Showing 736–750

  1. Ends · in 65 days

    Contract for the Execution of External Insulation Cladding and Render System, Penlan, Swansea.

    City & County of Swansea · Local authority · Wales (Cymru)

    Incumbent: SAM DRYLINING LIMITED

    To comply with the current WHQS, works will include the application of insulated render system as detailed in the specification/Works Information. The project details are set out in The Contract Data. Site of the Works Phase 2 – Properties …

    Published value
    £150k
    Annual run-rate
    £256kpublished value ÷ term, exc. VAT
    Term
    1 Jun 2026 → 31 Dec 2026 · 7 months
    Reference
    ocds-h6vhtk-06763c
  2. Ends · in 65 days

    Greenbank school 2026

    Cheshire west and Chester Borough Council · Education · North West England

    Incumbent: Skyline Property Solutions Limited

    construction work at Greenbank School, Northwich

    Published value
    £145kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    22 Sept 2026 → 31 Dec 2026 · 3 months
    Reference
    ocds-h6vhtk-077702
  3. Ends · in 65 days

    Contract for Roofing Works

    City & County of Swansea · Local authority · Wales (Cymru)

    Incumbent: Glamorgan Services Limited · Last contest: awarded 2% over the estimate

    Contract for the Execution of Re-roofing of Pitched Roofs to 20 properties at Heol Gwyrosydd, Linsdale Road, Llangrose Road, Morlais Road, Pensalam Road, Eidden Road and Pen Y Mor, Penlan, Swansea.

    Published value
    £143k
    Annual run-rate
    £156kpublished value ÷ term, exc. VAT
    Term
    2 Feb 2026 → 31 Dec 2026 · 11 months
    Reference
    ocds-h6vhtk-052b3b
  4. Ends · in 65 days

    LINAC Room Refurbishment

    Guy's and St Thomas' NHS Foundation Trust · Central government · Greater London

    Incumbent: CFES Ltd

    The Trust has a requirement for a new a medical linear accelerator (LINAC) as part of the Large Medical Equipment Replacement Programme and enabling works are required.

    Published value
    £140k
    Annual run-rate
    £123kpublished value ÷ term, exc. VAT
    Term
    12 Nov 2025 → 31 Dec 2026 · 1.2 yrs
    Reference
    ocds-h6vhtk-066848
  5. Ends · in 65 days

    Fire RA work - Gas and Electric 25/26

    Southern Housing · Other public body · East Midlands, West Midlands, Greater London, South East England, South West England

    Incumbent: BSW Heating Ltd

    Fire risk assessment work - Gas and Electric 25/26

    Published value
    £140kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    21 Sept 2026 → 31 Dec 2026 · 3 months
    Reference
    ocds-h6vhtk-06e374
  6. Ends · in 65 days

    Atrium Replacement and Remedial Works

    Uttlesford District Council · Local authority · East of England

    Incumbent: Evander Glazing and Locks Limited · Last contest: awarded 13% over the estimate

    Uttlesford district Council is seeking to commission remedial/refurbishment works to the glazed atrium at the London Road offices, specifically the atrium over the main entrance linking the Grade II Saffron Walden building with the adjacent…

    Published value
    £138kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    21 Sept 2026 → 31 Dec 2026 · 3 months
    Reference
    ocds-h6vhtk-06b6ba
  7. Ends · in 65 days

    Tender for Phase1River Restoration Works on Lough More Catchment supported by PEACEPLUS CALM

    Armagh City Banbridge and Craigavon Borough Council · Local authority

    Incumbent: ARBOR FOREST MANAGEMENT LTD

    Armagh City, Banbridge and Craigavon Borough Council (“the Council”) invites Tenders from suitably experienced and qualified contractors to carry out river restoration work on the Lough More Catchment south east of Augher village in Co Tyro…

    Published value
    £131kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    5 Sept 2026 → 31 Dec 2026 · 4 months
    Reference
    ocds-h6vhtk-06c79e
  8. Ends · in 65 days

    27425 - Grave Digging for Cemetries

    Plymouth City Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Duchy Cemetery's Ltd

    For digging graves in 3 cemeteries in Plymouth, services commencing 01 February 2025 covering to 31 December 2026. Services to include; - Dig grave, remove surplus soil transported to waste management centre - Cover dug grave with lock down…

    Published value
    £115kinc. VAT as published
    Annual run-rate
    £61kpublished value ÷ term, inc. VAT
    Term
    12 Feb 2025 → 31 Dec 2026 · 1.9 yrs
    Reference
    ocds-h6vhtk-059c73
  9. Ends · in 65 days

    Grave Digging Services 2026

    Plymouth City Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Duchy Cemeteries

    To dig graves to the requirements and the needs of the Bereavement Service and to ensure that the excavation is safe and in line with Health and Safety Standards.

    Published value
    £115k
    Annual run-rate
    £115kpublished value ÷ term, exc. VAT
    Term
    1 Jan 2026 → 31 Dec 2026 · 1 yr
    Reference
    ocds-h6vhtk-065c07
  10. Ends · in 65 days

    Park and Dare Theatre - Cathodic Protection to Existing Masonry

    Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)

    Incumbent: VaultStone Ltd

    Park and Dare Theatre - Cathodic Protection to Existing Masonry 2026

    Published value
    £113k
    Annual run-rate
    £194kpublished value ÷ term, exc. VAT
    Term
    2 Jun 2026 → 31 Dec 2026 · 7 months
    Reference
    ocds-h6vhtk-06ecb0
  11. Ends · in 65 daysExtension option · up to 31 Aug 2029

    Chilton School Boiler Replacement

    Oxfordshire County Council · Local authority · South East England

    Incumbent: CME Heating Ltd

    JCT Minor works contract for the removal and replacement of Boilers at title and associated works and making good.

    Published value
    £110k
    Annual run-rate
    £82kpublished value ÷ term, exc. VAT
    Term
    1 Sept 2025 → 31 Dec 2026 · 1.3 yrs · up to 31 Aug 2029 with extensions
    Reference
    ocds-h6vhtk-065e9d
  12. Ends · in 65 daysExtension option · up to 31 Aug 2029

    Longworth Primary Boiler Replacement

    Oxfordshire County Council · Local authority · South East England

    Incumbent: MECHANICAL INSTALLATION HEATING SERVICES (GLOS) LIMITED

    JCT MW 2024 contract for removal, replacement, associated works and making good of gas boiler heating system at title.

    Published value
    £107k
    Annual run-rate
    £80kpublished value ÷ term, exc. VAT
    Term
    1 Sept 2025 → 31 Dec 2026 · 1.3 yrs · up to 31 Aug 2029 with extensions
    Reference
    ocds-h6vhtk-065ecf
  13. Ends · in 65 days

    Heather Close Refurbishment (Lifts)

    South London and Maudsley NHS Foundation Trust · Central government · Greater London

    Incumbent: Apex Lift & Escalator Engineers Limited

    The No.1 Heather Close Lift has come to its end of life and a replacement of key components are obsolete and required to be replaced for continuous service provision. The Lift replacement would also support the reconfiguration of the buildi…

    Published value
    £105k
    Annual run-rate
    £84kpublished value ÷ term, exc. VAT
    Term
    1 Oct 2025 → 31 Dec 2026 · 1.3 yrs
    Reference
    ocds-h6vhtk-055cf3
  14. Ends · in 65 days

    To complete Flood drying out remediation measure within New Science Building

    University of East Anglia · Education · East of England

    Incumbent: AJS Restoration Services Ltd

    Following a major flood which occurred in the New Science building on UEA campus, a supplier was suggested by the advice of an Insurance Agency to perform the remediation measures and services as a matter of urgency. This was to reduce the …

    Published value
    £100kinc. VAT as published
    Annual run-rate
    £85kpublished value ÷ term, inc. VAT
    Term
    28 Oct 2025 → 31 Dec 2026 · 1.2 yrs
    Reference
    ocds-h6vhtk-05d58d
  15. Ends · in 65 days

    Smart Street Lighting - Network Rail - BAPA

    City of Bradford Metropolitan District Council · Local authority · Yorkshire and the Humber

    Incumbent: Network Rail Infrastructure

    A Basic Asset Protection Agreement (BAPA) with Network Rail in order to remove the Councils lighting columns that run juxtapose to the network rail boundary, line and overheads. Awarded under Schedule 5 para 5 of the Procurement Act

    Published value
    £100k
    Annual run-rate
    £196kpublished value ÷ term, exc. VAT
    Term
    29 Jun 2026 → 31 Dec 2026 · 6 months
    Reference
    ocds-h6vhtk-06bf0a

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.