Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,051–1,065

  1. Ends · in 114 days

    England Coastal Paths IOW2

    Isle of Wight NHS Trust · Local authority · South East England

    Incumbent: M.C.M. CONSTRUCTION LIMITED

    the provision of works to the England coastal path section IOW2, Wootton Bridge to Culver. The King Charles III England Coast Path (ECP) is a nationwide initiative to provide a 2,700-mile National Trail and is being funded through Natural E…

    Published value
    £313k
    Annual run-rate
    —term under 6 months
    Term
    14 Sept 2026 → 19 Feb 2027 · 5 months
    Reference
    ocds-h6vhtk-065ddb
  2. Ends · in 114 days

    57 Chase Vale Refurb

    Lichfield District Council · Local authority · West Midlands

    Incumbent: Tyrer Building Contractors Ltd

    Reconfiguration to create a more accessible bungalow. The bungalow will have a level access shower, accessible kitchen and door widenings throughout.

    Published value
    £87k
    Annual run-rate
    —term under 6 months
    Term
    26 Oct 2026 → 19 Feb 2027 · 4 months
    Reference
    ocds-h6vhtk-078e9e
  3. Estimated end · in 115 days

    East Region (Moray and Aberdeenshire)

    Forestry and Land Scotland · Scotland

    Incumbent: CR Contractors Tain Limited · Last contest: 2 bids (2 SME)

    • Road-maintenance works
    Published value
    £3.0mlist or panel total repeated on every provider; not this contract's value
    Annual run-rate
    —list or panel total, not a run-rate
    Term
    Estimated end 20 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-0316a7
  4. Estimated end · in 115 days

    East Region (Moray and Aberdeenshire)

    Forestry and Land Scotland · Scotland

    Incumbent: CR Contracting North LTD · Last contest: 2 bids (2 SME)

    • Road-maintenance works
    Published value
    £3.0mlist or panel total repeated on every provider; not this contract's value
    Annual run-rate
    —list or panel total, not a run-rate
    Term
    Estimated end 20 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-0316a7
  5. Estimated end · in 116 daysCall-offPanel · 9 suppliers

    South East England

    Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England

    Panel: BOWMER AND KIRKLAND LIMITED, Galliford Try Construction Limited, ISG Construction Limited +6 more · Last contest: 16 bids (0 SME)

    To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…

    • Construction work
    Published value
    £1.5bnvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-033785
  6. Estimated end · in 116 daysCall-offPanel · 9 suppliers

    London

    Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England

    Panel: BOWMER AND KIRKLAND LIMITED, Galliford Try Construction Limited, ISG Construction Limited +6 more · Last contest: 17 bids (1 SME)

    To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…

    • Construction work
    Published value
    £1.5bnvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-033785
  7. Estimated end · in 116 daysCall-offPanel · 11 suppliers

    South West England

    Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England

    Panel: BAM CONSTRUCTION LIMITED, Bouygues UK, Galliford Try Construction Limited +8 more · Last contest: 11 bids (0 SME)

    To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…

    • Construction work
    Published value
    £1.1bnvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-033785
  8. Estimated end · in 116 daysCall-offPanel · 7 suppliers

    West Region of SW England

    Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England

    Panel: AJC Developments (South) Ltd, Halsall Construction Ltd, Kier Construction Ltd +4 more · Last contest: 10 bids (6 SME)

    To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…

    • Construction work
    Published value
    £200mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-033785
  9. Estimated end · in 116 daysCall-offPanel · 6 suppliers

    East Region of SW England

    Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England

    Panel: E.W. Beard Limited, Halsall Construction Ltd, Kier Construction Ltd +3 more · Last contest: 12 bids (5 SME)

    To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…

    • Construction work
    Published value
    £200mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-033785
  10. Estimated end · in 116 daysFramework recordPanel · 16 suppliers

    Fusion21 Painting, Decorating and Associated Repairs Framework

    Fusion21 Members Consortium · Nationwide (UK)

    Panel: A Connolly Limited, Alfred Bagnall & Sons (North West) Limited, Architectural Decorators Ltd +13 more

    • Painting work
    Published value
    £125mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-038b4b
  11. Estimated end · in 116 days

    Hydrogen Campus - Site Infrastructure Works

    Energy Transition Zone Limited · Scotland

    Incumbent: CHAP Group (Aberdeen) Ltd · Last contest: 2 bids (2 SME)

    ETZ Ltd has a requirement to appoint a suitably qualified firm who can complete the site infrastructure works, located at ETZ Hydrogen Campus, Aberdeen.

    • Site preparation and clearance work
    Published value
    £4.1m
    Annual run-rate
    —start date not published
    Term
    Estimated end 21 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-05cf1b
  12. Ends · in 116 days

    72 London Road Refurbishment

    Cross Keys Homes · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: BSG PROPERTY SERVICES

    CKH intends to undertake remedial works to the vacant property at 72 London Road, Peterborough to create a 5 room HMO using Cross Keys Homes' component specifications. The tender is to be priced against all elements of work individually to …

    Published value
    £180k
    Annual run-rate
    —term under 6 months
    Term
    21 Sept 2026 → 21 Feb 2027 · 5 months
    Reference
    ocds-h6vhtk-07773b
  13. Estimated end · in 117 daysFramework record

    Provision of Competitive Land, Design and Build Framework for NIHE Belfast, North and South Regions

    Arbour Housing · Northern Ireland

    Incumbent: ADVANCE ACCOUNTING NI LTD

    • Construction work
    Published value
    £35mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 22 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-04c156
  14. Ends · in 117 days

    Lotherton Hall – Kiosk Replacement

    Leeds City Council · Local authority · Yorkshire and the Humber

    Incumbent: Igloo Contractors Ltd · Last contest: awarded 11% under the estimate

    Leeds Building Services (LBS) have a requirement for a subcontractor to design, supply, and install a replacement visitor kiosk at the Lotherton Hall Estate. The existing kiosk, over 20 years old, has reached the end of its operational life…

    Published value
    £27k
    Annual run-rate
    —term under 6 months
    Term
    4 Jan 2027 → 22 Feb 2027 · 2 months
    Reference
    ocds-h6vhtk-06d853
  15. Ends · in 118 days

    Refurbishment of the Lifts at Tennyson Lodge

    West Kent Housing Association · Housing · South East England

    Incumbent: AMALGAMATED LIFTS LIMITED

    *This is for information only, as the contract has been awarded*. West Kent is seeking tenders from suitably experienced and qualified Contractors to carry out works to the lifts at Tennyson Lodge, which is categorised as a “higher risk bui…

    Published value
    £385k
    Annual run-rate
    £386kpublished value ÷ term, exc. VAT
    Term
    24 Feb 2026 → 23 Feb 2027 · 1 yr
    Reference
    ocds-h6vhtk-065beb

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,836 contracts and agreements end within 24 months, 4,734 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months927
  2. 3–6 months580
  3. 6–12 months597
  4. 12–24 months732

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.