Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 931–945

  1. Ends · in 93 days

    St George's Guildhall & Creative Hubs Main Contractor

    Borough Council of King's Lynn & West Norfolk · Local authority · East of England

    Incumbent: Messenger Construction Ltd · Last contest: 2 bids · awarded 45% over the estimate

    St George’s Guildhall in Kings Lynn is the largest surviving medieval Guildhall in the UK and the oldest theatrical space in the UK still in use, with performances occurring every century since the 1400s. The Borough Council of King’s Lynn …

    • Construction work
    Published value
    £20m
    Annual run-rate
    —start date not published
    Term
    Ends 29 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0491d6
  2. Ends · in 93 days

    Ivydale Primary School Refurbishment

    London Borough of Southwark · Local authority · Greater London

    Incumbent: Stonegrove Limited

    Building wide refurbishment including decorations, installation of new lift, new LED lighting, fire protection measures

    Published value
    £2.8m
    Annual run-rate
    £5.0mpublished value ÷ term, exc. VAT
    Term
    13 Jul 2026 → 29 Jan 2027 · 7 months
    Reference
    ocds-h6vhtk-078d52
  3. Ends · in 93 days

    HotHS - Phase 2 Health and Wellbeing Hub (PCSA)

    Barnsley Metropolitan Borough Council · Local authority · Yorkshire and the Humber

    Incumbent: Willmott Dixon Construction Limited and Be Living Holdings Limited 2 3 4 5 6 7

    The works involve the development of a Health and Wellbeing Hub in the Alhambra Shopping Centre as part of the Health on the High Street initiative. This is the Pre-Construction Services Agreement (PCSA) to cover RIBA Stage 3 and Stage 4 de…

    Published value
    £2.3minc. VAT as published
    Annual run-rate
    £1.8mpublished value ÷ term, inc. VAT
    Term
    25 Oct 2025 → 29 Jan 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-05f04f
  4. Ends · in 93 days

    S278 Creswell Grove, Stafford

    Staffordshire County Council · Local authority · West Midlands

    Incumbent: Alto Construct Ltd

    The County Council has entered into a S278 Agreement with Strawson Holdings Limited relating to the commercial development on Land South Of Creswell Grove Adjoining M6 Creswell Grove Creswell. The scheme involves construction of a new prior…

    Published value
    £1.3m
    Annual run-rate
    £1.7mpublished value ÷ term, exc. VAT
    Term
    5 May 2026 → 29 Jan 2027 · 9 months
    Reference
    ocds-h6vhtk-0697ec
  5. Ends · in 93 days

    Chippenham Hospital Window Replacement Scheme

    NHS Property Services Limited · NHS & health

    Incumbent: MJG Mechanical Services Limited

    Chippenham Hospital Window Replacement Scheme

    Published value
    £976k
    Annual run-rate
    —term under 6 months
    Term
    9 Sept 2026 → 29 Jan 2027 · 5 months
    Reference
    ocds-h6vhtk-06f70a
  6. Ends · in 93 days

    Ffordd Penrhos – Active Travel Phase 4

    Cyngor Gwynedd · Other public body · Nationwide (UK)

    Incumbent: Alun Griffiths (Contractors) Limited (a6 a8 a9 b3 b4 b5 c3 c4 c5 d2 d3) · Last contest: awarded 25% under the estimate

    The purpose of the scheme is to improve and widen the existing footpath to a shared used path at Ffordd Penrhos, Bangor continuing eastward from already constructed Phase 1 from Coed Mawr including construction of 1 controlled crossing.

    Published value
    £525k
    Annual run-rate
    —term under 6 months
    Term
    17 Aug 2026 → 29 Jan 2027 · 5 months
    Reference
    ocds-h6vhtk-06bdc7
  7. Ends · in 93 days

    Aids and Adaptation Construction Works at four dwellings

    Central Bedfordshire Council · Local authority · East of England

    Incumbent: Modplan · Last contest: awarded 18% under the estimate

    Aids and Adaptation Construction Works at four dwellings Please read and follow the information and guidance supplied below and within the Tender documents, this will help with your tender submission. Word count limits apply, any informatio…

    Published value
    £369k
    Annual run-rate
    £607kpublished value ÷ term, exc. VAT
    Term
    22 Jun 2026 → 29 Jan 2027 · 7 months
    Reference
    ocds-h6vhtk-064a11
  8. Ends · in 93 days

    Area-5 - 2026-27 - Window & Door Programme 3

    Winchester City Council · Local authority · South East England

    Incumbent: Emplas Window Systems Limited

    UPVc window and door replacements to WCC owned properties in: Fieldway, Denmead; St Mary's Close, Droxford; Hoe Road, Bishops Waltham & Penfords Paddock, Bishops Waltham.

    Published value
    £295kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    7 Sept 2026 → 29 Jan 2027 · 5 months
    Reference
    ocds-h6vhtk-06f23e
  9. Ends · in 93 days

    WCC Area 5 Window Replacement Programme 2

    Winchester City Council · Local authority · South East England

    Incumbent: THE FASCIA PLACE LIMITED

    UPVc window & Door replacement programme for Area 5. Brookside Rd, Denmead, Chestnut Close, Denmead & Spring Lane, Colden Common.

    Published value
    £270kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    17 Aug 2026 → 29 Jan 2027 · 5 months
    Reference
    ocds-h6vhtk-06ebaa
  10. Ends · in 93 daysExtension option · up to 29 Jan 2029

    Perimeter Gates and Fencing at KWF

    Home Office · Central government

    Incumbent: Hill & Smith Infrastructure Ltd

    Like for like replacement of fencing and gates at King's Warehouse Finningley moving from temporary to permanent solution

    Published value
    £166k
    Annual run-rate
    £166kpublished value ÷ term, exc. VAT
    Term
    30 Jan 2026 → 29 Jan 2027 · 1 yr · up to 29 Jan 2029 with extensions
    Reference
    ocds-h6vhtk-0612a4
  11. Ends · in 93 days

    M53 Clatterbridge N&S - Deck Replacement - BT Openreach

    National Highways Limited · Central government

    Incumbent: British Telecommunications Plc

    Service diversion allows the replacement of the central deck. Thereby increasing the lifespan of the structure (instead of full bridge replacement).

    Published value
    £156k
    Annual run-rate
    £153kpublished value ÷ term, exc. VAT
    Term
    23 Jan 2026 → 29 Jan 2027 · 1 yr
    Reference
    ocds-h6vhtk-0781d1
  12. Ends · in 94 days

    Royal & Derngate Works

    West Northamptonshire Council · Local authority · East Midlands

    Incumbent: MYC Group (UK) Ltd

    Works are required to areas of the theatre’s roof, fenestration and PV installation as per the included specification. The works shall be carried out in/on a “live” and busy building so additional methods to protect people must be used. The…

    Published value
    £1.5minc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    1 Sept 2026 → 30 Jan 2027 · 5 months
    Reference
    ocds-h6vhtk-06ad05
  13. Ends · in 94 days

    Surveys of Emergency Lighting Systems

    NHS Wales Shared Services Partnership-Procurement Services (hosted by Velindre University NHS Trust) · NHS & health · Wales (Cymru)

    Incumbent: Tremorfa Limited · Last contest: 6 bids (6 SME) · awarded 26% over the estimate

    The NHS Wales Shared Services Partnership (NWSSP), hosted by Velindre NHS Trust are acting on behalf of Cardiff and Vale University Local Health Board who are seeking to award a contract for Surveys of Emergency Lighting Systems. The Capita…

    • Other electrical installation work
    Published value
    £535k
    Annual run-rate
    —start date not published
    Term
    Ends 30 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0438e6
  14. Ends · in 94 days

    Balfour Court Cladding Removal Works

    mhs homes group · Other public body · South East England

    Incumbent: Axis Europe

    To erect scaffold and remove cladding at Balfour Court

    Published value
    £167k
    Annual run-rate
    £111kpublished value ÷ term, exc. VAT
    Term
    31 Jul 2025 → 30 Jan 2027 · 1.5 yrs
    Reference
    ocds-h6vhtk-058c7d
  15. Ends · in 94 days

    Leamington Justice Centre Boiler Replacement Project WPA25-0101A

    The Police and Crime Commissioner for Warwickshire · Police & fire · West Midlands

    Incumbent: AP Mitchell Building Services Ltd

    The Police & Crime Commissioner for Warwickshire (the Authority) has awarded contracts for the delivery of a boiler replacement project for Warwickshire Police (the Force) at the Justice Centres in Leamington Spa and Nuneaton. The requireme…

    Published value
    £152k
    Annual run-rate
    £127kpublished value ÷ term, exc. VAT
    Term
    21 Nov 2025 → 30 Jan 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-05f150

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,836 contracts and agreements end within 24 months, 4,734 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months927
  2. 3–6 months580
  3. 6–12 months597
  4. 12–24 months732

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.