Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 61–75
- Ends · in 5 days
SDEC Expansion / Therapy Services Relocation QS Fee bid
Mid Yorkshire Hospitals NHS Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: DAVID SLATER ASSOCIATES
Provide Quantity Surveyor / Cost Advisor support for the above scheme as per the recent competitive tender process
- Published value
- £32k
- Annual run-rate
- £23kpublished value ÷ term, exc. VAT
- Term
- 18 Jun 2025 → 1 Nov 2026 · 1.3 yrs
- Reference
ocds-h6vhtk-056a31
- Ends · in 5 days
Quantity Surveyor and Project Lead Package for Office Conversions.
Great Yarmouth Borough Council · Local authority · East of England
Incumbent: AECOM LIMITED
Quantity Surveyor and Project Lead Package Office Conversions at the value of £29,350 provided by Aecom Ltd.
- Published value
- £29k
- Annual run-rate
- £23kpublished value ÷ term, exc. VAT
- Term
- 15 Jul 2025 → 1 Nov 2026 · 1.3 yrs
- Reference
ocds-h6vhtk-061189
- Ends · in 5 days
Doncaster City Centre Green Infrastructure and Active Design Policy
City of Doncaster Council · Local authority · Yorkshire and the Humber
Incumbent: LUC
Consultancy work to develop the above named policy. Promotes a greener, healthier Doncaster by integrating green infrastructure and active design into urban planning, enhancing biodiversity, connectivity, and community wellbeing in the city…
- Published value
- £27k
- Annual run-rate
- £27kpublished value ÷ term, exc. VAT
- Term
- 1 Nov 2025 → 1 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-05d2a2
- Estimated end · in 6 daysFramework recordPanel · 3 suppliers
Multi-supplier Framework Agreement for proposed utility diversions and/or protection audit and advice services
Transport Scotland · Scotland
Panel: Allen Gordon, Long O Donnell Associates Limited, Mott MacDonald
- Published value
- £1.8mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 2 Nov 2026 · start not published
- Reference
ocds-h6vhtk-02eee5
- Ends · in 7 days
Office for Product Safety and Standards - Eco Design Testing for Washing Machines
Department for Business & Trade · Central government · Nationwide (UK)
Incumbent: SGS United Kingdom Limited
Testing of Washing Machines obtained from the UK market to assess efficiency and compliance with designated eco-design and energy labelling standards.
- Published value
- £112k
- Annual run-rate
- £113kpublished value ÷ term, exc. VAT
- Term
- 7 Nov 2025 → 3 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-05e151
- Ends · in 7 days
UE261081RL
University of Exeter · Central government
Incumbent: Ronald Kessler
Provide remote consultation for design implementation and interpretation of machine-learning data analyses via series of remote meetings of 1-2hrs each for maximum 18 hours from Nov 2025 to March 2026
- Published value
- US$37,195
- Annual run-rate
- —not a GBP value
- Term
- 5 Nov 2025 → 3 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-068e27
- Ends · in 7 days
Drainage Infrastructure Review
Mersey and West Lancashire Teaching Hospital NHS Trust · Central government
Incumbent: Gilling Dod Limited
Provide architecture design services for a review of the existing drainage infrastructure at Southport District General Hospital.
- Published value
- £16k
- Annual run-rate
- —term under 6 months
- Term
- 4 Aug 2026 → 3 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-06df06
- Estimated end · in 8 daysFramework recordPanel · 3 suppliers
Highways and Transport Services Framework
London Borough of Lewisham · Local authority · Greater London
Panel: Norman Rourke, Project Centre Limited, Waterman Infrastructure & Environment Ltd
This is an award notice and this opportunity is now closed. This framework will cover Transport and Engineering services. Three suppliers have been awarded onto the framework.
- Published value
- £2.0mlargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 4 Nov 2026 · start not published
- Reference
ocds-h6vhtk-031fdf
- Estimated end · in 8 days
Estates: Cost Manager for Madras New College Building
University of St Andrews · Education · Scotland
Incumbent: CURRIE and BROWN UK LIMITED · Last contest: 5 bids (5 SME)
Cost Manager Services for Madras New College Building at the University of St Andrews.
- Published value
- £451k
- Annual run-rate
- —start date not published
- Term
- Estimated end 4 Nov 2026 · start not published
- Reference
ocds-h6vhtk-03dd37
- Estimated end · in 8 days
TD1788 - Fire Risk Assessment Services
Derby City Council · Local authority · East Midlands
Incumbent: International Fire Consultants Limited · Last contest: 10 bids · awarded at the estimate
Derby City Council is undertaking this procurement to establish a contract for fire risk assessment services.
- Published value
- £195k
- Annual run-rate
- —start date not published
- Term
- Estimated end 4 Nov 2026 · start not published
- Reference
ocds-h6vhtk-02e173
- Ends · in 8 days
Firing Range Project - Fire Consultants
Police, Fire and Crime Commissioner for Staffordshire · Police & fire · Nationwide (UK)
Incumbent: BB7 Consulting Limited
Fire Strategy implementation, inspections and risk assessment for new Firing Range build.
- Published value
- £35k
- Annual run-rate
- £35kpublished value ÷ term, exc. VAT
- Term
- 5 Nov 2025 → 4 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-05fca5
- Estimated end · in 9 days
Health and Safety Management Software System
Abri · Nationwide (UK)
Incumbent: Evotix · Last contest: 4 bids (3 SME) · awarded at the estimate
We are seeking provision of a health and safety management software system to support our health and safety management processes in line with the ISO45001 standard. The system is to be an enterprise-wide solution of modular design and scala…
- Published value
- £195k
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 Nov 2026 · start not published
- Reference
ocds-h6vhtk-02d4ad
- Estimated end · in 9 days
Scottish Health Survey 2026: Provision of a laboratory services for salivary cotinine and anabasine analysis
The Scottish Centre for Social Research (ScotCen) · Scotland
Incumbent: BioApp Solutions Limited · Last contest: 1 bid (1 SME) · awarded 9% under the estimate
The Scottish Centre for Social Research is inviting interested parties to submit a proposal for the provision of Laboratory Services to conduct salivary cotinine and anabasine analysis to support the 2026 Scottish Health Survey (SHeS 2026).…
- Published value
- £74k
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 Nov 2026 · start not published
- Reference
ocds-h6vhtk-05539a
- Estimated end · in 10 days
NI-wide and in the Belfast Metropolitan Transport Plan Area
DfI · Northern Ireland
Incumbent: Atkins Limited · Last contest: 5 bids (0 SME)
DfI wishes to award a contract for Transport Planning and Modelling Managed Services. The contract will be awarded in 2 Lots - Lot 1 NI-wide and in the Belfast Metropolitan Transport Plan Area, Lot 2 - the North West and the Sub-Regional ar…
- Published value
- £6.0m
- Annual run-rate
- —start date not published
- Term
- Estimated end 6 Nov 2026 · start not published
- Reference
ocds-h6vhtk-02da1b
- Estimated end · in 10 days
The North West and the Sub-Regional areas
DfI · Northern Ireland
Incumbent: AECOM LIMITED · Last contest: 5 bids (0 SME)
DfI wishes to award a contract for Transport Planning and Modelling Managed Services. The contract will be awarded in 2 Lots - Lot 1 NI-wide and in the Belfast Metropolitan Transport Plan Area, Lot 2 - the North West and the Sub-Regional ar…
- Published value
- £4.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 6 Nov 2026 · start not published
- Reference
ocds-h6vhtk-02da1b
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,285 contracts and agreements end within 24 months, 3,292 in total · £790m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.