Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 12 months
Showing 721–730
- Ends · in 62 days
Blade Repairs
ORE Catapult · Other public body · Scotland
Incumbent: DHR Blades Ltd
This award is to appoint a blade repair provider for LDT's Blade C based on estimate repair for 8 weeks (24 hour working period) plus materials and equipment hire. Schedules of rates were requested from three blade repair companies.
- Published value
- £250kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 23 Oct 2026 → 31 Dec 2026 · 2 months
- Reference
ocds-h6vhtk-078c5b
- Ends · in 62 days
Re-roofing concrete tile/artificial slate / Fascia/soffit
Housing 21 · Central government · Yorkshire and the Humber
Incumbent: Innercity roofing (Yorkshire) Ltd
Re-roofing concrete tile/artificial slate / Fascia/soffit at Brough Court.
- Published value
- £214k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-06e46c
- Ends · in 62 days
Fire Panel Upgrades and Detector Upgrades
National Oceanography Centre · Other public body · South East England
Incumbent: Premier Fire Security Ltd
The contract covers the replacement and upgrade of the National Oceanography Centre's fire alarm infrastructure, including the replacement of fire alarm control panels, repeater panels, backup batteries, power supplies, and field devices ac…
- Published value
- £196k
- Annual run-rate
- —term under 6 months
- Term
- 3 Sept 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06d33b
- Ends · in 62 days
NGH - Maternity Bereavement Suite
Northampton General Hospital NHS Trust · Central government · East Midlands
Incumbent: J.E.T Construction (Milton Keynes) Limited
Please note there are some changes to the works comprised in contract (Section A. 1.01) which states: ‘The scope of work comprises: The demolition of a redundant timber framed staff changing and storage block and the construction of a new p…
- Published value
- £194k
- Annual run-rate
- —term under 6 months
- Term
- 28 Sept 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-068ad7
- Ends · in 62 days
UKRI-5929 1894 Building West Tower Internal Strip Out
UK Research and Innovation · Central government · Scotland
Incumbent: Navigate Scaffolding Ltd
Undertaking the strip out works within the West Tower of the 1894 Building, including the design, installation, and dismantling of specialist internal scaffolding required to facilitate the removal of the circular staircase.
- Published value
- £187k
- Annual run-rate
- —term under 6 months
- Term
- 24 Sept 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-066c12
- Ends · in 62 days
Paul Street Public Convenience Upgrades
Taunton Town Council · Local authority · South West England
Incumbent: KARESA CONSTRUCTION LTD
Taunton Town Council are looking for a high quality solution from high quality bidders that is clearly focused on the needs of the Town Council's residents. Taunton Town Council is open to creative and innovative ideas. The appointed contra…
- Published value
- £180k
- Annual run-rate
- £202kpublished value ÷ term, exc. VAT
- Term
- 10 Feb 2026 → 31 Dec 2026 · 11 months
- Reference
ocds-h6vhtk-04fa41
- Ends · in 62 days
Contract for Extension Works at 134 Vale Avenue, Brighton
Brighton and Hove City Council · Local authority · South East England
Incumbent: BCS Robertson Ltd
Brighton and Hove City Council is seeking quotations from suitably qualified suppliers for the provision of a two-storey side extension and associated internal and external works at 134 Vale Avenue, Brighton, BN1 8YF. The contract will be f…
- Published value
- £175k
- Annual run-rate
- —term under 6 months
- Term
- 20 Jul 2026 → 31 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-06ce09
- Ends · in 62 days
Star Square Development-Ainsworth Street Works
Blackburn With Darwen Borough Council · Local authority · North West England
Incumbent: Bethell Construction Ltd
Surface Water Drainage Diversion Works for Star Square development
- Published value
- £165k
- Annual run-rate
- —term under 6 months
- Term
- 18 Sept 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-077fe2
- Ends · in 62 days
Separation of units at Portside, Avonmouth
Staffordshire County Council · Local authority · South West England
Incumbent: HILLS CONSTRUCTION (SOUTH WEST) LIMITED
Construction works to split units 1 & 2 Portside Park, Kings Weston Lane, Avonmouth, into separate units.
- Published value
- £160k
- Annual run-rate
- —term under 6 months
- Term
- 10 Sept 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06f8b3
- Ends · in 62 days
Contract for the Execution of External Insulation Cladding and Render System, Penlan, Swansea.
City & County of Swansea · Local authority · Wales (Cymru)
Incumbent: SAM DRYLINING LIMITED
To comply with the current WHQS, works will include the application of insulated render system as detailed in the specification/Works Information. The project details are set out in The Contract Data. Site of the Works Phase 2 – Properties …
- Published value
- £150k
- Annual run-rate
- £256kpublished value ÷ term, exc. VAT
- Term
- 1 Jun 2026 → 31 Dec 2026 · 7 months
- Reference
ocds-h6vhtk-06763c
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,867 contracts and agreements end within 24 months, 4,773 in total · £6.0bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,62579Business services: law, marketing, consulting2,69445Construction work2,12872IT services: consulting, software, internet1,64060Transport services (except waste transport)1,56671Architectural, construction, engineering1,43450Repair and maintenance services1,40780Education and training services1,273
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.