Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 41–50
- Ends · in 3 days
Egerton & Dunscar Decarbonisation Phase 2 at Egerton & Dunscar
NHS Property Services Limited · NHS & health
Incumbent: NU CONSTRUCTION LIMITED
Decarbonisation Phase 2 at Egerton & Dunscar
- Published value
- £313k
- Annual run-rate
- —term under 6 months
- Term
- 24 Aug 2026 → 30 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06db88
- Ends · in 3 days
Stockton on the Forest Primary School Kitchen refurbishment and intervention room creation 2026
City of York Council · Local authority · Yorkshire and the Humber
Incumbent: HOBSON AND PORTER LIMITED · Last contest: awarded 14% over the estimate
City of York Council wish to procure a Stockton on the Forest Primary School Kitchen refurbishment and intervention room creation 2026
- Published value
- £302k
- Annual run-rate
- —term under 6 months
- Term
- 20 Jul 2026 → 30 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-0670b6
- Ends · in 3 days
Aldworth School Boiler Efficiency Upgrades Portsmouth Block
Hampshire County Council · Local authority · South East England
Incumbent: MKG Building Services Ltd
Portsmouth Block - Boiler Replacement. The scheme comprises of the design and construction of the replacement of the existing gas fired boiler plant at The Blue Coat School, Basingstoke ( Formally Aldworth School).
- Published value
- £284k
- Annual run-rate
- —term under 6 months
- Term
- 24 Aug 2026 → 30 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06e792
- Ends · in 3 days
YG Rhydywaun - Curtain Wall Replacement
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: GKR MAINTENANCE & BUILDING CO. LTD
YG Rhydywaun - Curtain Wall Replacement 2026
- Published value
- £265k
- Annual run-rate
- —term under 6 months
- Term
- 17 Jul 2026 → 30 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06d4e6
- Ends · in 3 days
Remodelling and Refurbishment Works to the Silverthorn Centre UMF Scheme
NHS Property Services Limited · NHS & health
Incumbent: Beardwell Construction Limited
Contract for Remodelling and Refurbishment Works to the Silverthorn Centre UMF Scheme
- Published value
- £222k
- Annual run-rate
- —term under 6 months
- Term
- 7 Sept 2026 → 30 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06ebcb
- Ends · in 3 days
Sellincourt Primary School, Boiler Replacement Project
London Borough of Wandsworth · Local authority
Incumbent: Invicta Building Services Limited
Sellincourt Primary School, Design and replacement of Boilers, Wandsworth, SW17
- Published value
- £222k
- Annual run-rate
- —term under 6 months
- Term
- 10 Aug 2026 → 30 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06e426
- Ends · in 3 days
Contract for Removal, Disposal & Renewal of UPVC Windows & Composite Door
City & County of Swansea · Local authority · Nationwide (UK), Wales (Cymru)
Incumbent: Anglian Windows Limited · Last contest: awarded 4% over the estimate
Contract for Removal, Disposal & Renewal of UPVC Windows & Composite Doors at West Cross, Swansea
- Published value
- £218k
- Annual run-rate
- —term under 6 months
- Term
- 14 Oct 2026 → 30 Oct 2026 · 17 days
- Reference
ocds-h6vhtk-06a102
- Ends · in 3 days
Roof coverings replacement and internal works at Ridley House
NHS Property Services Limited · NHS & health
Incumbent: LIVECO LIMITED
Roof coverings replacement and internal works at Ridley House
- Published value
- £211k
- Annual run-rate
- —term under 6 months
- Term
- 24 Aug 2026 → 30 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06dadf
- Ends · in 3 days
Ferndale Community School - Removal of Skylights and Re-roof Sports Barn
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: Cladright Ind Roofing and Cladding Ltd
Ferndale Community School - Removal of Skylights and Re-roof Sports Barn 2026
- Published value
- £209k
- Annual run-rate
- —term under 6 months
- Term
- 17 Jul 2026 → 30 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06d8ac
- Ends · in 3 days
Specialist Surface Treatment Works 26/27
Barnsley Metropolitan Borough Council · Local authority · Yorkshire and the Humber
Incumbent: Colas Limited
Retread Recycling works for the year 2026/27. This process is an alternative to conventional recycling in which the existing surface is recycled and re-laid to a new profile.
- Published value
- £202k
- Annual run-rate
- —term under 6 months
- Term
- 8 Sept 2026 → 30 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06ec4a
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.