Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 841–855
- Ends · in 72 days
East Lodge building Restoration - Landscaping works
London Borough of Southwark · Local authority · Greater London
Incumbent: Warwick Landscaping Ltd
Landscaping and drainage works around the newly restored Eat Lodge building. These will ensure fully accessible pathways and entrance to the East Lodge and will create a beautiful setting for the historic building will enhance its appeal an…
- Published value
- £986k
- Annual run-rate
- £1.9mpublished value ÷ term, exc. VAT
- Term
- 6 Jul 2026 → 8 Jan 2027 · 6 months
- Reference
ocds-h6vhtk-078074
- Ends · in 72 days
Boroughwide Replacement of Cold Water Communal Tanks (Ph.10)
London Borough of Wandsworth · Local authority
Incumbent: T Brown Group Ltd
Replacement of cold water storage cisterns in local authority residential blocks (Phase 10). Please refer to tender documents for full information.
- Published value
- £597k
- Annual run-rate
- £924kpublished value ÷ term, exc. VAT
- Term
- 18 May 2026 → 8 Jan 2027 · 8 months
- Reference
ocds-h6vhtk-06ad2a
- Ends · in 72 days
Refurbishment works at Kirkby Stephen Health Centre
NHS Property Services Limited · NHS & health
Incumbent: CLC Contractors Ltd
Refurbishment works for Kirkby Stephen Health Centre
- Published value
- £303k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 8 Jan 2027 · 3 months
- Reference
ocds-h6vhtk-077601
- Ends · in 72 days
Chickerell Road and Dulverton Avenue Remedial Works
Swindon Borough Council · Local authority · South West England
Incumbent: Midlands Building & Maintenance Limited
Swindon Borough Council have awarded the Contract for the Structural Remedial Works at Chickerell Road and Dulverton Avenue. The works will be carried out to the superstructure of the property. The works include exterior and interior works …
- Published value
- £166k
- Annual run-rate
- £313kpublished value ÷ term, exc. VAT
- Term
- 29 Jun 2026 → 8 Jan 2027 · 6 months
- Reference
ocds-h6vhtk-06cc11
- Ends · in 72 days
STA-26041 Borehole drilling and Pump Installation
Royal Holloway and Bedford New College · Education · South East England
Incumbent: NICHOLLS COUNTRYSIDE CONSTRUCTION LIMITED
Awarded to Nicholls Countryside Construction Ltd for drilling a borehole and installing a pump to abstract ground water to irrigate sports pitches.
- Published value
- £69k
- Annual run-rate
- —not computed
- Term
- 13 Jul 2026 → 8 Jan 2027 · 6 months
- Reference
ocds-h6vhtk-06e809
- Ends · in 72 daysExtension option · up to 29 Jan 2027
Property Refurbishment to 158 Oxford Road Burnley BB11 3HL
Burnley Borough Council · Local authority · North West England
Incumbent: MAMAD HOME LTD · Last contest: awarded 3% over the estimate
Burnley Borough Council (the Contracting Authority) are inviting Tenders from organisations (Bidders) that have the resources, capabilities and capacity to undertake full house refurbishment works, to 158 Oxford Road. Works can include patc…
- Published value
- £56k
- Annual run-rate
- —term under 6 months
- Term
- 24 Sept 2026 → 8 Jan 2027 · 4 months · up to 29 Jan 2027 with extensions
- Reference
ocds-h6vhtk-06cd86
- Ends · in 72 days
Waterfront illuminations
Stockton on Tees Borough Council · Local authority · North East England
Incumbent: Powercare Electrical Services Limited
The works include the supply and installation of LED lighting to four mature riverside trees and a number of smaller feature trees within Waterfront Park. Lighting equipment has a lead time of approximately 4 to 6 weeks, excluding customs c…
- Published value
- £54k
- Annual run-rate
- —term under 6 months
- Term
- 28 Sept 2026 → 8 Jan 2027 · 3 months
- Reference
ocds-h6vhtk-078b56
- Ends · in 72 days
UPS battery replacement - SNICU (MPH)
Somerset NHS Foundation Trust · Central government · South West England
Incumbent: ENHANCED POWER SERVICES LIMITED
Replacement of UPS battery banks serving the SNICU UPS system at Musgrove Park Hospital, including removal and disposal of existing batteries, supply and installation of replacement sealed lead-acid batteries, testing, and associated electr…
- Published value
- £49k
- Annual run-rate
- £97kpublished value ÷ term, exc. VAT
- Term
- 9 Jul 2026 → 8 Jan 2027 · 6 months
- Reference
ocds-h6vhtk-06cd79
- Ends · in 72 days
Hisehope Groove Mine Conservation and Consolidation
NATURAL ENGLAND (Defra Network eTendering Portal) · Central government · North East England
Incumbent: Countryside Consultants · Last contest: awarded 22% under the estimate
Production of conservation and consolidation plan for the Hisehope Groove mine to include , scope and specification of works, identify potential contractors, evaluate tender returns, selection of preferred contractor and oversee delivery of…
- Published value
- £6k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 8 Jan 2027 · 3 months
- Reference
ocds-h6vhtk-06eace
- Estimated end · in 73 days
DfI:2309911-Belfast Tidal Flood Alleviation Scheme
Department for Infrastructure - Rivers · Central government · Northern Ireland
Incumbent: CHARLES BRAND GROUP LIMITED · Last contest: 8 bids (0 SME)
The objective of this procurement is for the provision of Develop and Build services by an Economic Operator’s Team (EOT). The EOT will complete the detailed develop and build of a tidal flood defence for Belfast along the tidal reach of th…
- Published value
- £33m
- Annual run-rate
- —start date not published
- Term
- Estimated end 9 Jan 2027 · start not published
- Reference
ocds-h6vhtk-02e5d8
- Estimated end · in 73 days
Award Notice - Planned Boiler Replacement Programme & Associated Works
London Borough of Hillingdon · Local authority · Nationwide (UK)
Incumbent: TSG Building Services plc · Last contest: 6 bids · awarded 22% over the estimate
Award Notice. The London Borough of Hillingdon is looking for a suitably qualified contractor to conduct a programme of planned boiler replacements with associated works across a variety of dwellings within the London Borough of Hillingdon.…
- Published value
- £11m
- Annual run-rate
- —start date not published
- Term
- Estimated end 9 Jan 2027 · start not published
- Reference
ocds-h6vhtk-034649
- Ends · in 73 days
PLA26055 Bay of Lights 2026 – Ice Rink Provider
Torbay Council · Local authority · South West England
Incumbent: Icescape
Ice rink to be delivered during Bay of Lights event 2026
- Published value
- £173k
- Annual run-rate
- —term under 6 months
- Term
- 9 Sept 2026 → 9 Jan 2027 · 4 months
- Reference
ocds-h6vhtk-077c36
- Ends · in 73 days
Gas Boiler Replacement to Audley & Queens Park Learning Centre
Blackburn With Darwen Borough Council · Local authority · North West England
Incumbent: LANCASHIRE GAS SERVICES LIMITED
Remove in their entirety, the two existing gas fired boilers and install two 120kw Ideal Evo max boilers, c/w shunt pumps and standard height mounting frames at Audley and Queens Park Neighbourhood Learning Centre, as indicated in the speci…
- Published value
- £66k
- Annual run-rate
- —term under 6 months
- Term
- 30 Nov 2026 → 9 Jan 2027 · 41 days
- Reference
ocds-h6vhtk-078fd9
- Ends · in 74 daysPanel · 2 suppliers
Energy Centre for new Leighton Hospital
Mid Cheshire Hospitals NHS Foundation Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: SP Manweb, Scottish Power
Provision of an Energy Centre for the New Leighton Hospital in Crewe
- Published value
- £600k
- Annual run-rate
- —panel, not one supplier
- Term
- 24 Apr 2025 → 10 Jan 2027 · 1.8 yrs
- Reference
ocds-h6vhtk-050700
- Ends · in 74 days
Energy Centre for New Leighton Hospital
Mid Cheshire Hospitals NHS Foundation Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Scottish Power
Provision of an Energy Centre for the New Leighton Hospital in Crewe
- Published value
- £600k
- Annual run-rate
- £325kpublished value ÷ term, exc. VAT
- Term
- 8 Mar 2025 → 10 Jan 2027 · 1.8 yrs
- Reference
ocds-h6vhtk-050700
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,836 contracts and agreements end within 24 months, 4,734 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,60979Business services: law, marketing, consulting2,66545Construction work2,10472IT services: consulting, software, internet1,62560Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.