Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,976–2,000

  1. Estimated end · in 318 days

    Tiree Terminal New Building, Marshalling Area & Traffic Management Works

    Caledonian Maritime Assets Ltd (Utility) · Scotland

    Incumbent: Mackenzie Construction Ltd · Last contest: 5 bids (2 SME)

    The existing terminal building at Tiree as reached the end of its' serviceable life' and is to be replaced with a new, modern building along with additional works to increase the capacity of the marshalling area and improve the footways and…

    • Building construction work
    Published value
    £3.9m
    Annual run-rate
    —start date not published
    Term
    Estimated end 10 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-05ff91
  2. Estimated end · in 320 daysFramework recordPanel · 10 suppliers

    Intermediate Construction Framework 3 (ICF 3)

    Hampshire County Council · Local authority · South East England, South West England, Wales (Cymru)

    Panel: Ascia Construction Limited, Doswell Projects Limited, ETEC CONTRACT SERVICES LTD +7 more

    The new ICF Framework will have two lots: Lot 1 - The type of project or programmes is expected to consist mostly of extensions, refurbishments, and alterations to existing schools; however, any type of building work to any property includi…

    • Construction work
    Published value
    £200mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 12 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-037f91
  3. Estimated end · in 321 days

    Almond Housing Association Design, Supply and Installation of External Wall Insulation and Associated Works

    Almond Housing Association · Housing · Scotland

    Incumbent: Everwarm Ltd · Last contest: 6 bids (0 SME)

    The Works comprise of the replacement of existing external wall insulation, painting to base courses, provide new uPVC soffits, fascia, gutters and downpipes, top up loft insulation and all associated works to various properties located thr…

    • Insulation work
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 13 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-03e327
  4. Ends · in 321 days

    Clent Way Roof Replacement 2026

    Greensquareaccord · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: J.HARPER & SONS(LEOMINSTER)LIMITED · Last contest: awarded 51% under the estimate

    Roofing works including asbestos removal and full roof replacement to three blocks where damage has been identified at Clent Way, Birmingham.

    Published value
    £306k
    Annual run-rate
    £306kpublished value ÷ term, exc. VAT
    Term
    14 Sept 2026 → 13 Sept 2027 · 1 yr
    Reference
    ocds-h6vhtk-069d8e
  5. Ends · in 321 daysExtension option · up to 31 Mar 2028

    CBC-2083-Q-SM CBC industry Units refurbishments

    Central Bedfordshire Council · Local authority

    Incumbent: GB Construction (Herts) Limited

    Central Bedfordshire Council has awarded a contract for refurbishment and repair works to Council-owned industrial units. The contract covers a range of building maintenance and refurbishment activities across the units, including associate…

    Published value
    £33k
    Annual run-rate
    £33kpublished value ÷ term, exc. VAT
    Term
    14 Sept 2026 → 13 Sept 2027 · 1 yr · up to 31 Mar 2028 with extensions
    Reference
    ocds-h6vhtk-06f781
  6. Ends · in 321 days

    Carpark Line Marking

    North East London NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: James Roofing & Construction Ltd

    Carpark Line Marking renewal for Goodmayes

    Published value
    £17k
    Annual run-rate
    £17kpublished value ÷ term, exc. VAT
    Term
    14 Sept 2026 → 13 Sept 2027 · 1 yr
    Reference
    ocds-h6vhtk-077510
  7. Ends · in 322 days

    PFR SGB East, North DA Tower Recladding

    Nuclear Restoration Services Limited · Other public body

    Incumbent: AJ Engineering & Construction Services Ltd

    • Replacement cladding to the Steam Generator Building North Wall. • Replacement cladding to the Steam Generator Building East Wall (including high level and low-level sections and removal of redundant glazing structures); and • Replacement…

    Published value
    £2.2minc. VAT as published
    Annual run-rate
    £1.9mpublished value ÷ term, inc. VAT
    Term
    8 Jul 2026 → 14 Sept 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-0778f8
  8. Ends · in 322 days

    Frogpool (CHL 162) JCT

    COASTLINE DESIGN AND BUILD LIMITED · Other public body · South West England

    Incumbent: Classic Builders (South West) Ltd

    Construction of 9 new affordable homes and associated infrastructure at Trelyn, Frogpool, Cornwall.

    Published value
    £2.1minc. VAT as published
    Annual run-rate
    £1.7mpublished value ÷ term, inc. VAT
    Term
    30 Jun 2026 → 14 Sept 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-066e17
  9. Ends · in 322 days

    C5833 Disability Adaptation Works (SR2008098)

    Cheshire East Council · Local authority · North West England

    Incumbent: JRB Construction Ltd

    Cheshire East Council has been appointed as the agent for the householders at the address. In our role as agent, we (the council) are designing and specifying the work, appointing a Contractor to carry out the work, and making payments for …

    Published value
    £44k
    Annual run-rate
    £45kpublished value ÷ term, exc. VAT
    Term
    18 Sept 2026 → 14 Sept 2027 · 1 yr
    Reference
    ocds-h6vhtk-0777bd
  10. Estimated end · in 323 daysFramework recordPanel · 34 suppliers

    Roads and Infrastructure Framework

    South Lanarkshire Council · Local authority · Scotland

    Panel: Advance Construction (Scotland) Ltd, Amalgamated Construction Ltd, Apex Traffic Management Ltd +31 more

    • Construction work for highways, roads
    Published value
    £24mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 15 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-038620
  11. Estimated end · in 323 days

    Responsive and Planned Maintenance – Fire Protection Chargeable Contracts

    London Borough of Southwark · Local authority · Greater London

    Incumbent: PRB Estates Limited · Last contest: 11 bids

    The Authority is seeking to procure two contracts (Contracts A & B) for a period of three years, which will include the option, at the Authority’s sole discretion, to extend up to a maximum of one year through the implementation of the exte…

    • Construction work

    Re-procurement plannedFire Protection Chargeable Contracts (North and South) · tender expected

    Published value
    £8.0m
    Annual run-rate
    —start date not published
    Term
    Estimated end 15 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-033b57
  12. Estimated end · in 323 days

    Responsive and Planned Maintenance – Fire Protection Chargeable Contracts

    London Borough of Southwark · Local authority · Greater London

    Incumbent: Ductclean (Uk) Limited · Last contest: 11 bids

    The Authority is seeking to procure two contracts (Contracts A & B) for a period of three years, which will include the option, at the Authority’s sole discretion, to extend up to a maximum of one year through the implementation of the exte…

    • Construction work

    Re-procurement plannedFire Protection Chargeable Contracts (North and South) · tender expected

    Published value
    £8.0m
    Annual run-rate
    —start date not published
    Term
    Estimated end 15 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-033b57
  13. Ends · in 323 daysExtension option · up to 15 Sept 2028

    UKRI-6169 - Height Safety Systems Maintenance

    UK Research and Innovation · Central government · South East England

    Incumbent: Harmony Fire Ltd

    Provision of Height Safety Systems, Access, Stair, Walkways and Flagpole Maintenance

    Published value
    £670k
    Annual run-rate
    £594kpublished value ÷ term, exc. VAT
    Term
    31 Jul 2026 → 15 Sept 2027 · 1.2 yrs · up to 15 Sept 2028 with extensions
    Reference
    ocds-h6vhtk-06b967
  14. Ends · in 323 daysExtension option · up to 15 Mar 2028

    CAPRO122 Jubilee Building Isolation Valve Replacement Works

    Somerset NHS Foundation Trust · Central government · South West England

    Incumbent: R.T.S. Engineering (Somerset) LTD

    Replacement of existing fibre washer insert isolation valves with new union-jointed lever-operated isolation valves, including survey, supply, installation, pipework modifications, fittings, and insulation within the Jubilee Building at Mus…

    Published value
    £258k
    Annual run-rate
    £258kpublished value ÷ term, exc. VAT
    Term
    16 Sept 2026 → 15 Sept 2027 · 1 yr · up to 15 Mar 2028 with extensions
    Reference
    ocds-h6vhtk-07765a
  15. Ends · in 324 days

    National Gallery Research Centre Excavation and Structures

    The National Gallery · Central government · Greater London

    Incumbent: Erith Contractors Ltd · Last contest: awarded 6% under the estimate

    The purpose of this project is to create a connection between the Sainsbury Wing and Wilkins Building and transforming an existing space into a modern, functional research facility designed for both staff and public use. The works are divid…

    Published value
    £4.7m
    Annual run-rate
    £3.9mpublished value ÷ term, exc. VAT
    Term
    8 Jul 2026 → 16 Sept 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-05f5f4
  16. Estimated end · in 326 days

    Fire Doors Replacement Works 2024

    Bromford Flagship LiveWest Limited · Housing · East of England

    Incumbent: BELL GROUP LTD · Last contest: 23 bids · awarded 47% over the estimate

    Flagship Housing Group intend to roll out a 3-year program of fire door upgrades/replacement to our existing stock portfolio. The purpose of this tender is to appoint an approved contractor that can deliver quality and quantity to approved …

    • Installation of doors and windows and related components
    Published value
    £5.5m
    Annual run-rate
    —start date not published
    Term
    Estimated end 18 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-046e43
  17. Ends · in 326 days

    Guttering maintenance

    Somerset NHS Foundation Trust · Central government · South West England

    Incumbent: Access Specilaist contracts Ltd

    Guttering maintenance at Musgrove Park Hospital

    Published value
    £96k
    Annual run-rate
    £95kpublished value ÷ term, exc. VAT
    Term
    18 Sept 2026 → 18 Sept 2027 · 1 yr
    Reference
    ocds-h6vhtk-07758a
  18. Ends · in 326 days

    Chestnuts Day Centre Upgrades (2026)

    West Sussex County Council · Local authority

    Incumbent: Falcon Homes (Sussex) Ltd

    Chestnuts Day Centre - Upgrade Velux windows, soffits, facias and rainwater goods across the site.

    Published value
    £95k
    Annual run-rate
    £83kpublished value ÷ term, exc. VAT
    Term
    28 Jul 2026 → 18 Sept 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-06d535
  19. Estimated end · in 327 days

    PS-25-251 - Ayrshire Innovation Park, Phase 3 – Construction of Industrial Units (PRJ0013527)

    East Ayrshire Council · Local authority · Scotland

    Incumbent: Clark Contracts Ltd · Last contest: 4 bids (0 SME) · awarded 17% under the estimate

    The Ayrshire Engineering Park (AEP) project will contribute towards meeting current demand for new industrial space within East Ayrshire and Ayrshire, where there is a lack of high quality sites and premises that support the growth ambition…

    • Construction work for warehouses and industrial buildings
    Published value
    £12m
    Annual run-rate
    —start date not published
    Term
    Estimated end 19 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-05f31d
  20. Estimated end · in 328 daysCall-off

    Demolition of Quarryhouse Footbridge (Nevilles Cross)

    Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: MGL Demolition Limited · Last contest: 11 bids (2 SME)

    Demolition of Quarryhouse Footbridge (Nevilles Cross) Under Framework Agreement Framework for Demolition (including Asbestos Removal) 2024 DN 745591

    • Construction work
    Published value
    £51kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 20 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-04a47c
  21. Estimated end · in 329 daysFramework recordPanel · 8 suppliers

    General Builders Framework

    NHS Greater Glasgow and Clyde · NHS & health · Scotland

    Panel: BSL Interiors Limited, Clyde Contracts & Supplies, DBM Building Contractors Ltd +5 more

    • Construction work
    Published value
    £3.5mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-04e7d2
  22. Ends · in 329 days

    Replacement air conditioning unit Server Room

    Stevenage Borough Council · Local authority · East of England

    Incumbent: Pitkin and Ruddock

    Daneshill House. Replacement air conditioning units to serve the Server Room.

    Published value
    £31k
    Annual run-rate
    £31kpublished value ÷ term, exc. VAT
    Term
    21 Sept 2026 → 21 Sept 2027 · 1 yr
    Reference
    ocds-h6vhtk-0773bf
  23. Ends · in 329 days

    Internal Alterations at Diabetes Centre

    North East London NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: AD ARCHITECTS LIMITED

    Internal Alterations to Accommodate Community Mental Health Services at Diabetes Centre

    Published value
    £25k
    Annual run-rate
    £25kpublished value ÷ term, exc. VAT
    Term
    22 Sept 2026 → 21 Sept 2027 · 1 yr
    Reference
    ocds-h6vhtk-077a44
  24. Estimated end · in 330 daysFramework recordPanel · 3 suppliers

    Technical Surveys - Drainage Surveys

    Cyngor Gwynedd Council · Local authority · Wales (Cymru)

    Panel: Lanes Group Limited, Severn Partnership Ltd, ddc Engineering Solutions Ltd

    • Drainage works
    Published value
    £2.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 22 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-046928
  25. Ends · in 330 days

    High Lane Estate (Colne, dee, Humber court and the community center)

    London Borough of Ealing · Local authority · Greater London

    Incumbent: Goody Demolition Ltd

    The project comprises the full demolition to slab level of three residential buildings, Humber Court, Dee Court, and Colne Court and a Community Centre

    Published value
    £1.7m
    Annual run-rate
    £1.5mpublished value ÷ term, exc. VAT
    Term
    10 Aug 2026 → 22 Sept 2027 · 1.1 yrs
    Reference
    ocds-h6vhtk-077ac2

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.