Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 796–810
- Ends · in 64 days
A483 - Bangor Road (Junction 2) and Ruthin Road (Junction 4) Barrier Repairs
Wrexham County Borough Council · Local authority · Wales (Cymru)
Incumbent: Varley & Gulliver (Hill & Smith VRS)
Repair the vehicle restraint systems at Junction 2 and Junction 4 on the A483 in our role as a Partner Authority to the North and Mid Wales Trunk Road Agency (NMWTRA) Direct award in line with WCBC financial regs Contract by PO
- Published value
- £17k
- Annual run-rate
- —term under 6 months
- Term
- 7 Sept 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06e05d
- Ends · in 64 days
Security Fencing - Thorne Moors
NATURAL ENGLAND (Defra Network eTendering Portal) · Central government · Yorkshire and the Humber
Incumbent: BURN FENCING LIMITED · Last contest: awarded 31% under the estimate
Supply and Install 134m of Paladin Fencing and vehicle gates on Thorne Moors, Humberhead Peatlands NNR.
- Published value
- £14k
- Annual run-rate
- —term under 6 months
- Term
- 15 Oct 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-06f771
- Ends · in 64 days
Contract for Woodland Establishment & Maintenance of new woodlands at various sites across County Durham
Durham County Council · Local authority · North East England
Incumbent: Microsite · Last contest: 5 bids
This Contract for Woodland Establishment & Maintenance of new woodlands at various sites across County Durham. Durham County Council is intending to appoint a single provider to carry out the planting of approximately 35,000 mainly broadlea…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Ends 31 Dec 2026 · start not published
- Reference
ocds-h6vhtk-041abf
- Estimated end · in 65 days
Safety Surfacing Installation
Safety Surfacing Installation · East of England
Incumbent: Julian Paving Ltd · Last contest: 2 bids · awarded at the estimate
Rochford District Council is inviting suitably experienced suppliers to tender for the removal of old safety surfacing and replacing with a rubber wet pour surface in 13 play spaces around the district.
- Published value
- £150k
- Annual run-rate
- —start date not published
- Term
- Estimated end 1 Jan 2027 · start not published
- Reference
ocds-h6vhtk-0415ad
- Ends · in 65 days
Homes England - Independent Distribution Network Provider (IDNO) Provider, Burtree, Darlington
Homes England (the name adopted by the Homes and Communities Agency) · Other public body · North East England
Incumbent: GTC INFRASTRUCTURE LIMITED
Contract novation from Hellens Land Limited for the Independent Distribution Network Provider (IDNO) Provider at Burtree, Darlington. Please note the contract dates on this notice refer to the dates of the contract with Homes England. The a…
Re-procurement plannedHomes England - Independent Distribution Network Operator (IDNO) for site at Wychavon · tender expected
- Published value
- £1.9m
- Annual run-rate
- £1.4mpublished value ÷ term, exc. VAT
- Term
- 20 Aug 2025 → 1 Jan 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-05d23c
- Ends · in 65 daysExtension option · up to 1 Apr 2027Panel · 7 suppliers
Complex Repairs Including Major Repairs, Disrepair, Insurance & Structural works
First Choice Homes Oldham · Other public body · North West England
Panel: Access-able (Uk) Limited, Bradwell Maintenance, Complete Plastering and Damp Proofing Solutions LTD +4 more
Qualified and experienced contractors to undertake complex repairs, component replacements, major works and Disrepair Works across our residential properties. Works may include, but are not limited to, structural repairs, damp remediation, …
- Published value
- £1.0minc. VAT as published
- Annual run-rate
- —panel, not one supplier
- Term
- 25 Sept 2026 → 1 Jan 2027 · 3 months · up to 1 Apr 2027 with extensions
- Reference
ocds-h6vhtk-077f60
- Ends · in 65 days
Henbury Court School Refurbishment
Bristol City Council · Local authority · South West England
Incumbent: NKS Contracts (Central) Ltd · Last contest: awarded 18% over the estimate
Refurbishment of an existing area within Henbury Court Academy to deliver 30 additional SEND school places.
- Published value
- £590k
- Annual run-rate
- —term under 6 months
- Term
- 24 Aug 2026 → 1 Jan 2027 · 4 months
- Reference
ocds-h6vhtk-06b8d0
- Ends · in 65 days
Kitchen and Bathroom Works
Livv Maintenance Limited (part of Livv Housing Group) · Housing · North West England
Incumbent: Carroll Group Limited
Kitchen & Bathroom Upgrade Works
- Published value
- £300k
- Annual run-rate
- £300kpublished value ÷ term, exc. VAT
- Term
- 2 Jan 2026 → 1 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-0688b5
- Ends · in 65 daysExtension option · up to 1 Jan 2028
Rock Face Works (Troopers Hill)
Bristol City Council · Local authority · South West England
Incumbent: Construction Marine Limited
This contract will install a catchment fence on rockface on Troopers Hill.
- Published value
- £110k
- Annual run-rate
- —term under 6 months
- Term
- 1 Aug 2026 → 1 Jan 2027 · 5 months · up to 1 Jan 2028 with extensions
- Reference
ocds-h6vhtk-06d772
- Ends · in 65 daysExtension option · up to 1 Jan 2028
Rock Face Works (Suspension Bridge Road)
Bristol City Council · Local authority · South West England
Incumbent: Construction Marine Limited
This contract will install drape mesh on rockface on Suspension Bridge Road.
- Published value
- £80k
- Annual run-rate
- —term under 6 months
- Term
- 11 Aug 2026 → 1 Jan 2027 · 5 months · up to 1 Jan 2028 with extensions
- Reference
ocds-h6vhtk-06dfbe
- Ends · in 65 days
Osborne Grove Additional Bedroom Provision Project
London Borough of Haringey · Local authority · Nationwide (UK)
Incumbent: TONY BUILDING LTD
Provision of additional bedroom space at Osborne Grove through installation of fire-rated partitions and doors, with associated finishes and electrical adjustments, ensuring compliance with Building Regulations and safeguarding requirements…
- Published value
- £50k
- Annual run-rate
- £98kpublished value ÷ term, exc. VAT
- Term
- 1 Jul 2026 → 1 Jan 2027 · 6 months
- Reference
ocds-h6vhtk-078b72
- Ends · in 65 days
Hawthorn Development Electricity Northwest Electrical Connection
NHS Property Services Limited · NHS & health
Incumbent: ELECTRICITY NORTH WEST
Contract for Hawthorn Development Electricity Northwest Electrical Connection
- Published value
- £47k
- Annual run-rate
- £46kpublished value ÷ term, exc. VAT
- Term
- 1 Jan 2026 → 1 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-0675cc
- Ends · in 65 days
Hawthorn Development Electricity Northwest Electrical Connection, Diversion work
NHS Property Services Limited · NHS & health
Incumbent: ELECTRICITY NORTH WEST
Contract for the diversion work, Hawthorn Development Electricity Northwest Electrical Connection,
- Published value
- £27k
- Annual run-rate
- £27kpublished value ÷ term, exc. VAT
- Term
- 1 Jan 2026 → 1 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-0667d0
- Estimated end · in 66 daysCall-off
building control emergency works
East Riding of Yorkshire Council · Local authority · Yorkshire and the Humber
Incumbent: Westlinks Joiners & Locksmiths · Last contest: 5 bids
- Published value
- £175kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 2 Jan 2027 · start not published
- Reference
ocds-h6vhtk-02ed55
- Ends · in 67 daysCall-off
CRESCENT ROAD PHASE 2A WORKS AND FURTHER PHASES
Caerphilly County Borough Council · Local authority · Wales (Cymru)
Incumbent: Encon Construction Limited · Last contest: 10 bids (10 SME)
- Published value
- £2.6mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 3 Jan 2027 · start not published
- Reference
ocds-h6vhtk-029434
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,836 contracts and agreements end within 24 months, 4,734 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,60979Business services: law, marketing, consulting2,66545Construction work2,10472IT services: consulting, software, internet1,62560Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.