Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 81–90
- Ends · in 3 days
YNE Form C Pont and Blyth
Environment Agency · Central government · North East England
Incumbent: Northumberland Wildlife Trust
A highly specialized peat restoration project, for which NWT/NPP has proven expertise, having closely collaborated with the EA Peatland team in its development. Their depth of knowledge in this area is unparalleled by any other consultants …
- Published value
- £50k
- Annual run-rate
- £29kpublished value ÷ term, exc. VAT
- Term
- 31 Jan 2025 → 30 Oct 2026 · 1.8 yrs
- Reference
ocds-h6vhtk-06dda0
- Ends · in 3 days
Willesborough Infant School: Roof Repair
Kent County Council · Local authority
Incumbent: GJM Southern Group Ltd
Willesborough Infant School: Roof Repair - Structural repair works to failing lintels in the main building. The cost would be £49,837.44
- Published value
- £50k
- Annual run-rate
- —term under 6 months
- Term
- 21 Aug 2026 → 30 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06ea7f
- Ends · in 3 days
1-2 Edgar Buildings Refurbishment Works
Bath & North East Somerset Council · Local authority · South West England
Incumbent: NKS Contracts Limited
1-2 Edgar Buildings Refurbishment Works The total value of this contract's 1 month term is £49,681.65 (excl. VAT) The total value of this contract's 1 month term is £59,617.98 (incl. VAT)
- Published value
- £50k
- Annual run-rate
- —term under 6 months
- Term
- 18 Oct 2026 → 30 Oct 2026 · 13 days
- Reference
ocds-h6vhtk-07837d
- Ends · in 3 days
Williamstown Primary New ALN Room
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: 2D Building Contractors
Williamstown Primary New ALN Room 2026
- Published value
- £49k
- Annual run-rate
- —term under 6 months
- Term
- 16 Jul 2026 → 30 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06d311
- Ends · in 3 days
Block TA roof renewal and external wall cladding repairs
Somerset Council · Local authority · South West England
Incumbent: CIG SW LTD
Urgent D1 priority condition maintenance works involving the replacement of Block TA life-expired flat roof coverings, repairs to external Steni wall-cladding panels and renewal of timber entrance door
- Published value
- £48k
- Annual run-rate
- —term under 6 months
- Term
- 12 Aug 2026 → 30 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-0774d6
- Ends · in 3 days
St Pauls Boundary wall repair
Somerset Council · Local authority · South West England
Incumbent: Abacus Construction Ltd
to rebuild the boundary wall-repair
- Published value
- £47k
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 30 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06cc3f
- Ends · in 3 days
Little Dewchurch Primary Boiler Upgrade
Herefordshire Council · Local authority · West Midlands
Incumbent: CF Roberts (Electrical Contractors) Limited
Boiler upgrade works at Little Dewchurch Primary School
- Published value
- £47k
- Annual run-rate
- —term under 6 months
- Term
- 25 Sept 2026 → 30 Oct 2026 · 36 days
- Reference
ocds-h6vhtk-07887a
- Ends · in 3 days
Scooter Store
Housing 21 · Central government · West Midlands
Incumbent: CLC Contractors Ltd
Scooter Store - Howard Court (Flitwick)
- Published value
- £46k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 30 Oct 2026 · 26 days
- Reference
ocds-h6vhtk-06d842
- Ends · in 3 daysExtension option · up to 30 Dec 2026
Installation Works for the Reintroduce of Grazing Cattle
South Gloucestershire Council · Local authority · South West England
Incumbent: CABOT LANDSCAPES LTD
Infrastructure works for the re-introduction of grazing cattle on Siston Common, including drainage works, cycle cattle grids, fencing and gate installation. The required installation works were identified through a funded survey.
- Published value
- £45k
- Annual run-rate
- —term under 6 months
- Term
- 6 Aug 2026 → 30 Oct 2026 · 3 months · up to 30 Dec 2026 with extensions
- Reference
ocds-h6vhtk-077480
- Ends · in 3 days
Unisex Toilets
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: Wright Construction Ltd
Construct, supply and install 2 No. Unisex in Block E Gr. Floor.
- Published value
- £45k
- Annual run-rate
- £44kpublished value ÷ term, exc. VAT
- Term
- 29 Oct 2025 → 30 Oct 2026 · 1 yr
- Reference
ocds-h6vhtk-05d978
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.