Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 766–780

  1. Ends · in 154 days

    Bilton Estate, Rugby - Preliminary Environmental Surveys

    Clarion Housing Property Development Service Limited · Other public body

    Incumbent: Thomson Environmental Services

    Provision of Preliminary Environmental Surveys for Bilton Estate, Rugby

    Published value
    £32kinc. VAT as published
    Annual run-rate
    £38kpublished value ÷ term, inc. VAT
    Term
    1 Jun 2026 → 31 Mar 2027 · 10 months
    Reference
    ocds-h6vhtk-078aed
  2. Ends · in 154 days

    Engineer advice for Pressure systems

    Mid Cheshire Hospitals NHS Foundation Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Medical Engineering Systems Ltd

    Engineer advice for pressure systems - new Leighton Hospital in Crewe

    Published value
    £31k
    Annual run-rate
    £25kpublished value ÷ term, exc. VAT
    Term
    1 Jan 2026 → 31 Mar 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-050fa0
  3. Ends · in 154 days

    Consultancy Services – HV/LV Electrical Infrastructure Survey and Short-Term Resilience Works, Princess of Wales Hospital

    Cwm Taf Morgannwg University Health Board · Central government · Wales (Cymru)

    Incumbent: Eta Projects Limited

    Cwm Taf Morgannwg University Health Board (CTMUHB) have awarded a Lead Consultant to undertake a comprehensive survey, assessment, and prioritised upgrade plan for the High Voltage (HV) and Low Voltage (LV) electrical infrastructure at the …

    Published value
    £31k
    Annual run-rate
    £31kpublished value ÷ term, exc. VAT
    Term
    9 Apr 2026 → 31 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-05e49b
  4. Ends · in 154 days

    UKRI-6116 ETC (S Block) Building - Roof Remediation Design

    UK Research and Innovation · Central government · North West England

    Incumbent: BOWKER SADLER PARTNERSHIP LIMITED

    This requirement covers Architectural Design Services in relation to the existing scheme to repair, replace roof coverings on the ETC (S Block) building. The contract is awarded by direct award due to disproportionate technical compatibilit…

    Published value
    £30k
    Annual run-rate
    £38kpublished value ÷ term, exc. VAT
    Term
    12 Jun 2026 → 31 Mar 2027 · 10 months
    Reference
    ocds-h6vhtk-06d58c
  5. Ends · in 154 days

    QS Service for Newington, Faraday Gardens and Burgess Park Under 5s Playgrounds

    London Borough of Southwark · Local authority · Greater London

    Incumbent: BLAKENEY LEIGH LTD

    Southwark Council is seeking to appoint a consultant to provide Quantity Surveyor services for three projects delivering playground design and construction works at Burgess Park Under 5s Playground (Chumleigh St, London SE5 0RN, Appendix A,…

    Published value
    £30k
    Annual run-rate
    £27kpublished value ÷ term, exc. VAT
    Term
    12 Feb 2026 → 31 Mar 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-064e33
  6. Ends · in 154 days

    Seychelles Forecasting

    Met Office · Central government

    Incumbent: Seychelles Meteorological Authority

    Seychelles ActionFirst support

    Published value
    £30k
    Annual run-rate
    —not computed
    Term
    6 Oct 2026 → 31 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-078c57
  7. Ends · in 154 days

    City Centre Parking Review 2026

    Southampton City Council · Local authority · South East England

    Incumbent: Steer Davies & Gleave Ltd

    Review of the current City Centre parking supply and demand against projected demand arising from the development in the City Centre Master Plan areas and other activity (e.g. cruise parking).

    Published value
    £30k
    Annual run-rate
    —not computed
    Term
    1 Oct 2026 → 31 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-077c2e
  8. Ends · in 154 days

    GB-Nottingham: Building Energy Management System (BEMS) 2026-27

    Arc Property Services Partnership Limited · Other public body · East Midlands

    Incumbent: Integrated Building Management Systems

    This contract covers the provision and maintenance of bureau services for Building Energy Management Systems (BEMS) across eleven (11) NCC sites. The appointed supplier, Integrated Building Management Systems, will deliver centralised burea…

    Published value
    £29k
    Annual run-rate
    £29kpublished value ÷ term, exc. VAT
    Term
    1 Apr 2026 → 31 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-068f0d
  9. Ends · in 154 days

    Costs to undertaken the Cost Benefit Analysis of the Children & Young Peoples Trauma Informed Care Programme

    Humber Teaching NHS Foundation Trust · NHS & health · Yorkshire and the Humber

    Incumbent: The Anna Freud Centre

    Costs to undertaken the Cost Benefit Analysis of the Children & Young Peoples Trauma Informed Care Programme - as per schedule

    Published value
    £29k
    Annual run-rate
    £53kpublished value ÷ term, exc. VAT
    Term
    15 Sept 2026 → 31 Mar 2027 · 7 months
    Reference
    ocds-h6vhtk-078b1f
  10. Ends · in 154 days

    New Standby Generator M&E Consultancy Fees

    Isle of Wight NHS Trust · Central government · South East England

    Incumbent: ION Consulting Engineers Ltd

    Pre-contract M&E design package up to and including RIBA Stage 4 only associated with a new standby generator for Sub-station A. This is being funded as part of the CDC project.

    Published value
    £28k
    Annual run-rate
    £32kpublished value ÷ term, exc. VAT
    Term
    16 May 2026 → 31 Mar 2027 · 11 months
    Reference
    ocds-h6vhtk-06aa0a
  11. Ends · in 154 days

    GMCA1786 Chemdata Licence

    Greater Manchester Combined Authority · Local authority

    Incumbent: Ricardo UK Limited

    Reliable and interactive chemical hazard database that equips those responding to a chemical incident with critical, relevant and proportionate information to help them stay safe and respond efficiently

    Published value
    £28k
    Annual run-rate
    £28kpublished value ÷ term, exc. VAT
    Term
    1 Apr 2026 → 31 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-067fbb
  12. Ends · in 154 days

    Consultancy Services - Refurbishment of Pinewood House Mental Health Facility

    Cwm Taf Morgannwg University Health Board · Central government · Wales (Cymru)

    Incumbent: Expedite Design Services Limited

    Cwm Taf Morgannwg University Health Board (CTMUHB) has awarded a Lead Consultant/Design Team to deliver architectural and associated consultancy services for the refurbishment of areas within Pinewood House, Treorchy. The works will include…

    Published value
    £27k
    Annual run-rate
    £22kpublished value ÷ term, exc. VAT
    Term
    1 Jan 2026 → 31 Mar 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-05a5d9
  13. Ends · in 154 days

    PAT testing for Somerset FT

    Somerset NHS Foundation Trust · Central government · South West England

    Incumbent: AWP Services Ltd

    Portable electrical appliance PAT testing at Musgrove Park Hospital and Community and Mental Health sites, includes microwaves.

    Published value
    £27k
    Annual run-rate
    £27kpublished value ÷ term, exc. VAT
    Term
    1 Apr 2026 → 31 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-06086f
  14. Ends · in 154 days

    Recruitment of Environmental Protection Officer

    Lancaster City Council · Local authority

    Incumbent: VIVID RESOURCING DIV GV2 RECRUITMENT GRP

    Recruitment of Environmental Protection Officer

    Published value
    £26k
    Annual run-rate
    £44kpublished value ÷ term, exc. VAT
    Term
    24 Aug 2026 → 31 Mar 2027 · 7 months
    Reference
    ocds-h6vhtk-06f027
  15. Ends · in 154 days

    Provision of Consultancy for the Climate Emergency & Viability Implications

    East Hampshire District Council · Local authority · South East England

    Incumbent: Bioregional Development Group · Last contest: awarded 14% under the estimate

    Provision of Consultancy for the Climate Emergency & Viability Implications EHDC

    Published value
    £26k
    Annual run-rate
    £19kpublished value ÷ term, exc. VAT
    Term
    27 Nov 2025 → 31 Mar 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-055fc5

When contracts end · Architectural, construction, engineering
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,296 contracts and agreements end within 24 months, 3,304 in total · £791m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months396
  2. 3–6 months495
  3. 6–12 months530
  4. 12–24 months875

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.