Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 766–780
- Ends · in 154 days
Bilton Estate, Rugby - Preliminary Environmental Surveys
Clarion Housing Property Development Service Limited · Other public body
Incumbent: Thomson Environmental Services
Provision of Preliminary Environmental Surveys for Bilton Estate, Rugby
- Published value
- £32kinc. VAT as published
- Annual run-rate
- £38kpublished value ÷ term, inc. VAT
- Term
- 1 Jun 2026 → 31 Mar 2027 · 10 months
- Reference
ocds-h6vhtk-078aed
- Ends · in 154 days
Engineer advice for Pressure systems
Mid Cheshire Hospitals NHS Foundation Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Medical Engineering Systems Ltd
Engineer advice for pressure systems - new Leighton Hospital in Crewe
- Published value
- £31k
- Annual run-rate
- £25kpublished value ÷ term, exc. VAT
- Term
- 1 Jan 2026 → 31 Mar 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-050fa0
- Ends · in 154 days
Consultancy Services – HV/LV Electrical Infrastructure Survey and Short-Term Resilience Works, Princess of Wales Hospital
Cwm Taf Morgannwg University Health Board · Central government · Wales (Cymru)
Incumbent: Eta Projects Limited
Cwm Taf Morgannwg University Health Board (CTMUHB) have awarded a Lead Consultant to undertake a comprehensive survey, assessment, and prioritised upgrade plan for the High Voltage (HV) and Low Voltage (LV) electrical infrastructure at the …
- Published value
- £31k
- Annual run-rate
- £31kpublished value ÷ term, exc. VAT
- Term
- 9 Apr 2026 → 31 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-05e49b
- Ends · in 154 days
UKRI-6116 ETC (S Block) Building - Roof Remediation Design
UK Research and Innovation · Central government · North West England
Incumbent: BOWKER SADLER PARTNERSHIP LIMITED
This requirement covers Architectural Design Services in relation to the existing scheme to repair, replace roof coverings on the ETC (S Block) building. The contract is awarded by direct award due to disproportionate technical compatibilit…
- Published value
- £30k
- Annual run-rate
- £38kpublished value ÷ term, exc. VAT
- Term
- 12 Jun 2026 → 31 Mar 2027 · 10 months
- Reference
ocds-h6vhtk-06d58c
- Ends · in 154 days
QS Service for Newington, Faraday Gardens and Burgess Park Under 5s Playgrounds
London Borough of Southwark · Local authority · Greater London
Incumbent: BLAKENEY LEIGH LTD
Southwark Council is seeking to appoint a consultant to provide Quantity Surveyor services for three projects delivering playground design and construction works at Burgess Park Under 5s Playground (Chumleigh St, London SE5 0RN, Appendix A,…
- Published value
- £30k
- Annual run-rate
- £27kpublished value ÷ term, exc. VAT
- Term
- 12 Feb 2026 → 31 Mar 2027 · 1.2 yrs
- Reference
ocds-h6vhtk-064e33
- Ends · in 154 days
Seychelles Forecasting
Met Office · Central government
Incumbent: Seychelles Meteorological Authority
Seychelles ActionFirst support
- Published value
- £30k
- Annual run-rate
- —not computed
- Term
- 6 Oct 2026 → 31 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-078c57
- Ends · in 154 days
City Centre Parking Review 2026
Southampton City Council · Local authority · South East England
Incumbent: Steer Davies & Gleave Ltd
Review of the current City Centre parking supply and demand against projected demand arising from the development in the City Centre Master Plan areas and other activity (e.g. cruise parking).
- Published value
- £30k
- Annual run-rate
- —not computed
- Term
- 1 Oct 2026 → 31 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-077c2e
- Ends · in 154 days
GB-Nottingham: Building Energy Management System (BEMS) 2026-27
Arc Property Services Partnership Limited · Other public body · East Midlands
Incumbent: Integrated Building Management Systems
This contract covers the provision and maintenance of bureau services for Building Energy Management Systems (BEMS) across eleven (11) NCC sites. The appointed supplier, Integrated Building Management Systems, will deliver centralised burea…
- Published value
- £29k
- Annual run-rate
- £29kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 31 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-068f0d
- Ends · in 154 days
Costs to undertaken the Cost Benefit Analysis of the Children & Young Peoples Trauma Informed Care Programme
Humber Teaching NHS Foundation Trust · NHS & health · Yorkshire and the Humber
Incumbent: The Anna Freud Centre
Costs to undertaken the Cost Benefit Analysis of the Children & Young Peoples Trauma Informed Care Programme - as per schedule
- Published value
- £29k
- Annual run-rate
- £53kpublished value ÷ term, exc. VAT
- Term
- 15 Sept 2026 → 31 Mar 2027 · 7 months
- Reference
ocds-h6vhtk-078b1f
- Ends · in 154 days
New Standby Generator M&E Consultancy Fees
Isle of Wight NHS Trust · Central government · South East England
Incumbent: ION Consulting Engineers Ltd
Pre-contract M&E design package up to and including RIBA Stage 4 only associated with a new standby generator for Sub-station A. This is being funded as part of the CDC project.
- Published value
- £28k
- Annual run-rate
- £32kpublished value ÷ term, exc. VAT
- Term
- 16 May 2026 → 31 Mar 2027 · 11 months
- Reference
ocds-h6vhtk-06aa0a
- Ends · in 154 days
GMCA1786 Chemdata Licence
Greater Manchester Combined Authority · Local authority
Incumbent: Ricardo UK Limited
Reliable and interactive chemical hazard database that equips those responding to a chemical incident with critical, relevant and proportionate information to help them stay safe and respond efficiently
- Published value
- £28k
- Annual run-rate
- £28kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 31 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-067fbb
- Ends · in 154 days
Consultancy Services - Refurbishment of Pinewood House Mental Health Facility
Cwm Taf Morgannwg University Health Board · Central government · Wales (Cymru)
Incumbent: Expedite Design Services Limited
Cwm Taf Morgannwg University Health Board (CTMUHB) has awarded a Lead Consultant/Design Team to deliver architectural and associated consultancy services for the refurbishment of areas within Pinewood House, Treorchy. The works will include…
- Published value
- £27k
- Annual run-rate
- £22kpublished value ÷ term, exc. VAT
- Term
- 1 Jan 2026 → 31 Mar 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-05a5d9
- Ends · in 154 days
PAT testing for Somerset FT
Somerset NHS Foundation Trust · Central government · South West England
Incumbent: AWP Services Ltd
Portable electrical appliance PAT testing at Musgrove Park Hospital and Community and Mental Health sites, includes microwaves.
- Published value
- £27k
- Annual run-rate
- £27kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 31 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-06086f
- Ends · in 154 days
Recruitment of Environmental Protection Officer
Lancaster City Council · Local authority
Incumbent: VIVID RESOURCING DIV GV2 RECRUITMENT GRP
Recruitment of Environmental Protection Officer
- Published value
- £26k
- Annual run-rate
- £44kpublished value ÷ term, exc. VAT
- Term
- 24 Aug 2026 → 31 Mar 2027 · 7 months
- Reference
ocds-h6vhtk-06f027
- Ends · in 154 days
Provision of Consultancy for the Climate Emergency & Viability Implications
East Hampshire District Council · Local authority · South East England
Incumbent: Bioregional Development Group · Last contest: awarded 14% under the estimate
Provision of Consultancy for the Climate Emergency & Viability Implications EHDC
- Published value
- £26k
- Annual run-rate
- £19kpublished value ÷ term, exc. VAT
- Term
- 27 Nov 2025 → 31 Mar 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-055fc5
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,296 contracts and agreements end within 24 months, 3,304 in total · £791m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,60979Business services: law, marketing, consulting2,66545Construction work2,10472IT services: consulting, software, internet1,62560Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.