Expiring UK Public Contracts: Retender Radar

Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,156–1,170

  1. Ends · in 135 days

    Retail shop refit - Tintern Abbey and Raglan Castle

    Llywodraeth Cymru / Welsh Government · Central government · Wales (Cymru)

    Incumbent: ARJ CRE8 Ltd

    This notice confirms the award of a contract following a competitive quotation exercise for the design, supply and installation of retail shop refurbishment works at Cadw’s Raglan Castle and Tintern Abbey gift shops. The contract includes t…

    Published value
    £182k
    Annual run-rate
    —term under 6 months
    Term
    12 Oct 2026 → 12 Mar 2027 · 5 months
    Reference
    ocds-h6vhtk-078631
  2. Ends · in 135 days

    CBC-2091-Q-SM New replacement "Exit Doors"

    Central Bedfordshire Council · Local authority

    Incumbent: RID Ltd

    Central Bedfordshire Council has awarded a contract for the supply and installation of new exit doors across two Council sites. Works will be undertaken on an as-and-when-required basis during the contract term and will include site surveys…

    Published value
    £60k
    Annual run-rate
    —not computed
    Term
    14 Sept 2026 → 12 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-06f7f3
  3. Ends · in 136 days

    Infrastructure Development Agreement Faverdale/Burtree Garden Village

    Darlington Borough Council · Local authority · North East England

    Incumbent: Homes England

    Infrastructure Development Agreement Faverdale/Burtree Garden Village

    Published value
    £1.4m
    Annual run-rate
    £725kpublished value ÷ term, exc. VAT
    Term
    14 Mar 2025 → 13 Mar 2027 · 2 yrs
    Reference
    ocds-h6vhtk-0682a8
  4. Ends · in 136 daysExtension option · up to 13 Mar 2028

    Monmouth Shire Hall - EFO - H26-0201

    Monmouthshire County Council · Local authority · Wales (Cymru)

    Incumbent: The Hub Build Limited · Last contest: awarded 20% over the estimate

    The Monmouth Shire Hall Exhibition Works project aims to deliver an engaging, interactive visitor experience through a series of interpretive exhibits. This initiative is part of a broader heritage interpretation strategy led by Monmouthshi…

    Published value
    £745k
    Annual run-rate
    £743kpublished value ÷ term, exc. VAT
    Term
    13 Mar 2026 → 13 Mar 2027 · 1 yr · up to 13 Mar 2028 with extensions
    Reference
    ocds-h6vhtk-05eff1
  5. Estimated end · in 137 days

    Water System Risk Assessments & Water Hygiene Monitoring

    City of Bradford Metropolitan District Council · Local authority · Yorkshire and the Humber

    Incumbent: Aquatrust Water and Ventilation Ltd · Last contest: 6 bids

    The Council was seeking tenders from suitably qualified Water Hygiene contractors to provide the prevention, risk management and control of Legionella bacteria in water systems. This requires the undertaking of a monitoring programme of all…

    • Water-treatment work
    Published value
    £900k
    Annual run-rate
    —start date not published
    Term
    Estimated end 14 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0416b4
  6. Estimated end · in 137 days

    BSH/HRA Barton Hill Major Refurbishment

    Bristol City Council · Local authority · South West England

    Incumbent: SERS Energy Solutions Limited · Last contest: 3 bids

    Barton Hill Major Refurbishment

    • Construction work
    Published value
    £18m
    Annual run-rate
    —start date not published
    Term
    Estimated end 14 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-03a177
  7. Ends · in 137 days

    Doncaster Future Parks, Grove Gardens

    City of Doncaster Council · Local authority · Yorkshire and the Humber

    Incumbent: BRAMBLEDOWN LANDSCAPES · Last contest: awarded 19% over the estimate

    Delivery of the planned improvements to Grove Gardens green space in Doncaster as set out in this document and associated annexes.

    Published value
    £190k
    Annual run-rate
    £190kpublished value ÷ term, exc. VAT
    Term
    15 Mar 2026 → 14 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-060218
  8. Estimated end · in 138 days

    ANDBC Pre-Qualification Questionnaire - Works Contract for Redevelopment of Ward Park, Bangor

    Ards and North Down Borough Council · Local authority · Northern Ireland

    Incumbent: John McQuillan Contracts Ltd · Last contest: 5 bids (4 SME) · awarded 48% under the estimate

    Ward Park is an existing park situated off Castle Street, Bangor. It is owned and managed by Ards and North Down Borough Council. The project is for the provision of restoration and improvement works to the Park. The Park will be updated to…

    • Works for complete or part construction and civil engineering work
    Published value
    £2.3m
    Annual run-rate
    —start date not published
    Term
    Estimated end 15 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-04b08a
  9. Ends · in 138 days

    GSMD Cyclical Works 2026 - 2027

    The Mayor and Commonalty and Citizens of the City of London · Local authority · Greater London

    Incumbent: Team Project Ltd

    The City of London Corporation (the City) invited Tenders for a single‑supplier framework for the provision of a principal contractor to deliver years  2 - 5 of the five‑year cyclical works programme (CWP) for the Guildhall School of Music …

    Published value
    £2.1m
    Annual run-rate
    £3.6mpublished value ÷ term, exc. VAT
    Term
    18 Aug 2026 → 15 Mar 2027 · 7 months
    Reference
    ocds-h6vhtk-06ed76
  10. Ends · in 138 daysExtension option

    Design and Build Works for Mains Sewer Connection at High Lodge

    Forestry Commission · Other public body · East of England

    Incumbent: ARTHUR CIVIL ENGINEERING LIMITED · Last contest: awarded 7% over the estimate

    Connection of High Lodge Forest Centre to the mains sewer, approximately 2.4 km from the current discharge point. A Section 106 agreement with Anglian Water is already in place, and a preferred route for the connection has been identified.

    Published value
    £1.1m
    Annual run-rate
    —not computed
    Term
    16 Sept 2026 → 15 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-0661b3
  11. Ends · in 138 days

    Specialist Ventilation Installation and Modification Works

    West Suffolk NHS Foundation Trust · Central government

    Incumbent: DPL Group Ltd

    Provision of specialist ventilation works within Theatre 7 and Theatre 9, including the modification, installation, testing and commissioning of ventilation and associated mechanical building services systems. The works support the Trust in…

    Published value
    £350k
    Annual run-rate
    £351kpublished value ÷ term, exc. VAT
    Term
    16 Mar 2026 → 15 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-06dd79
  12. Ends · in 138 days

    MFF167 2025-2028 Moorland Restoration Ground Works Package 4 Westend Head Swains Greave Planting Works

    Peak District National Park Authority · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands

    Incumbent: UPLAND ENVIRONMENTAL LTD

    1.The objective of this Contract is to deliver a suite of Moorland Restoration Works on 2 areas in the Upper Derwent Valley in the Peak District National Park. The sites are split into 6 packages of Works. The aim of the Works suites are to…

    Published value
    £113k
    Annual run-rate
    £136kpublished value ÷ term, exc. VAT
    Term
    18 May 2026 → 15 Mar 2027 · 10 months
    Reference
    ocds-h6vhtk-05594f
  13. Ends · in 138 days

    Lot 1

    Peak District National Park Authority · Other public body · Yorkshire and the Humber

    Incumbent: N66 LTD

    Published value
    £70k
    Annual run-rate
    £67kpublished value ÷ term, exc. VAT
    Term
    3 Mar 2026 → 15 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-05ea49
  14. Ends · in 138 days

    Bathroom Look Repair

    North East London NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: Mosaic Property Management Ltd

    PO to rectify leak issues in female changing room - remove and replace flooring/insulation and hygiene boards in the female changing rooms

    Published value
    £17k
    Annual run-rate
    £17kpublished value ÷ term, exc. VAT
    Term
    16 Mar 2026 → 15 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-066fcd
  15. Ends · in 140 daysExtension option

    Ironworks Roof Project

    Victoria and Albert Museum · Central government · Greater London

    Incumbent: Coniston Limited

    Roof refurbishment works at V&A South Kensington. Scope comprises the strip-out and disposal of existing water damaged insulation and asphalt roof covering and replacement to the Ironworks Roof area with new, alongside structural investigat…

    Published value
    £1.6m
    Annual run-rate
    —term under 6 months
    Term
    7 Oct 2026 → 17 Mar 2027 · 5 months
    Reference
    ocds-h6vhtk-0786de

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,848 contracts and agreements end within 24 months, 4,753 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months928
  2. 3–6 months583
  3. 6–12 months597
  4. 12–24 months740

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.