65 days

    St Day & Carharrack Community School - SEND Programme

    Cornwall Council · Local authority · Nationwide (UK)

    Incumbent: Cygnus Contracting Ltd

    St Day & Carharrack Community School - SEND Expansion Programme 2026

    Published value
    £354k
    Annual run-rate
    —term under 6 months
    Term
    19 Aug 2026 → 31 Dec 2026 · 4 months
    Reference
    ocds-h6vhtk-0781e9
  14. Ends · in 65 days

    PCH Roof Sealant Replacement

    Corporate Officer of the House of Commons · Central government · Greater London

    Incumbent: Saltash Construction

    Repair works to the sealant of the roof in Portcullis House.

    Published value
    £313k
    Annual run-rate
    £407kpublished value ÷ term, exc. VAT
    Term
    26 Mar 2026 → 31 Dec 2026 · 9 months
    Reference
    ocds-h6vhtk-068527
  15. Ends · in 65 days

    Tillingbourne to Good (Shalford Mill fish passage)

    ENVIRONMENT AGENCY · Other public body · South East England

    Incumbent: Environment Agency

    The improvement of fish passage along the Tillingbourne river corridor.

    Published value
    £300k
    Annual run-rate
    £368kpublished value ÷ term, exc. VAT
    Term
    9 Mar 2026 → 31 Dec 2026 · 10 months
    Reference
    ocds-h6vhtk-068fd3

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.