Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1–50

  1. Estimated end · todayPanel · 2 suppliers

    External Cyclical Maintenance

    Northern Ireland Housing Executive · Northern Ireland

    Panel: PK Murphy, PK Murphy Construction Limited · Last contest: 13 bids (1 SME)

    NIHE would like to procure suitable qualified Contractors to carry out external cyclical maintenance to properties throughout the Belfast and South Regions.

    • Construction work
    Published value
    £8.0m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 26 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-041052
  2. Estimated end · todayPanel · 2 suppliers

    External Cyclical Maintenance

    Northern Ireland Housing Executive · Northern Ireland

    Panel: S+D Properrty Maintenance Ltd, S+D Property Maintenance Ltd · Last contest: 13 bids (1 SME)

    • Construction work
    Published value
    £7.8m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 26 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-041052
  3. Estimated end · today

    External Cyclical Maintenance Works

    Northern Ireland Housing Executive · Northern Ireland

    Incumbent: MASCOTT CONSTRUCTION EUROPE LTD · Last contest: 13 bids (1 SME)

    • Construction work
    Published value
    £6.9m
    Annual run-rate
    —start date not published
    Term
    Estimated end 26 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-041052
  4. Estimated end · today

    Colintraive Terminal Building Extension

    Caledonian Maritime Assets Ltd (Utility) · Scotland

    Incumbent: Alltec Construction Ltd · Last contest: 7 bids (4 SME)

    Construction of extension on to rear wall of existing terminal building. Strip back of concrete roof and replacement of roof covering and new extension roof with new roof covering. Internal down takings and new fit out to form new internal …

    • Construction work
    Published value
    £371k
    Annual run-rate
    —start date not published
    Term
    Estimated end 26 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-05adc8
  5. Ends · today

    TD2228 - Council House Lift Refurbishment (2025)

    Derby City Council · Local authority · East Midlands

    Incumbent: Concept Elevators (UK) Ltd · Last contest: 2 bids · awarded at the estimate

    Derby City Council (the Council) is undertaking this procurement to establish a contract for the refurbishment of one existing passenger lift at the Council House, Derby. The procurement process adopted by the Council is based on the 'Open'…

    • Lift installation work
    Published value
    £110k
    Annual run-rate
    —start date not published
    Term
    Ends 26 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-04c9fd
  6. Estimated end · todayFramework recordPanel · 8 suppliers

    Retail Shop Design & Fit-Out Framework

    Historic Environment Scotland · Scotland

    Panel: Bentleys Shopfitting Ltd, Cubit Design Limited, Effective Visual Marketing Ltd T/A EVM +5 more

    • Building completion work
    Published value
    £2.3mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 27 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-0459c7
  7. Estimated end · todayPanel · 2 suppliers

    Asbestos Removal 2024 - Lot 1 - Residential

    Bromford Flagship LiveWest Limited · Housing · Nationwide (UK)

    Panel: Broadland Group Limited, Vertex Asbestos Removal Limited · Last contest: 9 bids

    Flagship Group would like to appoint suppliers to deliver its entire asbestos removal strategy, this will include works to seal, repair, or remove asbestos containing material identified in asbestos surveys. ​The current housing stock consi…

    • Asbestos-removal work
    Published value
    £2.2m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 27 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-047d99
  8. Ends · in 5 days

    Replacement Cemetery Fencing

    Winscombe and Sandford Parish Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: SB Fencing Contractors Ltd · Last contest: 6 bids

    replacement fence

    • Erection of fencing
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Ends 31 Oct 2026 · start not published
    Reference
    ocds-h6vhtk-06bf79
  9. Estimated end · in 8 days

    Sirinham Point - Replacement of Glazed Rainscreen

    Metropolitan Housing Trust · Housing · Greater London

    Incumbent: PiLON Ltd · Last contest: 2 bids · awarded 57% over the estimate

    remove Glazing and frame to plant room at roof level and replace with Blockwork. Design and build with Gateway 2 Submission Required.

    • Engineering works and construction works
    Published value
    £235k
    Annual run-rate
    —start date not published
    Term
    Estimated end 3 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-04c204
  10. Estimated end · in 8 days

    Bronllwyn Adult Care Development

    Rhondda Cynon Taf CBC · Wales (Cymru)

    Incumbent: LANGSTONE CONSTRUCTION GROUP LTD · Last contest: 4 bids (4 SME)

    The proposed scheme, Bronllwyn Care Home, comprises of the design & construction of the 14nr bed adult care facility together with all associated external works, drainage works, service connections, including any adoptions required to provi…

    • Construction work
    Published value
    £7.8m
    Annual run-rate
    —start date not published
    Term
    Estimated end 4 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-041d0e
  11. Estimated end · in 8 days

    DH20043 - Painting & Decorating Contract

    Derby Homes Ltd · East Midlands

    Incumbent: Buxton Decorators · Last contest: 12 bids (7 SME) · awarded 7% under the estimate

    Derby Homes contract for Painting & Decorating to new build, void properties, the Derby Homes one room decoration scheme and other associated works

    • Decoration work
    Published value
    £2.1m
    Annual run-rate
    —start date not published
    Term
    Estimated end 4 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-02d5c7
  12. Estimated end · in 8 days

    Shrub Hill - Isaac Maddox House - Phase 2 Refurbishment Works

    Worcestershire County Council · Local authority · West Midlands

    Incumbent: Speller Metcalfe Ltd. · Last contest: 2 bids (0 SME)

    The refurbishment of Isaac Maddox House, and office building in Shrub Hill, Worcester.As part of the Shrub Hill Industrial Estate development the Council is seeking a Construction contractor to complete the deign and carry out the refurbish…

    • Construction work
    Published value
    £191k
    Annual run-rate
    —start date not published
    Term
    Estimated end 4 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-046f10
  13. Estimated end · in 9 daysFramework recordPanel · 24 suppliers

    PfH Scotland EESSH2 Framework

    Procurement for Housing · Scotland

    Panel: A.C. Whyte & Co. Ltd., BRB Electrical Limited, British Gas Social Housing Ltd trading as PH Jones +21 more

    • Refurbishment work
    Published value
    £300mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 5 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-02aa91
  14. Estimated end · in 9 days

    Lift Maintenance Services

    Accent Group Ltd · North East England, North West England, Yorkshire and the Humber, East Midlands, East of England, South East England

    Incumbent: ORONA LIMITED · Last contest: 8 bids

    Contract Award following an open competition for Lift maintenance services to Accent Housing Ltd providing national coverage to its schemes and homes. Accent Housing Ltd (Accent) are seeking the services of one Contractor to support deliver…

    • Construction work
    Published value
    £306k
    Annual run-rate
    —start date not published
    Term
    Estimated end 5 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-02c318
  15. Estimated end · in 10 days

    Contract

    the Education Authority · Education · Northern Ireland

    Incumbent: Bell Contracts · Last contest: 17 bids (1 SME) · awarded 7% over the estimate

    Appointment of Integrated Supply Team for the construction of new 8 class primary school on existing extended site. The project will include full construction works, mechanical and electrical services, external and site development works.

    • Building construction work

    Re-procurement plannedAppointment of Integrated Supply Team for Iveagh Primary School · tender expected

    Published value
    £5.6m
    Annual run-rate
    —start date not published
    Term
    Estimated end 5 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-047933
  16. Estimated end · in 10 days

    Lift and Lay of Floor Coverings

    East Ayrshire Council · Local authority · Scotland

    Incumbent: Ian Logan Carpets Ltd · Last contest: 2 bids (1 SME)

    Lift and Lay of Floor Coverings

    • Floor laying and covering work
    Published value
    £300k
    Annual run-rate
    —start date not published
    Term
    Estimated end 6 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-03fc8a
  17. Estimated end · in 11 daysFramework recordPanel · 29 suppliers

    Outdoor Play and Sports Facilities Framework

    Scotland Excel · Scotland

    Panel: ALLPLAY IRELAND LIMITED, Abacus Playgrounds Ltd, Active Playground Management Ltd. +26 more

    • Construction work
    Published value
    £60mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 7 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-02f952
  18. Estimated end · in 14 days

    Lot 1 Mechanical and Electrical maintenance works (Area North) (Council area Mid and East Antrim and Antrim and Newtownabbey)

    the Education Authority · Education · Northern Ireland

    Incumbent: Irwin ME Ltd · Last contest: 7 bids (7 SME)

    The Measured Term Service Short Contract for the Provision of Mechanical and Electrical: Response, Planned Maintenance and Minor Works Lots 1, 2 and 3. Works / Services include the following Core Skill Disciplines: Mechanical and Electrical…

    • Refurbishment work
    Published value
    £35m
    Annual run-rate
    —start date not published
    Term
    Estimated end 10 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-03df29
  19. Estimated end · in 14 days

    Lot 3 Mechanical and Electrical maintenance works (Area South West) (Council area Armagh, Banbridge and Craigavon)

    the Education Authority · Education · Northern Ireland

    Incumbent: Totalis Solutions Ltd · Last contest: 7 bids (7 SME)

    The Measured Term Service Short Contract for the Provision of Mechanical and Electrical: Response, Planned Maintenance and Minor Works Lots 1, 2 and 3. Works / Services include the following Core Skill Disciplines: Mechanical and Electrical…

    • Refurbishment work
    Published value
    £28m
    Annual run-rate
    —start date not published
    Term
    Estimated end 10 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-03df29
  20. Estimated end · in 14 days

    Lot 2 Mechanical and Electrical maintenance works (Area East) (Council area Lisburn and Castlereagh and Ards and North Down)

    the Education Authority · Education · Northern Ireland

    Incumbent: C H C GROUP LTD · Last contest: 7 bids (7 SME)

    The Measured Term Service Short Contract for the Provision of Mechanical and Electrical: Response, Planned Maintenance and Minor Works Lots 1, 2 and 3. Works / Services include the following Core Skill Disciplines: Mechanical and Electrical…

    • Refurbishment work
    Published value
    £19m
    Annual run-rate
    —start date not published
    Term
    Estimated end 10 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-03df29
  21. Estimated end · in 15 daysFramework recordPanel · 6 suppliers

    BHFT 0362 - EDTS Construction Services Framework

    Berkshire Healthcare NHS Foundation Trust · NHS & health · Nationwide (UK)

    Panel: D M HABENS (THE BUILDER) LTD, E.W. Beard Limited, LGCS (Southern) Limited +3 more

    • Construction work for buildings relating to health
    Published value
    £8.8mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 11 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-03d740
  22. Estimated end · in 17 days

    Capital Building Works

    East Sussex Fire Authority · Police & fire · Nationwide (UK), South East England

    Incumbent: Trail Group Ltd · Last contest: 6 bids · awarded at the estimate

    East Sussex Fire Authority wished to award a contract for multiple Capital Works projects over the next 3 years to refurbish stations to reduce the risk of on site fire contaminant products. It is expected each specific project will cost be…

    • Construction work for buildings relating to law and order or emergency services and for military buildings
    Published value
    £8.0m
    Annual run-rate
    —start date not published
    Term
    Estimated end 13 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-03d705
  23. Ends · in 18 days

    Bramcote Leisure Centre

    Nottinghamshire County Council · Local authority · East Midlands

    Incumbent: G F Tomlinson Building Limited · Last contest: 3 bids · awarded 16% over the estimate

    Construction of a new part single, part two storey Leisure Centre to comprising pool, fitness studios and changing village, demolition of existing facility along with associated temporary and permanent car parking.

    • Construction work of leisure facilities
    Published value
    £18m
    Annual run-rate
    —start date not published
    Term
    Ends 13 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-04a442
  24. Estimated end · in 18 daysDynamic purchasing system record

    SEC Responsive Repairs, Voids, Planned Works DPS

    South East Consortium · Nationwide (UK), Greater London

    Incumbent: Masher Brothers Ltd

    • Ground-drainage work
    Published value
    £500mpublished ceiling for the whole dynamic purchasing system
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 14 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-02c6a7
  25. Estimated end · in 19 days

    Kitchen, bathrooms and associated works

    Golding Homes · South East England

    Incumbent: Mulalley & Company Limited · Last contest: 10 bids (0 SME) · awarded at the estimate

    Kitchen and Bathroom installations

    • Building construction work

    Re-procurement openGH2011 Kitchen and Bathrooms Refurbishment · bids close

    Published value
    £15m
    Annual run-rate
    —start date not published
    Term
    Estimated end 15 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-03c3f9
  26. Estimated end · in 19 days

    GCPN-SteelBuild-2025

    Godmanchester Town Council · Local authority · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: ANMER CONSTRUCTION LIMITED · Last contest: 6 bids

    1. Introduction Godmanchester Town Council invites tenders from suitably qualified contractors for the supply, delivery, and full construction of a steel-framed building (13m x 13m) at their Community Plant Nursery. Godmanchester Community …

    • Building completion work
    Published value
    £118k
    Annual run-rate
    —start date not published
    Term
    Estimated end 15 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-050dd2
  27. Estimated end · in 21 days

    Camden Building Term Service Contract 3 - Void Refurbishment North

    London Borough of Camden · Local authority · Greater London

    Incumbent: SER Contractor Ltd · Last contest: 26 bids · awarded 13% under the estimate

    • Lock changes for all properties. • Appropriate landlord compliance checks and certificates: Landlord Gas Safety test, electrical safety tests, asbestos survey and removal, if required, water hygiene safety test, if required, and Energy Pe…

    • Refurbishment work

    Re-procurement plannedCamden Building Term Service Contract - Void Refurbishment North · tender expected

    Published value
    £7.9m
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-0290cc
  28. Estimated end · in 21 daysFramework recordPanel · 2 suppliers

    Framework for the Design, Measure, Supply & Installation of Lot 1 Aluminium Windows, Doors & Curtain Walling, Lot 2 PVCu, Doors & Curtain Walling and Lot 3 Associated Ancillaries 2024

    Durham County Council · Local authority · North East England

    Panel: GLC PROJECTS LTD, Sirius Demolition

    • Construction work
    Published value
    £4.0mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 17 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-049925
  29. Estimated end · in 22 days

    Dorchester Pavilion Refurbishment

    Dorchester Parish Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Timothy Fisher Builders Ltd · Last contest: 8 bids

    Contract for the refurbishment & extension of the Pavilion.

    • Construction work
    Published value
    £32k
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-06719b
  30. Estimated end · in 22 daysFramework recordPanel · 2 suppliers

    Supply of Crane Hire and Contracted Lifts

    THAMES WATER UTILITIES LIMITED · Greater London, South East England

    Panel: Ainscough Crane Hire Limited, Emerson Crane Hire Ltd

    • Hire of cranes with operator
    Published value
    £1.8mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 18 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-02af0d
  31. Estimated end · in 23 days

    Works Up to Max 28M GBP (15M GBP for Any One Order)

    North Lanarkshire Council · Local authority · Scotland

    Incumbent: Sidey Solutions Limited · Last contest: 7 bids (4 SME)

    North Lanarkshire Council wish to seek a competent contractor for the provision of a Measured Term Contract for Replacement of Windows and Doors 2025-2027 to domestic properties within North Lanarkshire. The works comprise the removal (incl…

    • Installation of doors and windows and related components
    Published value
    £28m
    Annual run-rate
    —start date not published
    Term
    Estimated end 19 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-048605
  32. Estimated end · in 23 days

    Lot 1 - Gas Heating System Installations

    North Lanarkshire Council · Local authority · Scotland

    Incumbent: Saltire Facilities Management Ltd · Last contest: 9 bids (5 SME)

    It is proposed that the scope of services comprise of the removal and replacement of gas heating systems including boilers, radiators, pipework and associated works. The total estimated Contract value is up to 40,000,000 GBP split over two …

    • Central-heating installation work
    Published value
    £24m
    Annual run-rate
    —start date not published
    Term
    Estimated end 19 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-0489bc
  33. Estimated end · in 23 days

    Works Up to Max 28M GBP (15M GBP for Any One Order)

    North Lanarkshire Council · Local authority · Scotland

    Incumbent: Walker Profiles Ltd · Last contest: 6 bids (5 SME)

    North Lanarkshire Council wish to seek a competent contractor for the provision of a Measured Term Contract for Replacement of Windows and Doors 2025-2027 to domestic properties within North Lanarkshire. The works comprise the removal (incl…

    • Installation of doors and windows and related components
    Published value
    £17m
    Annual run-rate
    —start date not published
    Term
    Estimated end 19 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-048605
  34. Estimated end · in 23 days

    Lot 2 - Gas Heating System Installations

    North Lanarkshire Council · Local authority · Scotland

    Incumbent: Gas Call Services Ltd · Last contest: 9 bids (5 SME)

    It is proposed that the scope of services comprise of the removal and replacement of gas heating systems including boilers, radiators, pipework and associated works. The total estimated Contract value is up to 40,000,000 GBP split over two …

    • Central-heating installation work
    Published value
    £16m
    Annual run-rate
    —start date not published
    Term
    Estimated end 19 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-0489bc
  35. Estimated end · in 23 days

    BSH/ HRA St Jude's Block Refurbishment

    Bristol City Council · Local authority · South West England

    Incumbent: Synergize Ltd · Last contest: 1 bid

    St Jude's Block Refurbishment

    • Construction work
    Published value
    £14m
    Annual run-rate
    —start date not published
    Term
    Estimated end 19 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-039b52
  36. Estimated end · in 24 daysCall-off

    OO-CONSTRUCTION -132KV OHL REINFORCEMENT WORKS LT000091 SKYE - 1026

    Scottish Hydro Electric Transmission plc · Nationwide (UK)

    Incumbent: BALFOUR BEATTY UTILITY SOLUTIONS LIMITED AS AGENT OF BALFOUR BEATTY GROUP LIMITED

    • Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 19 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-0323f0
  37. Estimated end · in 24 daysCall-off

    OO-CONSTRUCTION -132KV UGC REINFORCEMENT WORKS LT000091 SKYE - 1026

    Scottish Hydroelectric Transmission Plc · Nationwide (UK)

    Incumbent: Balfour Beatty Utility Solutions Limited

    The tendered works include for the design, supply, installation, testing and commissioning of electricity transmission underground cable works as part of the Skye 132kV Reinforcement scheme. The works consist of 24km of new 132kV double cir…

    • Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 19 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-0323f0
  38. Estimated end · in 25 daysFramework recordPanel · 44 suppliers

    TKAT Asset Management Services Framework Agreement

    THE KEMNAL ACADEMIES TRUST · Education · South East England

    Panel: AHR BUILDING CONSULTANCY LIMITED, Acclaim Contracts Limited, Accurate Roofing Ltd +41 more

    • Construction work for buildings relating to education and research
    Published value
    £22mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-031913
  39. Estimated end · in 25 days

    DUD - Service, Inspection, Maintenance, Repairs and Installation works to Specialist, Electrical, Mechanical and Social Care Systems and Equipment 2021-2026

    Dudley Metropolitan Borough Council · Local authority · West Midlands

    Incumbent: AllHands Ltd T/A Harrold Jones Services · Last contest: 2 bids (2 SME)

    • Electrical installation work
    Published value
    £513k
    Annual run-rate
    —start date not published
    Term
    Estimated end 21 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-02ace6
  40. Estimated end · in 25 daysFramework recordPanel · 6 suppliers

    Cambridge City Council - Action on Energy Cambridgeshire Retrofit Framework

    Cambridge City Council · Local authority · East of England

    Panel: Aran Insulation Ltd, BELL GROUP LTD, Cornerstone (East Anglia) Limited +3 more

    • Construction work
    Published value
    Not publishedlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-035f7f
  41. Estimated end · in 26 days

    Proposed Contract for Domestic Property and Communal Electrical Testing, Remedials and Rewires and Domestic Property and Communal Electrical Responsive Repairs

    Redditch Borough Council · Local authority · Nationwide (UK)

    Incumbent: Citrus Group NW Ltd · Last contest: 14 bids

    Proposed Contract for Domestic Property and Communal Electrical Testing, Remedials and Rewires and Domestic Property and Communal Electrical Responsive Repairs

    • Electrical installation work
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 22 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-03df16
  42. Estimated end · in 30 days

    UKRI-4133 STFC Gutter and Roof Drainage - Cleaning, Maintenance and Remedial Works for Science Technology Facilities Council (STFC) at RAL, COSENER'S House and Chilbolton Observatory

    UK Research and Innovation · Nationwide (UK)

    Incumbent: NSS MAINTENANCE LIMITED · Last contest: 3 bids · awarded at the estimate

    Estates Property Services provides valuable support to the front-line, scientific activities of STFC. This support is wide ranging, from the provision of suitable sites, buildings, workplaces and information and communications technology co…

    • Roof repair and maintenance work
    Published value
    £120k
    Annual run-rate
    —start date not published
    Term
    Estimated end 26 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-04965d
  43. Estimated end · in 31 days

    AT1203 - Replacement Water Goods on Domestic Housing

    Luton Borough Council · Local authority · East of England

    Incumbent: BSG PROPERTY SERVICES · Last contest: 5 bids (5 SME)

    The tender will be for removal works of current rain water goods which compromises of soffits fascia and guttering as well as supplying and installing new soffits fascia and guttering. The contractor will also be required to replace the fel…

    • Flashing and guttering work
    Published value
    £140k
    Annual run-rate
    —start date not published
    Term
    Estimated end 27 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-03e2d5
  44. Estimated end · in 33 days

    Refurbishment of Bught Stadium & New Home of Shinty Pavilion, Inverness

    The Highland Council · Local authority · Scotland

    Incumbent: Clark Contracts Ltd · Last contest: 3 bids (3 SME)

    Demolition of existing changing rooms, refurbishment of existing stadium and erection of new shinty pavilion and new replacement changing rooms.

    • Construction work
    Published value
    £8.1m
    Annual run-rate
    —start date not published
    Term
    Estimated end 28 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-03d575
  45. Estimated end · in 34 days

    NUNCON – Lot 1 - Armson Road – Main Contractor

    Nuneaton and Bedworth Borough Council · Local authority · West Midlands

    Incumbent: J.HARPER & SONS(LEOMINSTER)LIMITED · Last contest: 1 bid (1 SME)

    Lot 1 - Construction of 15 dwellings on the former garage site situated at Armson Road, Bedworth, CV79BT. Lot 2 - Construction of 8 dwellings on the former playground situated between 4 and 14 Cheverel Road, Bedworth, CV12 8HH. The contract…

    • Building construction work
    Published value
    £3.4m
    Annual run-rate
    —start date not published
    Term
    Estimated end 30 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-0484ea
  46. Estimated end · in 34 days

    NUNCON– Lot 2 - Cheveral Road – Main Contractor

    Nuneaton and Bedworth Borough Council · Local authority · West Midlands

    Incumbent: J.HARPER & SONS(LEOMINSTER)LIMITED · Last contest: 1 bid (1 SME)

    Lot 1 - Construction of 15 dwellings on the former garage site situated at Armson Road, Bedworth, CV79BT. Lot 2 - Construction of 8 dwellings on the former playground situated between 4 and 14 Cheverel Road, Bedworth, CV12 8HH. The contract…

    • Building construction work
    Published value
    £1.5m
    Annual run-rate
    —start date not published
    Term
    Estimated end 30 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-0484ea
  47. Ends · in 35 daysFramework recordPanel · 20 suppliers

    NUN - HEART Disabled Aids, Adaptations and Associated Works

    Nuneaton and Bedworth Borough Council · Local authority · West Midlands

    Panel: 3MS Gold Services Ltd, APD Building, Adroit Services Limited +17 more

    • Construction work
    Published value
    £18mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 30 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-0489f1
  48. Ends · in 35 days

    Provision of BCH Fencing Works

    BLACKPOOL COUNCIL · Local authority · North West England

    Incumbent: TW Fencing · Last contest: 5 bids · awarded at the estimate

    Blackpool Coastal Housing (BCH) is looking to appoint a Contractor to undertake Fencing works on the social housing stock. BCH wishes to appoint a Contractor who can clearly demonstrate the ability to meet our requirements and who offers th…

    • Fencing, railing and safety equipment installation work
    Published value
    £150k
    Annual run-rate
    —start date not published
    Term
    Ends 30 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-049225
  49. Ends · in 35 days

    Design and Build

    CHIGWELL PARISH COUNCIL · Local authority · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: Hartley Services Group Ltd · Last contest: 5 bids

    Design and Build Community Hub and Victory Hall refurbishment

    • Construction work
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Ends 30 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-06c27c
  50. Ends · in 36 days

    BREP A38 Junction Improvements

    Worcestershire County Council · Local authority · West Midlands

    Incumbent: Colas Limited · Last contest: 2 bids (0 SME) · awarded 37% under the estimate

    The Council wishes to appoint a suitably experienced Contractor to undertake the construction of the A38 Bromsgrove Route Enhancement Programme (BREP). The appointment will be based on the NEC4 Engineering Construction Contract Option C – T…

    • Construction work
    Published value
    £22m
    Annual run-rate
    —start date not published
    Term
    Ends 1 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-02e7ea

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

944 contracts and agreements end within 24 months, 2,436 in total · £5.1bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months115
  2. 3–6 months149
  3. 6–12 months236
  4. 12–24 months444

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 44 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.