  1. Ends · in 155 days

    Lighting CMS Area 3 & 4

    National Highways Limited · Central government · Nationwide (UK)

    Incumbent: UK Electric Ltd t/a BEI Lighting

    Retrospective agreement for Lighting CMS in Area 3 and 4

    Published value
    £16k
    Annual run-rate
    £30kpublished value ÷ term, exc. VAT
    Term
    10 Sept 2026 → 31 Mar 2027 · 7 months
    Reference
    ocds-h6vhtk-06f6ab
  2. Ends · in 155 days

    Watnall Structured Cabling Upgrade

    Met Office · Central government · South West England

    Incumbent: TALKWIRE LIMITED

    Structured cabling services during Watnall FSC building refurbishment.

    Published value
    £15k
    Annual run-rate
    —not computed
    Term
    1 Oct 2026 → 31 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-06897f
  3. Ends · in 155 days

    EV Chargers. Inspire Walker St. Quotation Reference 1577755000238967045 - Quote 20273 - swop out replace with 2 x dual chargers

    Humber Teaching NHS Foundation Trust · NHS & health · Yorkshire and the Humber

    Incumbent: Mer Fleet Services Limited

    HFT 26 / 27. 08. EV Chargers. Inspire Walker St. Quotation Reference 1577755000238967045 - Quote 20273 - swop out replace with 2 x dual chargers

    Published value
    £13k
    Annual run-rate
    £25kpublished value ÷ term, exc. VAT
    Term
    16 Sept 2026 → 31 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-078b0d
  4. Ends · in 157 daysExtension option · up to 2 Apr 2031

    UKRI-5440 - Control Systems for Superconducting Quantum Computing Research

    UK Research and Innovation · Central government · Nationwide (UK)

    Incumbent: Zurich Instruments AG · Last contest: awarded 30% over the estimate

    Published value
    £6.5m
    Annual run-rate
    £6.5mpublished value ÷ term, exc. VAT
    Term
    3 Apr 2026 → 2 Apr 2027 · 1 yr · up to 2 Apr 2031 with extensions
    Reference
    ocds-h6vhtk-061609
  5. Ends · in 162 days

    DDaT26233 - Programmable Logic Controller Components

    UK Research and Innovation · Central government · Nationwide (UK)

    Incumbent: Underwoods electrical Distributors

    ***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. UK Research and Innovation had a requirement for components for a programmab…

    Published value
    £16k
    Annual run-rate
    £16kpublished value ÷ term, exc. VAT
    Term
    8 Apr 2026 → 7 Apr 2027 · 1 yr
    Reference
    ocds-h6vhtk-068e4a
  6. Estimated end · in 167 daysFramework recordPanel · 9 suppliers

    2G (REBCO-based) HTS Tape Supply Framework for STEP

    UK Fusion Energy Ltd · Nationwide (UK)

    Panel: Faraday Factory Japan LL, Faraday Factory Japan LLC, Fujikura Europe Ltd. +6 more

    • Electric conductors for data and control purposes
    Published value
    £1.5mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 12 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-04c88d
  7. Ends · in 174 days

    9004557 - Supply of a Canted 3-Pole Wiggler for Diamond Light Source

    DIAMOND LIGHT SOURCE LIMITED · Central government · South East England

    Incumbent: SCANDITRONIX MAGNET AB · Last contest: awarded 2% under the estimate

    Located on the Harwell Science & Innovation Campus in Oxfordshire, Diamond Light Source (DLS) is a leading-edge facility for science, engineering and innovation. DLS allows researchers from academia and industry to investigate the structure…

    Published value
    £196k
    Annual run-rate
    £208kpublished value ÷ term, exc. VAT
    Term
    11 May 2026 → 19 Apr 2027 · 11 months
    Reference
    ocds-h6vhtk-0669ea
  8. Ends · in 177 days

    Supply of Motion Controllers

    DIAMOND LIGHT SOURCE LIMITED · South East England

    Incumbent: Faraday Motion Controls Ltd · Last contest: 6 bids

    DLS are looking for a replacement standard Motion Control Platform capable of driving a range of precision motors and providing high levels of accuracy, repeatability and response. The controller must be able to perform control of complex m…

    • Electrical machinery, apparatus, equipment and consumables; lighting
    Published value
    £0
    Annual run-rate
    —start date not published
    Term
    Ends 22 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-02c983
  9. Estimated end · in 182 days

    MBE System

    University of Sheffield · Charity · Yorkshire and the Humber

    Incumbent: DCA Instruments Oy · Last contest: 4 bids

    The EPSRC National Epitaxy Facility (NEF) based at the University of Sheffield has been providing bespoke semiconductor wafers to academia and industry for 45 years. It is a unique world-class centre combining technical excellence and exper…

    • Microelectronic machinery and apparatus and microsystems
    Published value
    £4.9m
    Annual run-rate
    —start date not published
    Term
    Estimated end 27 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-04dd08
  10. Ends · in 185 days

    Storage Ring Quadrupole Magnets

    DIAMOND LIGHT SOURCE LIMITED · South East England

    Incumbent: Sigmaphi · Last contest: 5 bids (4 SME)

    Located on the Harwell Science and Innovation Campus in Oxfordshire, Diamond is a leading edge facility for science, engineering and innovation. Diamond allows researchers from academia and industry to investigate the structure and behaviou…

    • Magnets
    Published value
    £7.4m
    Annual run-rate
    —start date not published
    Term
    Ends 30 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-040ec4
  11. Ends · in 185 days

    Supply, Installation and Commissioning of Circuit Breakers

    AWE PLC · Central government

    Incumbent not published

    Procurement for the supply, installation and commissioning of circuit breakers.

    Published value
    £917k
    Annual run-rate
    —not computed
    Term
    1 May 2026 → 30 Apr 2027 · 1 yr
    Reference
    ocds-h6vhtk-06749d
  12. Ends · in 185 days

    LED LIGHTING FOR THE PALACE THEATRE

    Newark And Sherwood District Council · Local authority · East Midlands

    Incumbent: ENLIGHTENED LIGHTING LIMITED · Last contest: awarded at the estimate

    This project involves the procurement of replacement LED lamps and light fittings throughout the Palace Theatre, with the aim of reducing energy consumption, lowering running costs, improving reliability, and minimising ongoing maintenance …

    Published value
    £350kinc. VAT as published
    Annual run-rate
    £603kpublished value ÷ term, inc. VAT
    Term
    1 Oct 2026 → 30 Apr 2027 · 7 months
    Reference
    ocds-h6vhtk-06a9f0
  13. Ends · in 187 days

    PO/2026/1131/CO

    University of Exeter · Central government

    Incumbent: Kroptek Ltd

    Supply, delivery, and installation of Sunstream MK2 600W KP04 4-channel lighting system (40 units) with DALI controllability and integration into existing BMS controls at the University of Exeter (Penryn Campus).

    Published value
    £45k
    Annual run-rate
    £45kpublished value ÷ term, exc. VAT
    Term
    2 May 2026 → 2 May 2027 · 1 yr
    Reference
    ocds-h6vhtk-06f8f8
  14. Estimated end · in 191 days

    C326 - Supply of 11kV Sectionalisers and 11kV & 33kV Reclosures

    NIE Networks Limited · Northern Ireland

    Incumbent: NOJA Power Switchgear Pty Ltd

    • Parts of transformers, inductors and static converters
    Published value
    £6.9m
    Annual run-rate
    —start date not published
    Term
    Estimated end 6 May 2027 · start not published
    Reference
    ocds-h6vhtk-04ac64
  15. Estimated end · in 191 days

    C326 - Supply of 11kV Sectionalisers and 11kV & 33kV Reclosures

    Northern Ireland Electricity Networks Limited · Northern Ireland

    Incumbent: NOJA Power Switchgear Pty Ltd

    • Parts of transformers, inductors and static converters
    Published value
    £2.1m
    Annual run-rate
    —start date not published
    Term
    Estimated end 6 May 2027 · start not published
    Reference
    ocds-h6vhtk-04ac64

When contracts end · Electrical machinery
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

215 contracts and agreements end within 24 months, 325 in total · £65m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months47
  2. 3–6 months67
  3. 6–12 months40
  4. 12–24 months61

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.